Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76,087.33Accepted-Finance | ₹76,087.33 | L1 | Accepted-Finance Lowest rate ,hence admitted |
| 2 | L2₹86,460Accepted-Finance | ₹86,460 | L2 | Accepted-Finance Higher rate ,hence not admitted |
| Sl No | Description | Qty | Unit | FRANCIS PINHERO L2 | JEFRIN PINHERO L1 |
|---|---|---|---|---|---|
| 1.00Clearing Canal | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 900 | sqm | 12 ₹10,800 | 9.27 ₹8,343 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 2,730 | sqm | 20 ₹54,600 | 18.19 ₹49,658.70 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 70.2 | cum | 300 ₹21,060 | 257.63 ₹18,085.63 |
Tender Value
₹76,087
EMD Value
₹1,902
Closing Date
19 May 2026, 6:00 pmClosed
Assistant Executive Engineer
MI Subdivision irinjalakuda
GENERAL KDLR Monsoon Preparedeness2026 Removing debris and desilting of Edathiruthy LI Scheme canal in Edathiruthy Panchayath General Civil Work
2026_Irrig_850657_1
IRR/IA/292/2026-2027
Open Tender
Civil Works - Others
Edathiruthy
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹1,902
Yes
22 May 2026
13 May 2026
21 May 2026
13 May 2026
19 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Clearing Canal | ||||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1437367.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1437367.xls
BOQ • 0.23 MB
fot.pdf
Tender Documents • 0.01 MB
pa.pdf
Tender Documents • 0.03 MB
ipact.pdf
Tender Documents • 0.01 MB
epay.pdf
Tender Documents • 0.01 MB
affidavit.pdf
Tender Documents • 0.01 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid