Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.2 LAccepted-AOC | 1 | Accepted-AOC accepted | |
| 2 | 2₹8.5 L+₹33,217 (4.04%)Rejected-AOC | 2 | Rejected-AOC rejected | |
| 3 | 3₹8.7 L+₹50,389 (6.13%)Rejected-AOC | 3 | Rejected-AOC rejected |
Tender Value
₹7.6 L
EMD Value
₹19,200
Closing Date
30 Sept 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HOD MS
HOD MS MS Unit KMML Chavara
Construction of sedimentation pit at pcp two
2023_KMML_599965_2
KMML/M/C/T/06/2023 dtd 04/09/2023
Open Tender
Civil Works - Others
Item Rate
45 days
MS Unit KMML
contracor valid license and gst registration
2 documents required · 2 mandatory
₹1,850
₹19,200
Yes
25 Jan 2024
15 Sept 2023
3 Oct 2023
15 Sept 2023
30 Sept 2023
15 Sept 2023
15 Sept 2023 - 30 Sept 2023
Site Clearence and Drainage
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.7 Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Earthwork excavation
12.1.B.1 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.1.B.2 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means
ANUKUMAR R
TVK CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .