| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-Finance VILL AND PO MEHERA PUR PS KALIACHAK DIST MALDA | HOWRAH | WEST BENGAL | 711101 | ₹28.6 L | L1 | Accepted-Finance Accepted-lowest |
| 2 | L2₹28.6 LRejected-Finance 32 DHARSA MULLICKPARA 3RD BYE LANE G I P COLONY DIST HOWRAH PIN 711112 | HOWRAH | HOWRAH | WEST BENGAL | 711112 | ₹28.6 L | L2 | Rejected-Finance Regretted-rate is high |
| 3 | L3₹28.7 LRejected-Finance | ₹28.7 L | L3 | Rejected-Finance Regretted-rate is high |
| 4 | Rejected-Technical AG 112 SALT LAKE CITY SECTOR II UNIT 608 6TH FLOOR KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Rejected-Technical Regretted- MOM of AGM, Application, Affidavit X and Y not submitted. |
| 5 | Rejected-Technical 10 A 1 JAHURA BAZAR LANE KASBA KOLKATA 700042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | - | - | Rejected-Technical Regretted- Credential does not match with this work. |
Tender Value
₹28.6 L
EMD Value
₹57,156
Closing Date
6 Feb 2026, 2:00 pmClosed
EE,BNWD
Room No.124 1ST FLOOR PURTA BHAVAN D.F. BLOCK SECTOR I SALT LAKE KOLKATA 700 091.
Upgradation of floors with vitrified tiles entire Gr Floor and 1st Floor (excluding Toilet block and Seminar Room) at Umeshchandra College, Extended Campus at FC-129,Sector-III, Salt Lake,Kolkata-700 106 during the year 2025-26.
2026_WBPWD_988706_1
WBPWD/EE/BNWD/NIT24e/2025-26
Open Tender
CIVIL WORKS
60 days
Salt Lake
Please refer Tender documents.
4 documents required · 4 mandatory
₹57,156
Yes
28 Mar 2026
15 Jan 2026
9 Feb 2026
15 Jan 2026
6 Feb 2026
20 Jan 2026
Dismantling artificial stone flooring upto 50 mm.thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof
1st floor
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick Ground floor
1st floor
Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof.
1st floor
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. Pakur variety Gr. Floor
1st Floor
Supplying and laying true to line and level Double Charge Vitrified Tiles of approved brand conforming to IS 15622: 2006 (Group B I a) and tested as per IS 13630:2006 (relevant parts) [Non-modular sizes for tiles with Water Absorption (av.) ≤ 0.08 %] in floor, skirting etc. using polymerised adhesive of 6mm thick layer applied directly over finished artificial stone floor/Mosaic etc without any backing course and joints grouted with admixture of white epoxy grout materials of approved brand including spacer -2mm as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials,Iabour and all other incidental charges complete as per direction of Engineerin-Charge. (Note: This work should not be executed without specific permission of Superintending Engineer) (a) ln Ground FIoor:(size not Iess than 600mmX 600 mm X 9.5 mm thick)
1st Floor
Supply of Mazdoor (Male) for shifting of office materials etc. Reqd for vacating office, shifting of office materials and rearrangement as per new layout.
Supplying,fitting & fixing granite slab 15mm to 18mm thick in floor, lobby, stair, landing and treads etc. over 20mm (avg) thick base of cement morter (1:2) laid with white cement slurr@ 4.40Kg per Square meter before placing of granite and jointed with white cement slurry @ 2.0 Kg per square meter with necessary pigments and complete as per direction of Engineer-in-charge including cost of all materials, labourscuring and roughening of concrete surface complete. In ground floor (a) Area of each Granite slab upto 0.60 Square meter.
1st Floor
Supplying, fitting & fixing granite tiles 10mm to 12mm. thick in columns, wall, facia etc. with 15 thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all materials, labours, scaffolding, staging ,curing and roughening of concrete surface complete. [Using cement slurry at back side of tiles@ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m] Area of each slab upto 0.2 Sq.m Ground Floor
1st Floor
Extra cost of labour for prefinished and premoulded Nosing to treads of steps, railing, window sill etc. of Marble Stone.
TOTAL:
ADD : GST - 18% (SGST = 9% & CGST = 9%)
ADD : WEST BENGAL LABOUR WELFARE CESS = 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Form_2911.pdf
Tender Documents • 0.54 MB
BOQ_2415495.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid