| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.6 CrAccepted-AOC NOT SPECIFIED | ₹32.6 Cr | 1 | Accepted-AOC Lowest |
| 2 | 2₹35.5 CrRejected-AOC | ₹35.5 Cr | 2 | Rejected-AOC 2nd lowest. |
Tender Value
₹27.7 Cr
EMD Value
₹5 L
Closing Date
8 Sept 2020, 4:00 pmClosed
Superintending Engineer, Irrigation Central Circle
O/o The Superintending Engineer, Irrigation Central Circle, Chembukavu, Thrissur - 680 020.
Rectification works of RCB.
2020_Irrig_376169_1
PQ No. 02/SEICC/2020-21/NS
Open Tender
Civil Works - Bridges
540 days
Chamravattom
Contractor should complete similar nature of work costing equal or more than 50 percentage of estimated cost of the work within last five years.
8 documents required · 8 mandatory
₹16,500
Yes
online
₹5 L
Yes
Thrissur
4 Mar 2021
11 Aug 2020
16 Sept 2020
11 Aug 2020
8 Sept 2020
24 Aug 2020
11 Aug 2020 - 8 Sept 2020
24 Aug 2020
Amount
Dismantling solid apron and blocks of size 4.5x4.5
Concrete cutting of M15 and above to a depth of 300mm in a line using cutting tool for separating the concrete portion to be demolished by pneumatic tools to achieve vibration free demolishing of concrete, including all men and machinery as per the direction of engineer in charge at site and then dismantling of concrete portion, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leads, Cement Concrete Grade M-15 & M-20, by Mechanical Means including cost and conveyance of all materials, labour charges, hire charges, all other incidental charges etc. complete as per the direction of departmental officers at site.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leads, Cement Concrete Grade M-15 & M-20, By Mechanical Means including cost and conveyance of all materials, labour charges, hire charges, all other incidental charges etc. complete as per the direction of departmental officers at site.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leads Prestressed / reinforced cement concrete grade M-20 & above - by Mechanical Means including cost and conveyance of all materials, labour charges, hire charges, all other incidental charges etc. complete as per the direction of departmental officers at site.
Relocating blocks for clearing the pathway for vehicle movements and laying filter media later
Shifting concrete block of size 1.5x1.5x0.9m of approx. 5T, after fixing steel rods of 16mm dia with a hook at the end to lift the block, 2per block not less than 1.1m each rod by drilling holes in the block and using epoxy for fixing the rod, lifting and relocating by crane at site itself including all man, machineries and material including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, all other incidental charges etc. complete as per the direction of departmental officers at site.
Shifting concrete blocks (for placing back later in required level and position) of size 1.5x1.5x0.9m of approx. 5T, by chaining, lifting and relocating by crane or by any other suitable method without damaging the blocks at site itself including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, all other incidental charges etc. complete as per the direction of departmental officers at site.
Ring bund
RING BUND Type II Putting up ring bund with earth filled gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, all other incidental charges etc. complete as per the direction of departmental officers at site.
Bailing out water
Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, all other incidental charges etc. complete as per the direction of departmental officers at site.
BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 30HP - Bailing out water with engine and pump set above 10HP and up to 30HP, including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, all other incidental charges etc. complete as per the direction of departmental officers at site.
Removing damaged steel sheet piles
Removing Z steel sheet piles of size 400 x 185 x 7.5/8.5mm driven down vertically in lines and interlocked with adjacent piles with suitable pile removing unit and all accessories including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, all other incidental charges etc. complete as per the direction of departmental officers at site.
Steel sheet piling
Providing Z steel sheet piles of Size 400 x 185 x 7.5/8.5 mm. Hot rolled steel sheet piling sections conforming to IS 2314-1986 or Hot rolled equivalent Z steel sheet piles having equal or more values of section modulus, minimum yield stress of 350 MPa and minimum thickness of 8.5mm driving down vertically in lines and levels, interlocking with LARSSEN type interlock with adjacent piles, with vibratory pile driving unit conforming to IS 11150-1993 and all accessories including all labour, hire charges, all leads and lifts, all other incidental charges etc. complete as per the directions and witnessed and convinced by Asst. Engineer and Asst. Executive Engineer in charge of work which shall be video graphed and recorded for reference.
Site levelling with sand
Site levelling with sand at site including conveyance with lead distance of 3 km and all lifts, levelling the site after compacting with suitable tools to achieve the required compaction possible, all including compacting, cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Cleaning and applying epoxy on old concrete surface
Epoxy bonding of new concrete, with epoxy resins to old concrete - hardener mix including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Fixing dowel bars
Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a depth of 300mm in slabs to introduce steel bars 20mm dia including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement and including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Relaying solid apron and extending downstream
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 including mixing, laying, vibrating, compacting, watering, curing, cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, and all other incidental charges etc. complete as per the direction of departmental officers at site.
Earth work
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including earth work in river bed for diversion for river in Ordinary Soil by Mechanical Means - including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Relaying filter media
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Placing back blocks
Shifting back the blocks size 1.5x1.5x0.9 approx 5T without steel rods fixed for lifting, by chaining using suitable crane or any other suitable method without damaging the blocks and placing at required position and level including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Placing back already relocated block of 1.5 x 1.5 x 0.9m approx 5T, with suitable hooking mechanism using already fixed steel bars in the block,lifting from relocated place and placing in required position and level, including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
New blocks for U/s & D/s
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 including mixing, laying, vibrating, compacting, watering, curing, cost and conveyance of all materials, labour charges, hire charges, all leads and lifts, and all other incidental charges etc. complete as per the direction of departmental officers at site.
Reconstruction of protection walls
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump including mixing, laying, vibrating, compacting, watering, curing, cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Reinforcement
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete Thermo - Mechanically Treated bars of grade Fe-500D or more including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Appendix A - Mechanical works related to weir demolishing and relaying
Removing/relaying of steel embedded parts in a weir excluding the cost of steel embedded parts and including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Appendix B - Hiring and operational charges of sand pumping unit for filling the voids below the solid apron
Filling the voids below the solid apron by using sand pumps or any other suitable method with repeating the procedure at same location multiple times at suitable intervals to achieve maximum density possible to fill the voids with solid particles and as per the direction of department officers with a flow rate of 500m3 slurry per hour with a solid output of not less than 75 m3/hour at location already pointed out by the departmental officers with a lead up to a radial distance of 500m including making necessary arrangement such preparing draining channels or pipe for draining the water in the slurry filled below the apron for achieving maximum density of solid particles in the voids, including the cost of pumping if required for draining the water including hire charges of sand pump, all tools and plants and accesories, fuel charges, idling and mobilisation charges, preparing sand slurry suitable for pumping, providing and shifting the pipe lines including all labour charges, incidental charges and service tax including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Appendix C - Filling gaps of 75mm between the block apron of size 1.5x1.5x0.9m with suitable aggregates
Filling gaps of 75mm between the block apron of size 1.5x1.5x0.9m with 63mm stone aggregates all including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Appendix D - Cathodic protection
Supplying sacrificial anode such as aluminium alloy anodes for cathodic protection with suitable fixing arrangements for attaching to the steel sheet piles including cost and conveyance of all materials, labour charges, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
Fixing Cathodic protection elements such as aluminium alloy anodes with suitable fixing arrangements, on the steel sheet piles at height 1 m from the top and to be driven at a particular interval including cost and conveyance of all materials, labour charges, fixing charges, materials, hire charges, all leads and lifts and all other incidental charges etc. complete as per the direction of departmental officers at site.
PAULOSE GEORGE CONSTRUCTION COMPANY PVT LTD
Bidder Name
PAULOSE GEORGE CONSTRUCTION COMPANY PVT LTD
MARYMATHA INFRASTRUCTURE PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid