Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance 06 07 2023 3 CORRIGENDUM AMENDMENT NO 01 DATED 04 07 2023 4 CORRIGENDUM AMENDMENT NO 02 DATED 07 08 2023 SE FINANCIAL BID OPENED ON 07 08 2023 SIR WE ARE PLEASED TO INFORM YOU THAT YOUR OFFER FOR THE WORK IN SUBJECT MATTER HAS BEEN ACCEPTED AS PER TERMS CONDITIONS OF THE TENDER DOCUMENTS REFERRED ABOVE THE BROAD TERMS AND CONDITIONS ARE AS DETAIIEC BELOW CONSULTANCY FEE 0 54 ZERO POINT FIVE FOUR PERCENT OF PROJECT COST INCLUSIVE OF ALL TAXES PROJECT COST SHALL BE LOWEST OF THE FOLLOWING 4 THE ACTUAL COST OF THE PROJECT ON COMPLETION OR 2 DPR PRELIMINARY COST APPROVED BY NBCC CLIENT OR 3 ESTIMATED COST OF THE PROJECT PUT TO TENDER II COMPLETION PERIOD 18 MONTHS III DEFECT LIABILITY PERIOD 12 MONTHS IV PERFORMANCE 2 OF THE VALUE OF TOTAL CONSULTANCY FEES OF CONSULTANT TO GUARANTEE BE SUBMITTED IN THE FORM OF BG WITHIN 45 DAYS FROM THE | ₹6.0 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹7.6 L+₹1.7 L (27.9%)Accepted-Finance B 6 ISHAAN IMPERIAL COURT BARAMPUR HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | ₹7.6 L+₹1.7 L (27.9%) | L2 | Accepted-Finance Accepted |
Tender Value
₹9.3 L
EMD Value
₹18,623
Closing Date
12 May 2026, 3:00 pmClosed
Sh. S.D Sharma, E.E CD-05, DSIIDC
Plot No.74-A, 2nd Floor, Room No.205, Ring Road, Lajpat Nagar-III, New Delhi-110024
Hiring of Consultancy for Preparation of Detailed Design, Estimates Interior and Exterior renovation and upgradation of Revenue Department (HQ) Office Complex, 5, Shamnath Marg, New Delhi-110054
2026_DSIDC_290920_1
E-NIQ No.01/2026-27/CD-05
Open Tender
Miscellaneous Services
Percentage
20 days
Revenue Department(HQ) Office Complex, 5, Shamnath
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹18,623
22 May 2026
6 May 2026
12 May 2026
6 May 2026
12 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | "Consultancy work i.e. interior & Exterior renovation of existing four nos. block having total covered area 4311 Sqm i.e. Auditorium/Conference Hall, Divisional Commissioner Office, DM Office & other officers room including renovation of heritage building upgradation of peripheral boundary wall and entry gate of the complex including all other works required by the Revenue Office time to time as per direction of Engineer-In-Charge. Site Assessment & Documentation
• Visit the existing office premises
• Measure and document current conditions
• Review existing drawings (if available)
• Identify structural elements, services, and constraints
• Prepare as-built drawings (plans, sections, elevations)
• Understand & plant the Existing Heritage Building /Boundary Wall/Landscape Areas on plan."
"Client Requirement & Space Planning
• Understand client needs, workflow, and branding requirements
• Prepare space utilization analysis
• Develop concept layouts and zoning options
• Finalize furniture layout and circulation planning
• Understand enhancement works required for boundary wall & Heritage Building"
"Concept Design
• Develop interior design concept (theme, materials, colors)
• Mood boards and reference images
• Preliminary 2D layouts and basic 3D views (if required)
• 3D renderings and walkthroughs
• Client presentations and feedback incorporation"
"Design Development
• Finalize detailed layouts
• Selection of materials, finishes, and color schemes
• Furniture design and specifications
• Coordination with MEP (Mechanical, Electrical, Plumbing) requirements
• Lighting design and fixture selection
• External Electrification Work i.e. Street lights, Peripheral lights, Feeder Pillars etc.
• Internal Electrification i.e. Internal Wiring, Distribution Board, Selection of Fittings & Fixtures etc.
• LAN Work, CCTV Cameras work, Fire Fighting / Fire Alarm System, Air-conditioning System.
• Provision of Emergency Lighting."
"Working Drawings & Documentation
• Detailed drawings for execution, including:
• Furniture layouts
• Partition details
• Ceiling plans
• Flooring layouts
• Electrical & lighting layouts
• HVAC coordination drawings
• Joinery details
• Preparation of specifications and BOQ (Bill of Quantities)"
"Approvals & Coordination
• Coordinate with consultants (MEP, structural, IT, etc.)
• Ensure compliance with local building codes and regulations"
"Tendering & Contractor Selection
• Prepare detailed estimate, BOQ for Interior & MEP Services etc.
• Prepare Priced BOQs.
• Obtain Approval on costing from Clients
• Prepare tender documents & drgs.
• Recommend suitable contractors/vendors"
"Site Supervision & Execution Support
• Periodic site visits to monitor progress
• Ensure work is as per drawings and specifications
• Review material samples and mock-ups
• Resolve site issues and provide clarifications"
"Quality Control & Finishing
• Check workmanship and finishes
• Ensure adherence to design intent
• Snag list preparation" | 1 | L.S | 9,31,134 | ₹9,31,134 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
eniq01cd05.pdf
Tender Documents • 0.07 MB
BOQ_386036.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .