Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.79Accepted-AOC | ₹0.79 | L1 | Accepted-AOC L1 |
| 2 | L2₹0.85+₹0.06 (7.59%)Rejected-Finance | ₹0.85+₹0.06 (7.59%) | L2 | Rejected-Finance L2 |
| 3 | L3₹0.88+₹0.09 (11.4%)Rejected-Finance | ₹0.88+₹0.09 (11.4%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Esteem Developers (P) Limited L3 | Synergy Architects and Engineers L2 | Urban Grey Water Solutions L1 |
|---|---|---|---|---|---|---|
| 1.00PREPARATION OF DETAILED PROJECT REPORT | ||||||
| 2.00 | Stage II - Draft Report
1. Final Architectural Drawings & Models
2. Structural Drawings (prior to vetting)
3. DSR Estimate - Civil
4. Draft DPR
Stage III - Final Report
1. Final Structural Drawings
2. Electrical, Plumbing HVAC, Fire and PCB Drawings
3. Civil, Electrical, HVAC & Fire Estimate.
4. Building Permit Drawings
5. Final DPR
Stage IV - Technical Sanction
1. Assistance for Technical Sanction
(NB: The bidder agencies are required to submit their quote towards consultancy charges for DPR Preparation, as percentage of the Basic Project Cost, which shall not exceed 0.88%.) | 1 | each | 0.88 ₹0.88 | 0.85 ₹0.85 | 0.79 ₹0.79 Lowest |
Tender Value
Refer Docs
EMD Value
₹27,940
Closing Date
2 Jun 2026, 5:35 pmClosed
ENGINEER PROJECTS
KEL MAMALA KOCHI
PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF A NEW TOWN HALL FOR ALAPPUZHA MUNCIPALITYBALANCE WORKS
2026_KEL_852949_1
KRO/BDC/2390/2026
Open Tender
Miscellaneous Works
Percentage
KEL MAMALA KOCHI
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,950
₹27,940
Yes
23 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PREPARATION OF DETAILED PROJECT REPORT | - | - | - | - |
| 2 | Stage II - Draft Report
1. Final Architectural Drawings & Models
2. Structural Drawings (prior to vetting)
3. DSR Estimate - Civil
4. Draft DPR
Stage III - Final Report
1. Final Structural Drawings
2. Electrical, Plumbing HVAC, Fire and PCB Drawings
3. Civil, Electrical, HVAC & Fire Estimate.
4. Building Permit Drawings
5. Final DPR
Stage IV - Technical Sanction
1. Assistance for Technical Sanction
(NB: The bidder agencies are required to submit their quote towards consultancy charges for DPR Preparation, as percentage of the Basic Project Cost, which shall not exceed 0.88%.) | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1441265.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .