Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.4 LAccepted-AOC | ₹48.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.9 LRejected-Finance | ₹49.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹50.2 LRejected-Finance | ₹50.2 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | shamsu.k.k L2 | shiyas L3 | shamsu nk L1 |
|---|---|---|---|---|---|---|
| 1.00Reactive Maintenance(Initial Rectification Work) | ||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.14 | Hectare | 58,863 ₹7,946.51 | 58,863 ₹7,946.51 | 61,189.04 ₹8,260.52 |
| 1.00 | OD115877/2025-2026:Filling up pot holes with ready mixed bituminous compound(25Kg) and compacting by ramming to get a compact surface including cost of material laying charges, transportation to site etc.complete(Rate is arrived for a bag of 25Kg) | 50 | no | 774 ₹38,700 | 774 ₹38,700 | 805.55 ₹40,277.50 |
| 1.00 | 10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material | 270 | sqm | 480 ₹1.3 L | 480 ₹1.3 L | 499.59 ₹1.3 L |
| 1.00 | OD120377/2025-2026:Removing the old existing Vnyl printed sheeting on the Display board of running contract and
replacing with newly prepared Vinyl sticker .including lettering, symbols and transportation to
the site etc.as per approved drawing and directions of the departmental officer at site. | 14.4 | sqm | 1,056 ₹15,206.40 | 1,056 ₹15,206.40 | 1,098.66 ₹15,820.70 |
| 2.00Premonsoon Nature work | ||||||
| 2.00 | OD115875/2025-2026:Engaging Man Mazdoor for various activities such as diverting flood water, clearing road berm, filling up pot holes using Bitumen ready mix etc | 30 | Day | 1,127 ₹33,810 | 1,127 ₹33,810 | 1,171.89 ₹35,156.70 |
| 2.00 | OD120628/2025-2026:Engaging Scavenger for clearing accumulated silt, shoulder clearing, etc. | 25 | Day | 1,247 ₹31,175 | 1,247 ₹31,175 | 1,297.25 ₹32,431.25 |
| 2.00 | OD115874/2025-2026:Engaging Skilled Wood Cutter for cutting and removing trees and Branches | 20 | Day | 1,309 ₹26,180 | 1,309 ₹26,180 | 1,360.85 ₹27,217 |
| 2.00 | OD120631/2025-2026:Skilled labour for assisting Wood cutter | 30 | Day | 1,127 ₹33,810 | 1,127 ₹33,810 | 1,171.89 ₹35,156.70 |
Tender Value
₹46.6 L
EMD Value
₹50,000
Closing Date
4 Oct 2025, 2:00 pmClosed
Executive Engineer, PWD Roads division
Office of the Executive Engineer, PWD Roads division, Kakkanad, Trikkakara. P.O
GENERAL RM 2025 26 RC 2 Phase 1 C l u s t e r 2 O n e Y e a r R u n n i n g Contract Ernakulam Sn Zone I for various PWD Roads under Road section Ernakulam in Ernakulam District 10 road stretches for a length of 2279m Km General Civil Work
2025_PWD_802709_1
PWD/RB/TR/14900/2025_5_1_1/1
Open Tender
Civil Works - Roads
365 days
Kakkanadu
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
14 Jan 2026
27 Sept 2025
6 Oct 2025
27 Sept 2025
4 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid