Loading…
Loading…
Tender Value
₹100.0 L
EMD Value
₹99,970
Closing Date
8 Jun 2026, 6:00 pm3d left
Assistant Manager (North West Zone)
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Bodakdev area in 132 feet ring road to s.g. highway road area in bodakdev ward NWZ.(ARC)
308826
Tender no-71 tender notice no- 01/2026-27
Open
Civil Works
Ahmedabad
5 documents required · 5 mandatory
₹2,400
Municipal commissioner, Ahmedabad
₹99,970
27 May 2026
27 May 2026
27 May 2026
8 Jun 2026
27 May 2026
Name of work :- CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff
roads in Bodakdev area in 132 feet ring road to s.g. highway road area in bodakdev ward
Item Item / Description Qty Rate Unit
1 Temporary / Permanent Plugging for blocking of sewer
line, branch connections and diversion of flows and
removal of all plugs by any means etc. comp. as
directed by Engineer In Charge of the work.
(J) 1800 mm dia to 2200mm Dia 2.00 7500.00 No.
(K) RCC Duct of any size 7.00 8000.00 No.
2 Provide everything else required for diversion of flow by
pumping and / or bypassing and to maintain the
sewerage system functioning normal and managing the
flow without any sur-charging, overflows etc during the
De-silting/ rehabilitation works of the sewer line to the
satisfaction of the Engineer in charge of the work.
(J) 1800 mm dia to 2200mm Dia 10.00 1100.00 RMT
(K) RCC Duct of any size 50.00 1200.00 RMT
3 Loosen, de-silt and thoroughly clean and remove debris
and objects such as boulders, bricks etc, bacteriological
slimes, roots, encrustations, grease, carbonated
deposits, etc from the sewer line including disposal of
silt / debris / malba / objects etc, including solidification
of silt/malba/debris for disposal to the dumping sites as
per the direction of the Engineer - in - charge.
(i) ( For Above 80% silted line) 100 % AS / TENDER 556.90 1230.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 119.34 984.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 119.34 615.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER 483.00 1815.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 103.50 1452.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 103.50 907.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER 273.00 2460.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 58.50 1968.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 58.50 1230.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER 35.00 3280.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 7.50 2624.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 7.50 1640.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER 266.00 3700.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 57.00 2960.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 57.00 1850.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER 24.50 4450.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 5.25 3560.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 5.25 2225.00 RMT
(G) 1200 mm dia
(i) ( For Above 80% silted line) 100 % AS / TENDER 175.00 5040.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 37.50 4032.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 37.50 2520.00 RMT
(H) 1400 mm dia
(i) ( For Above 80% silted line) 100 % AS / TENDER 7.00 5880.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 1.50 4704.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 1.50 2940.00 RMT
(I) 1600 mm dia
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 35.00 6720.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 7.50 5376.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % AS/ 7.50 3360.00 RMT
(J) 1800 mm dia to 2200mm Dia
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 7.00 7560.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 1.50 6048.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 1.50 3780.00 RMT
(K) RCC Duct of any size
(i) ( For Above 80% silted line) 100 % AS / TENDER 35.00 8000.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 7.50 6400.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 7.50 4000.00 RMT
4 Post-desilting colour CCTV/ Photographic survey
including pan and Zoom inspection of laterals and
defects and submission of video tapes or CD inclusive
of colour photographs to the Engineer in total 2 Sets.
(D) 800mm dia 50.00 250.00 RMT
(J) 1800 mm dia to 2200mm Dia 10.00 250.00 RMT
(K) RCC Duct of any size 50.00 250.00 RMT
5 Pre CCTV video survey/Photographic survey of the 2710.57 250.00 RMT
rehabilitated sewers of all sizes and submit
video/photographic records in CD and still photographs
taken at 10m interval in 2 Sets.
6 Cutting of bituminous road of DBM and Asphalt 608.50 75.00 SMT
concrete of any thickness.
7 Brick work using common burnt clay building bricks 20.00 2872.00 CMT
having crushing strength not less than 35kg./Sq.Cm. in
foundation and plinth in Cement Mortar 1:5.(1-Cement:5-
finesand) (B) Conventional (upto 10 ton)including
racking out joints, curing scaffolding etc complete as
directed by any height.(Bldg SOR 2015-16 Rate)
8 Finding & Raising buried manhole underneath road 50.00 2500.00 No.
using Brick massonery with Brick Strenghth 35kg /
quare cm and cement morter 1:4 and CC work up to
new road level as per instruction of engineer in charge
9 Providing and fixing F.R.C. Extra Heavy Duty (EHD- 12.00 1540.00 No.
35) Manhole Covers & Frames Cover : 728mm ø &
100 mm thick circular cover,35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round bar for
lifting the cover & should be fitted with plastic cups.
Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame 25 x
3 mm wide MS flat should be well embed in concrete to
protect the edges of frame. FRC E.H.D.-35 manhole
cover & frame incl. carting to the work site
etc.comp.(Based on rate of central store)
10 Providing TMT Bar FE 415 reinforcement for 425.00 44.40 Kg.
R.C.C.work including bending, binding and placing
inposition complete up to floor two level (upto 10 ton)
including cost of steel and binding wire for reservoirs /
structures only including lift up to 6 meter height or
depth below G.L.for all diameter.(Bldg SOR 2015-16
11 Survey to determine sewer alignment, levels, M/H 2710.57 7.50 Rmt
positions, proximity of structures, measurement of exact
length between manholes and providing two sets of
autocad drawing as per instruction of Engg.
incharge.(App.C.C.T.V. Disilting Tender Rate)