Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.0 LAccepted-AOC | ₹12.0 L | 1 | Accepted-AOC ACCEPT |
| 2 | 2₹14.6 L+₹2.6 L (21.4%)Rejected-Finance | ₹14.6 L+₹2.6 L (21.4%) | 2 | Rejected-Finance 2 |
| 3 | 3₹15.2 L+₹3.2 L (26.4%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹15.2 L+₹3.2 L (26.4%) | 3 | Rejected-Finance 3 |
| 4 | 4₹15.7 L+₹3.6 L (30.3%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹15.7 L+₹3.6 L (30.3%) | 4 | Rejected-Finance 4 |
| 5 | 5₹18.1 L+₹6.0 L (50.2%)Rejected-Finance 86 NAKKA KUAN GARHMUKTESHWAR DISTRICT HAPUR | ₹18.1 L+₹6.0 L (50.2%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | RAJKESH SHARMA L2 | ARTIST BRO L3 | M/S Harish Kumar Contractor L4 | M/S VASUDEV CONSTRUCTION L6 | Maruti Engineering and Construction Company L1 | M/S NARENDRA KUMAR SHARMA CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 507 | Cum | 75 ₹38,025 | 50 ₹25,350 Lowest | 84.79 ₹42,988.53 | 90 ₹45,630 | 80 ₹40,560 | 80 ₹40,560 |
| 2.00 | Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 58 | Cum | 4,500 ₹2,61,000 Lowest | 4,500 ₹2,61,000 Lowest | 5,087.4 ₹2,95,069.2 | 5,900 ₹3,42,200 | 4,800 ₹2,78,400 | 5,800 ₹3,36,400 |
| 3.00 | Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 232 | Cum | 4,600 ₹10,67,200 | 5,000 ₹11,60,000 | 4,833.03 ₹11,21,262.96 | 5,680 ₹13,17,760 | 3,500 ₹8,12,000 Lowest | 5,679 ₹13,17,528 |
| 4.00 | 12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 225 | Sqm | 150 ₹33,750 | 120 ₹27,000 Lowest | 169.58 ₹38,155.5 | 195 ₹43,875 | 140 ₹31,500 | 180 ₹40,500 |
| 5.00 | C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 5.25 | Cum | 5,550 ₹29,137.5 | 6,000 ₹31,500 | 6,274.46 ₹32,940.92 | 7,390 ₹38,797.5 | 5,200 ₹27,300 Lowest | 7,300 ₹38,325 |
| 6.00 | Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 291 | Cum | 112 ₹32,592 | 60 ₹17,460 | 131.42 ₹38,244.53 | 130 ₹37,830 | 50 ₹14,550 Lowest | 123 ₹35,793 |
Tender Value
₹18.5 L
EMD Value
₹37,000
Closing Date
22 Aug 2025, 12:00 pmClosed
Executive Engineer
U.M.B.C.D.G.C. Khurja
Construction of Retaining wall
2025_UPIDC_1065054_21
08/E.E./2025-26
Open Tender
Civil Works
Item Rate
90 days
U.M.B.C.D.G.C. Khurja
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,039
₹37,000
4 Oct 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
RAJKESH SHARMA (BID ID -5466174)
ARTIST BRO (BID ID -5466188)
M/S Harish Kumar Contractor (BID ID -5470862)
M/S NARENDRA KUMAR SHARMA CONTRACTOR (BID ID -5472432)
M/S VASUDEV CONSTRUCTION (BID ID -5472152)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .