| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-Finance | 1 | Accepted-Finance L2 | |
| 2 | 2₹4.8 L−₹15,757.73 (3.16%)Accepted-Finance | 2 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | MOOSA K.I. L2 | kamarudheen km L1 |
|---|---|---|---|---|---|
| 1.00Tile Laying | |||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 32.1 | cum | 65.5 ₹2,102.55 Lowest | 66.84 ₹2,145.56 |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 48.15 | cum | 2,434.39 ₹1,17,215.88 | 1,945.62 ₹93,681.6 Lowest |
| 1.00 | OD2335/2025-2026:Providing and laying 80mm thick factory made cement concrete interlocking paver block of M40 grade made by block making machine with strong vibratory compaction, of approved size design & shape, laid in required color and pattern over and including 50mm thick compacted bed of approved cushion material compacting and proper embedding/laying of interlocking paver block in to the bedding layer through vibratory compaction using plate vibrator, and cutting of paver blocks as per required size and pattern, finishing etc.(IS 15658:2006). as per manufacturer specification &the direction of Engineer -in- charge | 277.68 | sqm | 1,137.12 ₹3,15,755.48 Lowest | 1,160.33 ₹3,22,200.43 |
| 1.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 6.6 | cum | 9,003 ₹59,419.8 Lowest | 9,186.73 ₹60,632.42 |
| 1.00 | OD385776/2025-2026:Supplying and fixing in place granite name board of slab area less tha 0.9 sqm including
engraving and painting lettetrs etc complete as per direction of Engineer in charge at site OD
79/21-22 | 0.45 | sqm | 8,191.18 ₹3,686.03 Lowest | 8,360 ₹3,762 |
Tender Value
₹5.1 L
EMD Value
₹12,709
Closing Date
29 May 2026, 4:00 pmClosed
ASSISTANT ENGINEER
eloor municipality office
MLA-SDF-Eloor Municipality -Kuzhivelil road tile laying in ward 3-Kuzhivelil road tile laying in ward 3-General Civil Work
2025_LSGD_824403_3
MLA SDF/01/ET/AE/LSGD/ELR/2025-26
Open Tender
Civil Works - Roads
Item Rate
240 days
ELOOR MUNICIPALITY
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
Yes
₹12,709
Yes
1 Oct 2026
22 May 2026
1 Jun 2026
22 May 2026
29 May 2026
22 May 2026
22 May 2026 - 29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Tile Laying | |||||
| 1.001 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | - | cum | - | - |
| 1.002 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 1 | cum | - | - |
| 1.003 | OD2335/2025-2026:Providing and laying 80mm thick factory made cement concrete interlocking paver block of M40 grade made by block making machine with strong vibratory compaction, of approved size design & shape, laid in required color and pattern over and including 50mm thick compacted bed of approved cushion material compacting and proper embedding/laying of interlocking paver block in to the bedding layer through vibratory compaction using plate vibrator, and cutting of paver blocks as per required size and pattern, finishing etc.(IS 15658:2006). as per manufacturer specification &the direction of Engineer -in- charge | - | sqm | - | - |
| 1.004 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 1 | cum | - | - |
| 1.005 | OD385776/2025-2026:Supplying and fixing in place granite name board of slab area less tha 0.9 sqm including
engraving and painting lettetrs etc complete as per direction of Engineer in charge at site OD
79/21-22 | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
kuzhivelilsbd.pdf
Tender Documents • 1.65 MB
BOQ_1440304.xls
BOQ • 0.30 MB
kuzhivelilnit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .