Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.7 L+₹52,903.31 (6.48%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹9.0 L+₹80,879.04 (9.90%)Rejected-AOC LSGD SECTION THAZHEKODE PERINTHALMANNA MALAPPURAM | MALAPPURAM | KERALA | 670612 | L3 | Rejected-AOC L3 | |
| 4 | L4₹9.2 L+₹1.0 L (12.4%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Bidders registration certificate expired on 31.03.2026 |
| Sl No | Description | Qty | Unit | BASHEER K L3 | Beerankutty L1 | JASIL KOLAKKADAN L2 | Vavoor Labour Contract Co-Operative Society Ltd L4 |
|---|---|---|---|---|---|---|---|
| 1.00Reconstruction of canal slab | |||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 12.6 | cum | 3,109.6 ₹39,174.74 | 2,829.7 ₹35,648.56 Lowest | 3,013 ₹37,957.77 | 3,180 ₹40,061.64 |
| 1.00 | OD26976/2024-2025:Lifting of Canal slab for cleaning and then for replacing / dismantling by manually as per the direction of Departmental officers at site | 20 | each | 916.5 ₹18,330 | 834 ₹16,680 Lowest | 888 ₹17,760 | 937.2 ₹18,744 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 22.99 | cum | 2,131.5 ₹49,007.45 | 1,939.6 ₹44,595.28 Lowest | 2,065.3 ₹47,485.38 | 2,179.7 ₹50,115.66 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 181.42 | cum | 218.2 ₹39,585.84 | 198.5 ₹36,011.87 Lowest | 211.4 ₹38,352.19 | 223.1 ₹40,474.8 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9 | cum | 6,718.2 ₹60,463.8 | 6,113.4 ₹55,020.6 Lowest | 6,509.5 ₹58,585.5 | 6,870.2 ₹61,831.8 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 53.21 | sqm | 646.1 ₹34,377.69 | 587.9 ₹31,280.98 Lowest | 626 ₹33,308.21 | 660.7 ₹35,154.53 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.45 | cum | 8,882.7 ₹2,17,164.25 | 8,083 ₹1,97,613.18 Lowest | 8,606.7 ₹2,10,416.6 | 9,083.6 ₹2,22,075.85 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,200.32 | kilogram | 95.2 ₹2,09,470.46 | 86.6 ₹1,90,547.71 Lowest | 92.2 ₹2,02,869.5 | 97.4 ₹2,14,311.17 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 158 | sqm | 327 ₹51,666 | 297.6 ₹47,020.8 Lowest | 316.9 ₹50,070.2 | 334.4 ₹52,835.2 |
Tender Value
₹9.7 L
EMD Value
₹24,339
Closing Date
20 Jun 2026, 6:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer, MI subdivision Parappanangadi
GENERAL-Vazhakkad LIS-Reconstruction of the damaged Main Canal slab of Vazhakkad LIS near pump house in Kondotty LA in Malappuram District-General Civil Work
2026_Irrig_855585_1
IRR/IA/TR/7495/2024_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
VAZHAKKAD
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,150
Yes
₹24,339
14 Aug 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
20 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reconstruction of canal slab | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | OD26976/2024-2025:Lifting of Canal slab for cleaning and then for replacing / dismantling by manually as per the direction of Departmental officers at site | - | each | - | - |
| 1.003 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.009 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 2.72 MB
BOQ_1445983.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .