Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 LAccepted-Finance | L-1 | Accepted-Finance Lowest-11 | |
| 2 | L-2₹4.2 L+₹14,965 (3.73%)Rejected-Finance GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L-2 | Rejected-Finance Lowest-2 | |
| 3 | L-3₹4.3 L+₹32,120 (8.01%)Rejected-Finance R O VILL CHEOG TEH THEOG DISTT SHIMLA | L-3 | Rejected-Finance Lowest-3 | |
| 4 | L-4₹6.2 L+₹2.2 L (53.9%)Rejected-Finance SHYAM COTTAGE RAM NAGAR SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L-4 | Rejected-Finance Lowest-4 | |
| 5 | L-5₹6.4 L+₹2.4 L (59.4%)Rejected-Finance NOT AVAILABLE | L-5 | Rejected-Finance Lowest-5 |
| Sl No | Description | Qty | Unit | Pitamber Lal L1 | Ramesh kumar L5 | SHUBHAM THAKUR L3 | HEM RAJ L4 | Narender Kumar L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge. | ||||||||
| 2.00LWSS Chatrour Sakroha | ||||||||
| 3.00Centrifugal pump - 1 No. X 30 BHP = 15 BHP | ||||||||
| 4.00 | Deployment of 2 Nos. Pump Attendant for smooth running of the pumps & motors of scheme LWSS Kehar Stoh Ghadrour under JSV Sub Division Baggi No.II complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 730 | Days | 364 ₹2,65,720 Lowest | 590 ₹4,30,700 | 398 ₹2,90,540 | 575 ₹4,19,750 | 385 ₹2,81,050 |
| 5.00 | Deployment of 1 No. Beldar for smooth running of the scheme i.e. distribution of water in public field, watch & ward and miscellaneous work of LWSS Kehar Stoh Ghadrour under JSV Sub Division Baggi No.II complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 365 | Days | 370 ₹1,35,050 | 570 ₹2,08,050 | 390 ₹1,42,350 | 540 ₹1,97,100 | 369 ₹1,34,685 Lowest |
Tender Value
₹6.0 L
EMD Value
₹12,100
Closing Date
17 Dec 2025, 5:00 pmClosed
Executive Engineer
JSD Baggi
Providing Manpower like 2 Nos. Pump Attendant , and 1 No. Beldar for operation, running and maintenance of the complete scheme for One Year
2025_HPIPH_122891_1
22043-22083 dated-08-12-2025
Open Tender
Civil Works
Item Rate
365 days
Baggi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹12,100
5 Mar 2026
8 Dec 2025
18 Dec 2025
9 Dec 2025
17 Dec 2025
9 Dec 2025
9 Dec 2025 - 17 Dec 2025
Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge.
LWSS Chatrour Sakroha
Centrifugal pump - 1 No. X 30 BHP = 15 BHP
Deployment of 2 Nos. Pump Attendant for smooth running of the pumps & motors of scheme LWSS Kehar Stoh Ghadrour under JSV Sub Division Baggi No.II complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
Deployment of 1 No. Beldar for smooth running of the scheme i.e. distribution of water in public field, watch & ward and miscellaneous work of LWSS Kehar Stoh Ghadrour under JSV Sub Division Baggi No.II complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
FORM6.pdf
Tender Documents • 0.42 MB
FORM8.pdf
Tender Documents • 1.05 MB
TC.pdf
Tender Documents • 0.37 MB
BOQ_180434.xls
BOQ • 2.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .