| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,963Accepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹1.1 L+₹11,228.45 (11.2%)Rejected-AOC | L2 | Rejected-AOC Highest rate hence rejected |
Tender Value
₹99,967
EMD Value
₹2,499
Closing Date
24 May 2023, 5:00 pmClosed
Seeja KR
O/o Assistant Executive Engineer Electrical Wing (I) Sub division, Aluva
F u l l y Comprehensive Annual Maintenance of Palathali,Neelimala LI Schemes under Electrical LI section Aluva-
2023_Irrig_554000_25
PWD/BLDG/TR/10885/2022
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer tender documents
11 documents required · 11 mandatory
₹555
₹2,499
19 Jun 2023
18 May 2023
26 May 2023
18 May 2023
24 May 2023
18 May 2023
18 May 2023 - 23 May 2023
Amount
Overhauling
OD97439/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD97823/2022-2023:Dismantling the 30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD115126/2022-2023:Refitting 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD115127/2022-2023:Refitting 30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD97458/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD97459/2022-2023:Supply and Installing 20 W LED Tube light.
OD248137/2022-2023:Replacing the damaged tube fitting and supply conveyance, installation, testing and commissioning the light fittings of following types made from CRCA sheet 0.5mm thickness with all accessories and lamps directly on wall and giving connections as required 1200 mm 1X20W LED Lamp with box type fixture
OD120073/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6310-2Z or its equivalent size
Periodical Maintenance
OD97441/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD97826/2022-2023:Fully Comprehensive Annual Maintenance of 30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Overhauling
OD97451/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD97829/2022-2023:Dismantling the 40 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD115128/2022-2023:Refitting 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD115129/2022-2023:Refitting 40 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD97446/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD120076/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6314-2Z or its equivalent size
OD248142/2022-2023:Replacing the damaged tube fitting and supply conveyance, installation, testing and commissioning the light fittings of following types made from CRCA sheet 0.5mm thickness with all accessories and lamps directly on wall and giving connections as required 1200 mm 1X20W LED Lamp with box type fixture
Periodical Maintenance
OD97440/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD97835/2022-2023: Fully Comprehensive Annual Maintenance of 40 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
PRABHA ELECTRICALS
Bidder Name
PRABHA ELECTRICALS
Sahadevan G
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852072.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .