Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.1 LAccepted-AOC | ₹17.1 L | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹29.3 LRejected-AOC 174A ADARSH NAGAR PHAGWARA | PHAGWARA | PUNJAB | ₹29.3 L | 2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | C.J. BUILDERS L1 | R R Concrette products L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect | 1 | Cum | 115 ₹115 | 130 ₹130 |
| 2.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 210 ₹210 | 230 ₹230 |
| 3.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 1 | Cum | 7,400 ₹7,400 | 7,800 ₹7,800 |
| 4.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 202 ₹202 | 250 ₹250 |
| 5.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 175 ₹175 | 230 ₹230 |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | Cum | 11,250 ₹11,250 | 13,000 ₹13,000 |
| 7.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 6,095 ₹6,095 | 7,500 ₹7,500 |
| 8.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 4,500 ₹4,500 | 5,500 ₹5,500 |
| 9.00 | Lowering, jointing and cutting of UPVC pipe laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. (a) 315 mm dia | 1 | Metre | 105 ₹105 | 135 ₹135 |
| 10.00 | (b) 280 mm dia | 1 | Metre | 95 ₹95 | 115 ₹115 |
Tender Value
₹27.4 L
EMD Value
₹54,860
Closing Date
14 Oct 2025, 3:00 pmClosed
Executive Engineer, BML Division, Patiala
XEN, BML Division, Jail Road, Patiala
Laying of UPVC underground pipeline for outlet RD 4500/L of Payal Minor excluding supply of pipe.
2025_WR_150995_8
38/25-26
Open Tender
Civil Works - Canal
75 days
Ludhiana
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹54,860
10 Jan 2026
27 Sept 2025
15 Oct 2025
27 Sept 2025
14 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid