| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹22.1 L (14.5%)Rejected-Finance 379 MOHIT NAGAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.7 Cr+₹22.1 L (14.5%) | L2 | Rejected-Finance Disqualified |
| 3 | L3₹1.8 Cr+₹26.7 L (17.5%)Rejected-Finance 254 DOON VIHAR JAKHAN RAJPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.8 Cr+₹26.7 L (17.5%) | L3 | Rejected-Finance Disqualified |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
31 Dec 2021, 3:00 pmClosed
General Manager Construction Circle (Ganga)
General Manager Construction Circle (Ganga) UKPJN Haridwar
Execution of Sewer Line by open cut method and its appurtenant works Sewer Connection to existing sewerage network including survey and design etc at Saraswati vihar E Block and Ganesh Vihar in Dehradun City
2021_MDPEY_40284_1
Letter No 2560/Lekha-6/30 Dated 14.12.2021
Open Tender
Civil Works
Item Rate
270 days
Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Dehradun Division, UKPJN
₹3 L
Dehradun
10 Jul 2025
17 Dec 2021
1 Jan 2022
24 Dec 2021
31 Dec 2021
25 Dec 2021
23 Dec 2021
Amount
Excavation of earth upto 1.5 mt. depth below G.L. for laying of Sewer, Man-Holes, Gully Pits, Chambers, Sumps etc. in ordinary soil (earth, sand, loam and clay) including extra excavation below inverts trimming & dressing of sides, levelling and back filling of trenches by excavated earth ,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches and cleaning of site properly after complition of the work.(Excavation in soil mixed with moorum, shingle, Kankar.)
Provide & fixing of Open Timbering (covering1/3rd of surface area by planks), in trenches for the following depths below ground level consisting of 40mm thick approved country wood planks for poling board, 125mm × 75mm Indian Salwood walers and 100 mm dia Sal wood ballies for struts at 1.50m interval including removal after laying of sewer(both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.
Depth upto 3 m below G.L
Provide & fixing of Close Timbering in trenches for the following depths below ground level consisting of 40mm thick approved country wood planks for poling board, 125mm × 75mm Indian Salwood walers and 100 mm dia Sal wood ballies for struts at 1.50m interval including removal after laying of sewer(both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.
3 m to 6 m below G.L
Supply & Laying - Jointing of following dia. R.C.C. S&S pipes with rubber gaskets to the site of work, lowering the same into trenches below ground level true to alignment, making the joints with rubber gaskets and with necessary spun yarn soaked in bitumen jointing with 1:2 cement mortar in coarse sand including cost of all jointing materials and testing etc. complete but excluding excavation and backfilling of trenches upto ground level. (Taking 150mm dia RCC pipe for connecting property to the manhole through SCC, assuming three household to be connected with one SCC, total no of HH are 305, average length of pipe is being taken as 5.0 m for one SCC)
R.C.C. S&S Non Pressure Pipe class Conforming To IS : 458-2003 Class Np3
150 mm dia
200 mm dia
1.50 - 3.00 m depth
3.00 - 4.50 m depth
Constructing Brick Masonry Manhole of various dia and depth as per IS :4111 par1( latest amendment) in FPS brick class designation M-100 in Cement Mortar 1:5 (1 cement : 5 coarse sand) including inside and outside 15mm thick plastering in cement mortar 1:3(1 cement : 3 coarse sand) finished with a floating coat of neat cement inside only. The work includes excavation, dewatering, planking, strutting etc. refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 1 coarse sand : 4 stone aggregate 40mm nominal size), preparation of channel up to the height of'the'pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size) including neat cement finished, suitable connection of inlet & outlet pipes, testing (water tightness} of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction of Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover).
900mm internal diameter at bottom,0.90-1.65m depths
1200 mm internal diameter at bottom ,1.65-2.30m depths
1500 mm internal diameter at bottom ,2.30m-4.95 m depths
1500 mm internal diameter at bottom ,Drop main Hole 2.30m-4.95 m depths
Deduction in the depth of the manhole to regulate payments for variation of actual depth of manholes in following sizes.
900mm dia ,0.90-1.65m depths
1200 mm dia ,1.65-2.30m depths
1500 mm dia,2.30m-4.95 mm depths
1500 mm internal diameter at bottom ,Drop main Hole 2.30m-4.95 m depths
Constructing Brick Masonry house sewer connecting chamber of various sizes and depth as per drawing in FPS brick class designation M-100 in.,Cement Mortar 1:5 (1 cement : 5 coarse sand) including inside and outside 15mm thick plastering in cement mortar 1:3 (1 cement : 3 coarse sand)finished with a floating with a neat cement inside only. The work includes excavation, dewatering, planking, strutting etc., refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 4 coarse sand : 8 stone aggregate 40mm nominal size), preparation of channel up to the height of the pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size including neat cement finished, suitable connection of inlet & outlet pipes, testing water tightness of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction old Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover).
0.60 x 0.60 x 1.50 m depth
Deduction in the depth of the house sewer connecting chamber to regulate payments for variation of actual depth of manholes in following sizes.
0.60 x 0.60 x 1.50 m depth
Diversion of existing sewer in near by existing main/trunk line by pumping and laying of temporary sewer line in foul condition and keep the area clean and hygienic including supply of all material,labor T&P from starting to completion of the work at Ganesh vihar.
Cutting road surface for sewer line trenches. Including stacking of serviceable material (i.e. stone ballast that will be reused in the laying of WBM) at site and disposal of unserviceable material to suitable disposal point beyond municipal limit as directed by Engineer in charge
Cutting Bituminous Portion
Water bound macadam
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Road Reinstatement work Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) Width of bedding ( Outer diameter of pipe + 200mm )
Shifting of domestic water supply house connection coming in the alignment of sewer line/manhole chamber including excavation, refilling, supply of all material, pipes, specials etc., labour, T&P and making good complete as per entire satisfaction of engineer in charge.
15 to 20mm G.I, Pipe
25 to 32mm G.I. Pipe
Upto 65 mm PVC Pipe
75mm to 110mm PVC Pipe
Provision for crossing sewers through existing drains coming across the alignment of sewer including making it good after laying the pipe.
Provision for barricading in two rows and necessary diversion of paths and where as necessary with the help of ballies, ropes, flags, signals and light signals etc. as per requirement including supply of all material T&P etc. complete.
Providing and spreading RBM i.e., River Bed Material (treated as granular sub-base /base/surface course material) in uniform layers with motor grader on prepared surface with rotator and compacting with smooth wheeled roller to achieve the desired density.
Disposal of surplus earth from the site of work upto a distance of 8.0 km. As directed by Engineer incharge including loading unloading and carting etc. all complete.
Construction and laying, jointing and fixing of domestic house sewer Connection in 110 mm dia PVC pipe including excavation of earth,filling,cutting of pipe, fixing Joints including supply of all materials, labour T&P etc. removal of surplus earth or other dismantled material up to a distance of 50 meters from the centre of trenches and cleaning of site properly after completion of the work.
R.R.Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. In cement mortar (1:5) Including Supply of all material, Labour, T&P etc. with proper completion of work.
Ms Ankita Construction
M.R.ENGINEERS AND CONTRACTORS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .