Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹12.3 L
EMD Value
₹24,700
Closing Date
18 Nov 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PWD RNB DH PORA
Office Executive Engineer PWD RNB DH PORA
Construction of Approach Road on Damhal side of Adijan Bridge Balance Work
2025_PWDJK_294932_1
47 Of RnB/D.H. Pora/2025-26/3782-90. Dt 12/11/2025
Open Tender
Civil Works
Percentage
20 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Executive Engineer RandB division D.H.pora
₹24,700
12 Nov 2025
12 Nov 2025
19 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer R&B Division D.H Pora
Name of Work: Construction of Approach Road on Damhal side of Adijan Bridge ( Balance Work ) Adv cost:- 12.35 Lacs ( incld GST) and all other Taxes
Contract No: 47 of RnB/DH Pora/2025-26/E-TENDERING/3782-90 Dated: 12-11-2025
Name of the Bidder/ Bidding Firm / Company :
Sl. No. ITEM OF WORK Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT Without GST TOTAL AMOUNT In Words
1 Crate work ( protection)
2 Engagement of JCB for site clearence, cutting of trees,removal of stems, bushes,dressing levelling as per directions of Engineer in charge 9 hr 1000 Excess(+) Full Conversion INR
3 Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : 29.609 Cum 187 Excess(+) Full Conversion INR
4 supply and filling of Nallah stones in wire crates hand packed tightly including spreading,binding of wire crates after stone filling including cost and carriage of wire crates and stones complete as per the directions of Engineer In Charge mesh of wire crates 100X 100mm and wire of dia 4mm GI 322.118 Cum 2000 Excess(+) Full Conversion INR
5 supply and filling of RBM (River bed material) including spreading in uniform layers, ramming, watering and and consoldation with all carraiges upto site of work complete. 461.348 Cum 440 Excess(+) Full Conversion INR
6 Providing and laying 200 mm dia DI pipes (5.5 mtr) including trenching and providing of required quantity of RBM over and under pipes as cushing complete 1 No 13000 Excess(+) Full Conversion INR
7 supplying and stacking at site graded crushed stone aggregate, laying, spreading and compacting stone aggregate of 63-45mm size to WBM Specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller of 8-10 tonne capacity in stages to proper grade and camber, applying and brooming 13.2 mm nominal size type A screening and binding material to fill up interstices of coarse aggregate, watering and compacting to required density including all carriages of materials as involved complete (Finished work to be measured 75mm thick compacted thickness) 27.059 Cum 2200 Excess(+) Full Conversion INR
8 Concrete drain
9 Earth work in excavation all kinds of soil by mechanical means in trenches for foundations,drain (not exceeding 1.5 m in width) and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms, all lifts including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 28.81 Cum 252 Excess(+) Full Conversion INR
10 Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete. 4.257 Cum 750 Excess(+) Full Conversion INR
11 Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete back filling 4.2 Cum 750 Excess(+) Full Conversion INR
12 Providing and laying in position cement concrete 1:4:8 (1 Cement:4 Corase sand: 8 graded stone aggregate 40 mm nominal size ) including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete 4.257 Cum 4800 Excess(+) Full Conversion INR
13 Providing and laying in position cement concrete 1:2:4 (1 Cement:2 Corase sand: 4 grade stone aggregate 20 mm nominal size ) including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete 38.136 Cum 6100 Excess(+) Full Conversion INR
14 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns etc 129.948 sqm 262 Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_954373.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .