Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC VILLAGE SIVIAN DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.5 Cr | 1 | Accepted-AOC awarded |
| 2 | 2₹1.5 Cr+₹6.9 L (4.68%)Rejected-Finance 107 KRISHNA COLONY MALOUT DISTRICT SRI MUKTSAR SAHIB | MALOUT | SRI MUKTSAR SAHIB | ₹1.5 Cr+₹6.9 L (4.68%) | 2 | Rejected-Finance high bidder |
| Sl No | Description | Qty | Unit | Dinesh Kumar Garg Contractor L2 | EVERGREEN EARTH MOVERS L1 |
|---|---|---|---|---|---|
| 1.00 | Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge upto 1.5 cumecs | 5.71 | km | 1,308 ₹7,468.68 Lowest | 1,869 ₹10,671.99 |
| 2.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 6,486 | cum | 39 ₹2,52,954 | 35 ₹2,27,010 Lowest |
| 3.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations inlcuding all lifts and leads, excluding royality. | 9,928.68 | cum | 190 ₹18,86,449.2 | 172 ₹17,07,732.96 Lowest |
| 4.00 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications | 7,274 | cum | 102 ₹7,41,948 | 99 ₹7,20,126 Lowest |
| 5.00 | Dressing of Earthwork for new work or remodeling work. | 33,145 | sqm | 1 ₹33,145 Lowest | 1 ₹33,145 Lowest |
| 6.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 5,066 | cum | 170 ₹8,61,220 | 159 ₹8,05,494 Lowest |
| 7.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 293.32 | cum | 153 ₹44,877.96 Lowest | 191 ₹56,024.12 |
| 8.00 | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification. | 20,225 | sqm | 20 ₹4,04,500 | 18 ₹3,64,050 Lowest |
| 9.00 | Dag Belling single kassi stroke complete in all respect | 5.71 | km | 848 ₹4,842.08 Lowest | 848 ₹4,842.08 Lowest |
| 10.00 | Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes. | 22,964.67 | sqm | 25 ₹5,74,116.75 | 22 ₹5,05,222.74 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
15 Apr 2026, 11:00 amClosed
Executive Engineer
Faridkot Canal and Ground Water Division Faridkot
Estimate for Concrete Lining of 7-L Minor of Kokri Disty from RD 0-18717
2026_WR_164601_1
Estimate for Concrete Lining of 7-L Minor of Kokri Disty from RD 0-18717
Open Tender
Civil Works - Canal
Item Rate
50 days
JAGROAN
Pre Qualification Details
2 documents required · 2 mandatory
₹2,000
Yes
₹2.8 L
Yes
Faridkot
13 May 2026
25 Mar 2026
15 Apr 2026
25 Mar 2026
15 Apr 2026
25 Mar 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge upto 1.5 cumecs | - | km | - | - |
| - | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | - | cum | - | - |
| - | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations inlcuding all lifts and leads, excluding royality. | - | cum | - | - |
| - | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications | - | cum | - | - |
| - | Dressing of Earthwork for new work or remodeling work. | - | sqm | - | - |
| - | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | - | cum | - | - |
| - | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | - | cum | - | - |
| - | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification. | - | sqm | - | - |
| - | Dag Belling single kassi stroke complete in all respect | - | km | - | - |
| - | Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_333532.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .