Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 CrAccepted-Finance | ₹6.3 Cr | 1 | Accepted-Finance ACCEPTED |
| 2 | 2₹6.8 Cr+₹59.5 L (9.50%)Accepted-Finance | ₹6.8 Cr+₹59.5 L (9.50%) | 2 | Accepted-Finance ACCEPTED |
| 3 | 3₹7.0 Cr+₹74.1 L (11.8%)Accepted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | ₹7.0 Cr+₹74.1 L (11.8%) | 3 | Accepted-Finance ACCEPTED |
| 4 | 4₹8.9 Cr+₹2.7 Cr (42.4%)Accepted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | ₹8.9 Cr+₹2.7 Cr (42.4%) | 4 | Accepted-Finance ACCEPTED |
| 5 | 5₹9.2 Cr+₹3.0 Cr (47.5%)Accepted-Finance | ₹9.2 Cr+₹3.0 Cr (47.5%) | 5 | Accepted-Finance ACCEPTED |
Tender Value
₹295.6 Cr
Closing Date
14 Feb 2022, 11:00 amClosed
CHIEF ENGINEER PROJECT SAMPARK BRO
Headquarters Chief Engineer Project Sampark BRO
AE FOR SUPERVISION REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 134.950 TO KM 166.100 DESIGN CHAINAGE KM 116.980 TO KM 146.700 PKGVI AP RD NH144A ON EPC MODE IN THE UT OF J ANDK PROJECT SAMPARK BR
2021_BRO_652814_1
SPK/AE/AP Rd/PKG-VI/02/2021-22
Open Tender
Consultancy
EPC Contract
730 days
JAMMU
Please refer tender document
2 documents required · 2 mandatory
₹5,000
Yes
FCI Aravali Gypsum and Minerals India Limited
Exempted
HQ CE (P) SAMPARK
5 Sept 2022
25 Oct 2021
15 Feb 2022
26 Oct 2021
14 Feb 2022
13 Nov 2021
26 Oct 2021 - 13 Nov 2021
13 Nov 2021
Amount
Remuneration for Local Staff
Team Leader Cum Senior Highway Engineer (Construction Period-24 Months+ Maintenance period -15 Months)
Resident Engineer cum Highway Engineer (Construction Period -24 Months + Maintenance period for Rd-60 Months DLP of RD)
Bridge / Structural Engineer (Construction Period -24 Months + Maintenance period for Rd-10 Months DLP of RD)
Senior Pavement Specialist (Construction Period -24 Months)
Senior Quality cum Material Expert (Construction Period (24 Months))
Road safety Expert (Construction Period -8 Months + Maintenance period for Rd-10 Months DLP of RD)
Sub-Professional Staff
Survey Engineer (Construction Period-24 Months+ Maintenance period-10 Months DLP of RD)
Assistant Highway Engineer (Construction Period-2 x 24 Months+ Maintenance period-1 x 60 Months DLP of RD)
CAD Expert (Construction Period-6 Months+ Maintenance period-4 Months DLP of RD)
Environmental Engineer (Construction Period-6 Months)
Assistant Bridge Engineer (Construction Period-24 Months)
Assistant Quality cum Material Engineer (Construction Period-2 x 24 Months)
Electrical Engineer (Construction Period-6 Months+ Maintenance period-3 Months DLP of RD)
HTMS/Toll Expert (Construction Period-3 Months)
Quantity Surveyor (Construction Period-24 Months+ Maintenance period-8 Months DLP of RD)
Assistant Bridge Engineer (Construction Period-6 Months+ Maintenance period-18 Months DLP of RD)
Support Staff (inclusive of per diem allowance)
Accountant Cum Cashier (Construction Period (24 Months) + Maintenance period (60 Months)
Steno cum Computer operator (Construction Period (2 x 24 Months) + Maintenance period (2 x 60 months))
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (1 no during Construction Period)
Bolero or equivalent 4x4 vehicle(not more than 3 years old) (1 no during Construction Period and during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/HQ ADGBR (Chandigarh)/HQ DGBR (New Delhi)/MoRT&H (New Delhi). The quoted amount against remuneration should include travel fare for total 08 round trip to HQ ADGBR (Chandigarh)/HQ DGBR (New Delhi)/MoRT&H (New Delhi). (including Hotel Charges, travel costs etc. complete) (Average Three trip per Quarter for construction period)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of minimum area of 200 sqm shall be rented during Construction Period
One Office of minimum area 100 sqm shall be rented during Maintenace Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs–Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water Coolers and Software, Plotter, Biometric device etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports (84 months x3 copies)
Half yearly Reports (14 half yr x3 copies)
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (8 for each Pkg)
Pavement strength measurement using FWD (4 for each Pkg)
Bridge inspection using Mobile Bridge Inspection Unit (8 for each Pkg)
Road signs inspection using Retro Reflectometer (8 for each Pkg)
Mobile Bridge Inspection Unit (MBIU) (5x2 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Aushta Consulting Engineers (I) Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
MSV INTERNATIONAL INC
Centro de Estudios de Materiales y Control de Obra, SA.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RODIC CONSULTANTS PVT. LTD.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .