Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹84,605.42Accepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | Rejected-Technical KALAYATHINNAKUZHI HOUSE KUTTILANJIL | KOTTAYAM | KERALA | 686102 | - | Rejected-Technical all document submitted |
| Sl No | Description | Qty | Unit | KP MUHAMMED L2 | MUJEEB P A L1 |
|---|---|---|---|---|---|
| 1.00hand rail | |||||
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 290 | kg | 200 ₹58,000 | 178.42 ₹51,741.8 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.75 | cum | 11,013.2 ₹19,273.1 | 10,488.77 ₹18,355.35 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 105 | kilogram | 118.05 ₹12,395.25 | 112.43 ₹11,805.15 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 7 | sqm | 405.46 ₹2,838.22 | 386.16 ₹2,703.12 Lowest |
Tender Value
₹84,605
EMD Value
₹2,115
Closing Date
24 Feb 2026, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
LSGD SUB DIVISION KOTHAMANGALAM
Annual Plan-KMBP 2025-26PROJECT NO362/26-Installation of hand rails for Ponnattu chira open gymnasium - Varappetty Grama Panchayath-General Civil Work
2026_LSGD_836962_1
KMBP 362/26
Open Tender
Civil Works - Others
Item Rate
KOTHAMANGALAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹555
₹2,115
26 Mar 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
hand rail
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1409237.xls
BOQ • 0.30 MB
viewnit.pdf
Other Document • 0.02 MB
viewsbd.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .