| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹40.3 L+₹42,808 (1.07%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹40.3 L+₹48,320.60 (1.21%)Accepted-Finance | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | ElectroTrade L2 | GAYEN ELECTRIC L1 | RKS ENGINEER & CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00Electrical part of Manirtat substation | ||||||
| 1.01 | Supply & Erection of Gantry structure with 33 KV LA (GI Fabricated) | 3 | NOS | 45,460 ₹1,36,380 Lowest | 45,985 ₹1,37,955 | 46,570 ₹1,39,710 |
| 1.02 | Supply & Erection of H/L isolator support for 33 KV with LA(GI Fabricated) | 2 | NOS | 41,410 ₹82,820 | 40,975 ₹81,950 Lowest | 41,510 ₹83,020 |
| 1.03 | Supply & Erection of H/L isolator support for 33 KV (GI Fabricated) | 12 | NOS | 40,653 ₹4,87,836 | 40,200 ₹4,82,400 Lowest | 40,700 ₹4,88,400 |
| 1.04 | Supply & Erection of L/L isolator support for 33 KV (GI Fabricated) | 7 | NOS | 34,845 ₹2,43,915 | 34,465 ₹2,41,255 Lowest | 34,905 ₹2,44,335 |
| 1.05 | Supply & Erection of L/L Bus Support Structure for 33 KV (GI Fabricated) | 3 | NOS | 23,230 ₹69,690 | 22,990 ₹68,970 Lowest | 23,240 ₹69,720 |
| 1.06 | Erection of 18 Pole Structure with 8 Mtr PCC Pole | 1 | NOS | 1,81,800 ₹1,81,800 | 1,79,925 ₹1,79,925 Lowest | 1,82,200 ₹1,82,200 |
| 1.07 | Supply & Erection of C.T. Structure 33 KV OD (GI Fabricated) | 5 | NOS | 21,778 ₹1,08,890 | 21,550 ₹1,07,750 Lowest | 21,800 ₹1,09,000 |
| 1.08 | Supply & Erection of P.T. Structure 33 KV OD (GI Fabricated) | 2 | NOS | 21,778 ₹43,556 | 21,550 ₹43,100 Lowest | 21,800 ₹43,600 |
| 1.09 | Supply & Erection of Cable Supporting Structure(GI Fabricated) | 3 | NOS | 20,036 ₹60,108 | 19,820 ₹59,460 Lowest | 20,000 ₹60,000 |
Tender Value
₹39.9 L
EMD Value
₹79,804
Closing Date
12 Sept 2025, 3:00 pmClosed
DIVISIONAL MANAGER JOYNAGAR DIVISION
Office of the Divisional Manager Joynagar Division WBSEDCL Near Joynagar I B D O Office Vill P O Baharu P S Joynagar 24 Pgs South Pin Code 743372
E tender of electrical part for construction of Monirtat 33/11 KV Substation under Joynagar Division
2025_WBSED_894599_1
WBSEDCL/DM/JNG/E-TENDER/25-26/ 622
Open Tender
Electrical Work/ Equipment
Item Rate
E tender of electrical part for construction o
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹79,804
27.08.2025
18 Sept 2025
26 Aug 2025
15 Sept 2025
26 Aug 2025
12 Sept 2025
27 Aug 2025
27 Aug 2025
Amount
Electrical part of Manirtat substation
Supply & Erection of Gantry structure with 33 KV LA (GI Fabricated)
Supply & Erection of H/L isolator support for 33 KV with LA(GI Fabricated)
Supply & Erection of H/L isolator support for 33 KV (GI Fabricated)
Supply & Erection of L/L isolator support for 33 KV (GI Fabricated)
Supply & Erection of L/L Bus Support Structure for 33 KV (GI Fabricated)
Erection of 18 Pole Structure with 8 Mtr PCC Pole
Supply & Erection of C.T. Structure 33 KV OD (GI Fabricated)
Supply & Erection of P.T. Structure 33 KV OD (GI Fabricated)
Supply & Erection of Cable Supporting Structure(GI Fabricated)
Erection of 33KV, 400A, centre rotating HL Isl with ES
Erection of 33KV, 400A, centre rotating HL Isl with out ES
Erection of 33KV, 400A, centre rotating LL Isl with out ES
Erection of 33KV VCB, SCADA compatible OD
Erection of 33KV , C&R Panel , SCADA Com. For feeder control
Erection of 33KV , C&R Panel , SCADA Com. For individual PTR control with differential relay.
Erection of 33KV, 200-100/1-1-1A, CT
Erection of 33KV, dual core, dual ratio,400-200/1-1 Amp
Erection of 33KV PT (1ph, O/D Type)
Laying & jointing of 1.1KV 4C x 2.5 sq.mm copper control cable with supply of cable lugs,glands,tapes,sockets etc
Laying & jointing of 1.1KV 8C x 2.5 sq.mm copper control cable with supply of cable lugs,glands,tapes,sockets etc
Laying & jointing of 1.1KV 12C x 2.5 sq.mm copper control cable with supply of cable lugs,glands,tapes,sockets etc
Erection of Railpole for shield wire
Installation of 30V,100 AH Battery
Installation of 30V, 35 A Automatic Float cum boost battery charger
Erection of 42KV class gapless LA
Installation of A.C. 3Phase C.T. and P.T operated eletronic meter for 3 PH 4 wire balanced load having meter accuracy class 0.5 TOD anti tamper feature for LAN and remote connectivity along with supply of meters
Installation of Data communication system including hardware & cables with telephone modem,MRI for all meters having features for Lan and remote connectivity with supply of materials.
Laying of 11KV, 3X300 sq. mm XLPE cable into cable trench
Laying of 1.1 KV 185 sq. Mm 4C , PVC Cable
Laying of 1.1 KV 120 sq. Mm 4C , XLPE Cable
Laying of 1.1 KV 50 sq. Mm 4C , PVC Cable
Laying of 1.1 KV 16 sq. Mm 4C , PVC Cable
Supply & Laying of 1.1 KV 16 sq. Mm 2C , PVC Cable
Supply & Laying of 1.1 KV 10 sq. Mm 2C , PVC Cable
Supply & Jointing of O/D type heat shrinkable end Jointing kit of 11 Kv 3CX300 SQMM XLPE cable prefarably rechem/3M
Supply & Jointing of I/D type heat shrinkable end Jointing kit of 11 Kv 3CX300 SQMM XLPE cable prefarably rechem/3M
Making End Termination Joint including supply of cable lugs,glands,tapes,sockets etc of 1.1 KV 185 sqmm 4c PVC cable
Making End Termination Joint including supply of cable lugs,glands,tapes,sockets etc of 1.1 KV 120 sqmm 4c PVC cable
Making End Termination Joint including supply of cable lugs,glands,tapes,sockets etc of 1.1 KV 50 sqmm 4c PVC cable
Making End Termination Joint including supply of cable lugs,glands,tapes,sockets etc of 1.1 KV 16 sqmm 4c PVC cable
Making End Termination Joint including supply of cable lugs,glands,tapes,sockets etc of 1.1 KV 16 sqmm 2c PVC cable
Making End Termination Joint including supply of cable lugs,glands,tapes,sockets etc of 1.1 KV 10 sqmm 2c PVC cable
Fixing of 12 KV Gapless LA (3 nos.=1 set
Supply & Installation of A.C. Switch Board
Supply & Installation of D.C. Switch Board
Erection of 11KV, 800A, 350MVA, 11 Panel shunt trip switchboard with VCB, SCADA compatible (2IN+1BC+8OUT)
Installation of 6.3 MVA, 33/11 KV Power
Installation of RTCC Panel For 6.3 MVA,
Supply & Installation of C.T. Junction Box
Supply & Installation of P.T. Junction Box
Supply & Installation of L.T. Distribution Box for Station service transformer
Installation of 100KVA, 33/0.4KV Stn. Service transformer
Supply & installation of YARD lightening
Erection of ACSR 200 Sq. mm (PANTHER) Conductor (3 wire) including laying, hoisting, jointing etc
Erection of ACSR 50 Sq. mm Conductor (1- wire) including laying, hoisting, jointing etc
Supply & Erection of Al 1.5” Bus Pipe including Jointing (Medium Duty)
Supply & Erection of 1.5” Al Bus Pipe to Pipe Connector
Supply & Erection of Isolator Pad to 1.5” Al Bus Pipe Bi-metallic connector
Supply & Erection of Tee-connector bi-metallic 33KV ISI PAD TO PANTHER
Supply & Erection of Tee-Connector .33KV PANTHER TO PANTHER
Supply & Erection of Al 1.5” Pipe Rigid Bus support to CT connector
Supply & erection AL.Tee- CON. PIPE BUS TO PIPE BUS(2”)
Supply & Erection of 1.5” Pipe flexible Bus Support Connector
Fixing of 33 KV Pin Insulator with Pin insulator with pin
Erection of 33 KV Post Insulator
Fixing of 11 KV Pin Insulator
Fixing of 11 KV Disc Insulator
Fixing of 11 KV TPGO Isolator
Rising of 11 KV 3CX300 sq. mm Cable with supply of 150 mm Dia GI pipe
Fixing of Danger Board 33 KV & 11 KV
Supply & Erection of FLOOD LIGHT COMPLETE SET 400W
Supply & Erection of SERVICE JUNCTION BOX
Supply & Erection of SURGE ARRESTOR
Supply & fixing cable optical FIBRE ARMOURED
ElectroTrade (BID ID -6912055)
RKS ENGINEER & CONTRACTOR (BID ID -6918364)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .