| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹21.0 L+₹1.8 L (9.61%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹43,700
Closing Date
10 Mar 2021, 5:00 pmClosed
Harikrishnan K.P
Executive Engineer, Irrigation-Mechanical Division, Malampuzha
Fabrication, Painting and Erection of 6 Nos shutters of size 2.00 x 2.00 m H in Muringedathupara check dam at Manjapra Gramapanchayath
2021_Irrig_411273_1
17/EE/MECH/MPZA/2020-21
Open Tender
Repair and Maintenance Works
Item Rate
365 days
Muringedathu Para, Ernakulam (Dist.)
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,785
Yes
₹43,700
Yes
17 Jun 2021
4 Feb 2021
16 Mar 2021
4 Feb 2021
10 Mar 2021
4 Feb 2021
4 Feb 2021 - 10 Mar 2021
Amount
Cost of supply and stacking material for embedded parts
85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
85.107 : Supply of MS round bar including cost of conveyance charges
Providing ring Bund
od20885/2018_2019/MH : :RING BUND - Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 1.0m height 1.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete
Fabrication of embedded parts
od21219/2018_2019/MH : Fabrication erection and commissioning of structural steel Embedded parts as per approved specifications and direction of deptl officers at site,including cost of labour, machinery, all leads and lifts,incidental and handling charges etc.complete.But excluding cost of material already supplied
Centering and shuttering including strutting,propping etc.and removal of form work for concreting the side of pier
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
4.2.3 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Cost of supply and stacking material for shutters
85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
Fabrication and supply of structural steel shutters
od21222/2018_2019/MH : Fabrication and supply of structural steel canal shutters and accessories as per approved specifications and direction of deptl officers at site,including cost of labour, machinery, all leads and lifts, incidental and handling charges etc. complete. But excluding cost of material already supplied.
Supplying and fixing of rubber seal
85.116 : Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing
85.118 : Supplying and fixing in correct position with specified initial interface L-type / bulb nose rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings
Cost of supply and stacking material for fabricating hoisting bridge
85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
85.103 : Supply of MS checquered plates including cost of conveyance charges
85.107 : Supply of MS round bar including cost of conveyance charges
od21416/2018_2019/MH : Supply of NB 32mm GI pipe
Fabrication supply of hoisting bridge
od21417/2018_2019/MH : Fabrication and supply of Hoisting girder structural steel conforming to IS 2062 Gr as per approved specifications and direction of deptl officers at site,including cost of labour, machinery, all leads and lifts, incidental and handling charges etc.complete. But excluding cost of material already supplied.
Supply and fixing screw hoist with 63 mm screw rod
od21420/2018_2019/MH : Supply of screw shaft 63 mm outer dia, head pitch 12.7 mm root dia 50.3 mm using EN 8 shaft including cost of all material, labour, tools etc complete.
Supply and fixing of 4 tonne screw hoist
od63872/2019_2020/MH : :Supply and fixing of 4 tonne capacity screw hoist having 1 numbers of forged steel / EN -8 shaft, suitable worm gear units having a lifting speed of around 5.00 cm/min for 24 rpm of hand operation including cost of all materials, labour, hire charges and conveyance.
Painting the shutter and hoist platform
85.114 : Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
85.115 : Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
Erection of shutter and hoist platform
od21582/2018_2019/MH : :Erection of the canal shutters safely in the grooves,assembling and aligning including cost of all machinery, labour all incidental and conveyance charges etc. complete as per direction of departmental officers at site.
od21583/2018_2019/MH : Erection of the hoisting girder etc. In correct alignment and anchoring it complete including trial run of the mechanism cost of all machinery, labour all incidental and conveyance charges etc.complete as per direction of departmental officers at site.But excluding the cost material already supplied.
K G SURENDRAN
Bidder Name
Krishna Engineering Works
K G SURENDRAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_584413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .