Loading…
Loading…
Tender Value
₹95.9 L
EMD Value
₹96,000
Closing Date
21 Aug 2026, 6:00 pmClosed
Executive Engineer Sipu Project Division, Palanpur
Construction of Necessary Approach Road for Access to Hadamatiya Minor Irrigation Scheme & Reservoir Capacity Enhancement of Hadamatiya M.I. Scheme At.- Deri Ta.-Dantiwada, Dist.-B.K
332261
Notice No.9 of 2026-27
Open
Civil Works - Roads
Works
Banaskantha
7 documents required · 7 mandatory
₹2,400
Executive Engineer Sipu Project Division Palanpur
₹96,000
6 Aug 2026
6 Aug 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
BILL OF QUANTITIES
Name of Work :- Construction of Necessary Approach Road for Access to
Hadamatiya Minor Irrigation Scheme & Reservoir Capacity
Enhancement of Hadamatiya M.I. Scheme At.- Deri Ta.-Dantiwada,
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
1 Jungle clearance of specified category and
bushes for canal/dam work as directed with
disposing materials etc.complete.(Excluding
tree of girth above 0.5 Mt.)(b)Medium Dence
2 Excavation For Depening of pond/
Checkdam including transporting and
spreading the excavated material for raising
of embankment in uniform layer or as 64800.00 Cu.M. 71.000
directed including dressing breaking clods
etc for Lead up to 1 km and all lift without
rolling and watering etc. complete.
3 Box cutting the road surface to proper slope
and camber for making a base of road work
including removing the excavated stuff and 1005.00 Cu.M. 109.080
depositing on the road side slops as directed
upto 50 mts. Lead.
4 Earthwork for embankment including
breaking clods, dressing with all lead and lift
(excluding watering and consolidation)(D)
From Borrow area within 2.0 Km. lead
5 Rolling of Earth work in layers with
vibratory roller including filling in
depressions which occur during the process 363.00 Cu.M. 22.960
and Watering of earth work as directed.
6 Providing laying spreading and compacting
150 mm thick granular sub base (G.S.B.) with
specified material MC BT Metal of size 53 to
26.5mm 35%, 26.5mm to 4.75mm 45% and
below 2.36mm stone dust 20% mix (Grade-
I) having C.B.R. not less than 30 incl. mixing
the material at OMC at site and spreading in
uniform layer base and compacting with
power roller to achieve the desired density
incl. all materials, labour and machinery,
lighting guarding, bracketing and
maintenance of diversion etc. complete as
per MORT&H clause 401.12.50
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
7 Provdining and laying W.B.M of B.T.M.C
metal of size 45 mm to 63 mm sizeincluding
0.12 Cu.M. Stone Screeing & 0.08 Cu.M. stone
dust as filler including spreading, watering & 335.00 Cu.M. 2133.800
consolidation by vibratory roller 80KN to
100KN static weight. 75 mm thick
compected each of two layer.
8 Providing and laying, spreading and
compacting 150 mm thick graded stone
aggregate to Wet Mix Macadam (W.M.M.)
specification including premixing the
material with water at OMC in mechanical
mix plant carriage of mixed material by 335.00 Cu.M. 1938.070
tipper to site, laying in uniform layers with
mechanical means Paver Finisher in sub-
base /base course on well prepared surface
and compacting with vibratory roller to
achieve the desired density.
9 Providing & applying evenly priming coat
with bitumen Emulsion (SS1) on prepared
surface of granular base including cleaning
of road surface and sparying primer at the
rate of 7.50 Kg. / 10 Smt using using
mechanical means.
10 Providing and laying 37.50 mm thick B.M.
using M.C stone B.T. stone. as per M.O.R.T. &
H. specification & bitumen grade VG 30 for
mixing at the rate of 34 Kg./M.T. i.e. 3.40% of
total weight of mix including heating the
aggregate and asphalt in continuous
batching drum mix plant and spreading the
same by paver finisher and consolidation
with vibratory roller including paving all
materials equipments, tools & plants, fire
wood, oil, kerosene, labour charges etc
complete using contractor's own machinery
drum mix plant & paver finisher etc.
11 Providing and laying 50.00 mm thick B.M.
using M.C stone B.T. stone. as per M.O.R.T. &
H. specification & asphalt for tack coat at the
rate of 2.5 Kg./10 Sqm. with mechanical
sprayer & bitumen grade VG 30 for mixing at
the rate of 34 Kg./M.T. i.e. 3.40% of total
weight of mix including heating the
aggregate and asphalt in continuous
batching drum mix plant and preading the
same by paver finisher and consolidation
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
with vibratory roller including paving all
materials equipments, tools & plants, fire
wood, oil, kerosene, labour charges etc
complete using contractor's own machinery
drum mix plant & paver finisher etc.
12 Providing and laying 20 mm thick M.S.S.
using B.T. aggregates (As per MORTH & H
gradation) and asphalt grade VG-30 at the
rate of 5.10% of mix i.e. 51.00 Kg./MT
including heating the asphalt and aggregate
by continuous batching drum mix plant,
transporting the mixed material by tipper
trucks and spreading the same by aver
finisher and consolidation by vibratory
roller of 80 to 100 KN static weight including
providing equipment, tools and plant,
firewood lubricants, kerosene, oil, labour
charges using contractor's own machineries
drum mix palnt and paver finisher.
13 Providing and laying asphalt painting on BT
surface with bitumen grade VG-30 at the
rate of 5 Kg /10 Sqm. By mechanical sprayer
and spreading the stone dust on prepared 2232.00 Sq.Mtr. 49.140
surface at the rate of 0.03 Cum. / 10 Sqm.
etc. complete and rolling with PTR and roller
brushing etc. complete.
Rupees Ninety Five Lakh Eighty Eight Thousand Three Hundred Sixty Three Paise Fifty Five Only
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Sipu Proj. H.W. Sub Dn. No.1 Sipu Project Division Sipu Project Division
Dantiwada Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Notice No.9.pdf
SBD Hadmatiya Desilting and Road.pdf
SCH-B Hadmatiya Desilting and Road.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .