Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical No name of work mentioned in Treasury echallan |
Tender Value
₹14.2 L
Closing Date
6 Aug 2021, 6:00 pmClosed
ER. D.K Kaith
EXECUTIVE ENGINEER PWD(RnB) DIVISION SAMBA
Please refer to BOQ
2021_PWDJK_132447_10
21 of 2021-22 dt 29-07-2021
Open Tender
Civil Works
Item Wise
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD(RnB) DIVISION SAMBA
Exempted
17 Aug 2021
30 Jul 2021
7 Aug 2021
31 Jul 2021
6 Aug 2021
31 Jul 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) in trenches, foundation, drains pipes cable etc. in all classification of soils and disposal of excavated earth and refilling the available excavated earth wherever required incl. levelling, dressing, ramming, watering and rolling etc. as per directions of Engineer-in-charge with all leads / lifts and carriage complete job.
Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level a) 1:5:10 (1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40mm nominal size) with all leads and lifts carriage complete
b) 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed, with all leads and lifts carriage complete
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete
Reinforcement for RCC work including straightening, cutting bending placing in position and binding all complete.
Centring and shuttering including strutting, propping etc. and removal of form work for:- a) Foundations, footings, bases of Columns.
b) Suspended floors, roofs, landings, balconies and access platform.
c) Edges of slabs and breaks in floors and walls Above 20 cm wide
Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete,
Amjed Hussain
Darshan Kumar
Alam Din
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .