Loading…
Loading…
Tender ID
Tender Value
₹3.2 Cr
EMD Value
₹3.1 L
Closing Date
11 Feb 2026, 3:00 pmClosed
GTL div: Replacement of Leaning/critical and less contact wire height OHE structures due to raising of track with new OHE structure in connection with safety in RU-GY-DMM and WD-GTL-DHNE sections
GTL-TRD-29-eTN-75-2025-26~SCR
GTL-TRD-29-eTN-75-2025-26
Open
Works - General
12 Months
Anantapur, Andhra Pradesh
₹0
₹3.1 L
11 Feb 2026
20 Jan 2026
28 Jan 2026
A2-FOUNDATION ITEMS (incl. Supply & Erection) 6537586.00 Below/P
Item Breakup - A1-OHE & PSI ITEMS
Per Supply & Erection Track KM 1(g)-Design and Preparation of Structure Erected Drawing (SED).
Each 3(a)-Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations.
71.00 Block 3(b)-Erection of TTCs, Portals and Small Parts Steel (SPS)
14.00 Block 3(e) -Supply and Erection of Guy Rod Assembly
36.00 Block 4(a)(i)-Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE
128.00 Block 4(a)(ii)-Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE
32.00 Block GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY 4(a)(iii)-Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE
8.00 Block 7(c)-Erection of Large Span Wire (130 Sq. mm)
300.00 Block 8(a)(iv)-Supply of Regulating Equipment Without Counter-Weight Assembly
Each 8(a)(v)-Supply and Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE
32.00 Block 8(a)(xii)-Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA locations.
Each 8(b)(i)-Supply (without Insulator) and Erection of materials for Termination single conductor of OHE or terminating wire
14.00 Block 8(b)(ii)-Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE
32.00 Block 8(b)(iii)-Supply (without Insulator) and Erection of Materials for Termination of Along Feeder (Aluminium/Copper)
2.00 Block 9(a)-Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Conventional OHE
8.00 Block 11(a)(i)-Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator.
8.00 Block 11(a)(ii)-Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator.
Each GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Rate Power Block 11(b)-Supply (without Insulator) and Erection of 25 kV Post Insulator
8.00 Block 12(a)-Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional OHE
4.00 Block 13(a)-Supply (without Insulators) and Erection o f 25 kV Single Pole Isolator without earth contact assembly
4.00 Block 15(a)-Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) (excluding copper jumper supply)
40.00 Block 15(b)-Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) (excluding copper jumper supply)
24.00 Block 16(a)-Supply and Erection of Structure Bond
Each 16(aa)-Drilling of Holes on Rails
Each 26(a)(ii)-Supply and Erection of 18 mm Copper Bus Bar
Rate Power Block 26(c)(i)-Supply and Erection of Solid Copper Busbar Connector - 18 mm Bus Terminal (6310- 1)
40.00 Block 26(c)(ii)-Supply and Erection of Solid Copper Busbar Connector - 18 mm Bus Splice (6320)
16.00 Block GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY 31(a) -Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support
160.00 Block 31(e) -Splicing and Extension of Anchored OHE
8.00 Block 31(f) -Dismantling of Section Insulator
4.00 Block 31(g) -Slewing and Putting back of OHE in original position
Each Erection/Labour Span 31(h) -Dismantling of an Isolator
4.00 Block 31(i) -Dismantling of Post Insulator
8.00 Block 31(j)(i) -Dismantling of Suspension Insulator
8.00 Block 31(j)(ii) -Dismantling of Cut-in Insulator
8.00 Block 31(k)(i) -Dismantlement of OHE Mast or structure by cutting
110.00 Block 31(k)(ii) -Dismantlement of Upright of TTC/Portal by cutting
6.00 Block 31(l)(i) -Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc
30.00 Block 31(n) -Dismantling of Guy Rod
36.00 Block 31(p)-Dismantling of Drop Arms/Booms/ Temporary Masts
2.00 Block GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY 31(s) -Dismantling of Fabricated Steel or Small Parts Steel (SPS)
8.00 Block 31(t)(i) -Dismantling of a Regulating Equipment (Three-pulley type) with counter weight assembly for Conventional OHE
32.00 Block 31(t)(iii) -Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire
Rate Power Block 31(t)(iv) -Dismantling of all types of Copper Jumpers
Rate Power Block 31(t)(v) -Dismantling of Termination for Conventional type Overhead Equipment
32.00 Block 31(t)(viii) -Transfer of Feeder Wire from one Mast or Support to another Mast or Support
Rate Power Block 31(t)(ix) -Re-adjustment of OHE Spans, including droppers
Each Erection/Labour Span
Rate Power Block Span 31(t)(x) -Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond
Each 36(a)-Unloading of all types of Steel Structures
MT 36(b)-Loading of all types of Steel Structures
MT 37(a)-Unloading of all types of Copper & Aluminium conductors
MT 37(b)-Loading of all types of Copper & Aluminium conductors
MT 38-Transportation of OHE structures / Materials / Equipments
MT-Km 1800.00 40(a)-Supply and Erection of Number Plate (Enamel Type)
Each 40(b)-Supply and Erection of Number Plate (Retro-Reflective Type)
Each GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Each Total 11705838.00
Item Breakup - A2-FOUNDATION ITEMS (incl. Supply & Erection)
cum 2(a)(ii)-Concrete for foundations and plinth in Rocky Soil
cum 2(b)-Concrete for foundations and plinth in other than Hard and Rock Soil
Item Breakup - B1-STEEL SUPPLY
MT 3(bs)-Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts
MT 3(cs)-Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Portals.
Item Breakup - B2- COPPER SUPPLY
Kg 15(as)-Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire
Kg 15(bs)-Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire
Item Breakup - B3- INSULATOR SUPPLY
Set 8(bx)-Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii)
Each 11(bx)-Supply of Post Insulator for Item no. 11(b) GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Each 12(ax)-Supply of Sectioning and 9-ton Insulators for Item no. 12(a)
Set 13(ax)-Supply of Post and Operating Rod Insulators for Item no. 13(a)
Set Total 1476680.00
Item Breakup - C -GENERAL ITEMS
Each Total 42600.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
75-2025-26TractionMasterdocument.pdf
ATTACHMENT
75-2025-26StandardGeneralConditionsofcontract.pdf
ATTACHMENT
75-2025-26ExplanatoryNotes.pdf
ATTACHMENT
GCCCorrectionSlips_.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .