Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.0 LAccepted-AOC | ₹61.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹61.7 L+₹63,248 (1.04%)Rejected-Finance | ₹61.7 L+₹63,248 (1.04%) | L2 | Rejected-Finance Price quoted high |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Technically Disqualified |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Technically Disqualified |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Technically Disqualified |
| Sl No | Description | Qty | Unit | D and B Construction L2 | M/S PARSHU RAM L1 |
|---|---|---|---|---|---|
| 1.00CIVIL WORK | |||||
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 3.00 | All kinds of soil. | 163.59 | Cum | 253 ₹41,388.27 | 251.5 ₹41,142.89 Lowest |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 108 | Cum | 190 ₹20,520 | 188.93 ₹20,404.44 Lowest |
| 5.00 | Carriage of material Disposal of Earth by mechanical transport including loading, unloading to 5km. | 55.59 | Cum | 317 ₹17,622.03 | 316.09 ₹17,571.44 Lowest |
| 6.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 9.67 | Cum | 2,066 ₹19,978.22 | 2,064.63 ₹19,964.97 Lowest |
| 7.00Supplying chemical emulsion in sealed containers including delivery as specified. | |||||
| 8.00 | Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 35.8 | litre | 228 ₹8,162.4 | 226.64 ₹8,113.71 Lowest |
| 9.00Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : | |||||
| 10.00Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | |||||
Tender Value
₹65 L
EMD Value
₹1.3 L
Closing Date
13 May 2026, 4:00 pmClosed
EE MID UTTARKASHI
EE MID UTTARKASHI
CONSTRUCTION OF TYPE - II RESIDENCE IN THE PREMISES OF PRIMARY HEALTH CENTRE BARKOTE AT BLOCK NAUGAWN DISTRICT UTTARKSHI
2026_MI_95050_3
01/2026-27
Open Tender
Civil Works
Item Rate
300 days
DISTRICT UTTARKASHI
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹4,720
EE MID UTTARKASHI
₹1.3 L
EE MID UTTARKASHI
30 Jul 2026
4 May 2026
15 May 2026
4 May 2026
13 May 2026
4 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 3 | All kinds of soil. | 163.59 | Cum | - | - |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 108 | Cum | - | - |
| 5 | Carriage of material Disposal of Earth by mechanical transport including loading, unloading to 5km. | 55.59 | Cum | - | - |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 9.67 | Cum | - | - |
| 7 | Supplying chemical emulsion in sealed containers including delivery as specified. | - | - | - | - |
| 8 | Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 35.8 | litre | - | - |
| 9 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : | - | - | - | - |
| 10 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_112409.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_112409.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .