Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LQualified | L1 | Qualified MII | |
| 2 | L2₹38.2 L+₹30,702.71 (0.81%)Qualified | L2 | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹90,980
Closing Date
29 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CERTAIN BR REPAIRS AND MANNING AND OPERATION OF EM
3065295
GEM/2022/B/1873568
Engaging minimum 2 (Two) Semi Skilled category of worker per shift,Engaging minimum 1 (one) Semi
335 days
Assam; Sonitpur
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
3 yrs
₹22 L
50%
₹90,980
4 Feb 2022
19 Jan 2022
29 Jan 2022
60 days from bid end date (until 30 Mar 2022)
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Engaging minimum 2 (Two) Semi Skilled category of worker per shift | Outsourcing for operation of Air Conditioning alongwith DG set Installation at Bomb Dump and WWR, with min two operator per shift (semi skilled) ( one operator deploy at DB-06 AC plant and other one operator deploy at WWR AC plant), in three shifts per day for 8 hours each shift for seven days in a week comprising of the following Plant / Machineries / Equipments at AF Stn Tezpur all as directed by Engr-in-Charge.
(a) AC Plant install at Bomb Dump .
(i) Compressor capacity 7.5 TR x 03 Nos (02 Nos running and 01 No stand by (ii) Electric motor for compressor 10 HP x 03 Nos.
(iii) Shell & tube type condenser 7.5 TR x 03 Nos. (iv) Cooling coils & liquid lines and control valves.
(v) Blower unit complete (vi) Cooling tower with water pipe lines.
(vii) Water pumping set capacity 3411 LPM also on head - 02 Nos. (viii) Ducts.
(ix) Electric control panel - 01 No & all other measuring and controlling instruments complete.
(b) DG Set install with.
(i) DG Set of capacity 160 KVA-01 No
(ii) AMF panel along with LT control panel-01 No
(iii) Operation of Security Lights Switches as per Time schedule
(c) AC plant install at WWR .
(i) Compressor capacity 15 TR x 03 Nos (02 Nos working and 01 Nos as standby) (ii) Electric motor for compressor 20 HP x 03 Nos.
(iii) Shell & tube condenser 15 TR x 03 Nos. (iv) Cooling coil & liquid / refrigerant pipe with control valves.
(v) Blower unit complete. (vi) Cooling tower with water pipe lines.
(vii) Water pumping set of capacity 450 LPM also on head - 02Nos (viii) Ducts.
(ix) Electric control panel - 01 No & all other measuring and controlling instruments complete.
(x) Operation of security lights switches as per time schedule given by the Engr-in Charge. | 335 | Per Day | getez@27 | 335 |
| 2 | Engaging minimum 1 (one) Semi Skilled category of worker per shift | Outsourcing for operation of DG sets of Logistic power house, with min one operator per shift (semi skilled) in one shift per day for 8 hours each shift for seven days in a week comprising of the following plant/machineries /equipment at AF Stn Tezpur under GE (AF) Tezpur all as directed.
(a) 15 KVA DG Set ,415 Volt 50 Hz -01 No
(b) 30 KVA DG Set ,415 Volt 50 Hz -01 No
(c) Operation of LT Panel Board as and when required.
(d) Operation of sequrity lights switches as per time schedule | 335 | Per Day | getez@27 | 335 |
| 3 | Engaging minimum 1 (one )Semi skilled category of worker per shift | Outsourcing for operation of DG sets of BPI-III power house, with min one operator per shift (semi skilled), in three shifts per day for 08 hours each shift for seven days in a week comprising of the following plant/machineries /equipment at AF Stn Tezpur complete all as directed.
(a) 110 KVA DG Set ,415 Volt 50 Hz -01 No
(b) 30 KVA DG Sets ,415 volts AC ,50Hz -01 No
(c) Operation of LT Panel Board as and when required.
(d) Operation of security lights switches as per time schedule given by the Engr-in Charge.
(e) 50 KVA DG set,415 Volt 50 Hz -01 No | 335 | Each | getez@27 | 335 |
| 4 | Engaging minimum 1 (one) Semi Skilled category of worker per shift | Outsourcing for operation of DG Sets, AC Plant, pump house and fire fighting installations at New Tech Flight power house, with min one operator per shift (semi-skilled) in three shifts per day for 08 hours each shift for seven days in a week comprising of the following plant/machineries /equipments at AF Stn Tezpur complete all as directed.
Six DG sets alongwith panel boards of different capacity are located in same location
(a) 500 KVA DG Sets ,415 Volt 50 Hz -04 Nos
(b) 400 KVA DG Sets ,415 volts AC ,50Hz -02 Nos (c) Operation of LT Panel Board as and when required. (d) Booster pumping set 7.5 HP cap for feeding the water to service tank of -02 Nos
(e) Dry wet automatic fire fighting systsm consisting of the following (i) Main centrifugal pumping set electric driven 100 HP cap-01 No(ii) 97.91 KVA DG Set ,415 Volt 50 Hz -01 No(iii) Jokey pump electric driven 15 HP cap -01 No
(f) AC Plant total 300 TR (100 TRx03 Units) ( 100 TR x 2 units under working & 100 TR x 01 unit stand by)
(g) Operation of security lights switches as per time schedule given by the Engr-in-charge-01 Job
(h) Electric control panel -01 No. and all other measuring and controling instrument complete. | 335 | Per Day | getez@27 | 335 |
| 5 | Engaging minimum 1 (one) Semi Skilled category of worker per shift | Outsourcing for operation of DG Sets,AC plant installations at Tech Flight power house & Avionic lab, with min one operator per shift (Semi-Skilled), in two shifts per day for 08 hours each shift for seven days in a week comprising of the following plant/machineries /equipment at AF Stn Tezpur complete all as directed.
Note:- Two DG sets alongwith panel boards of different capacity are located in same location.
(a) 500 KVA DG Set ,415 Volt 50 Hz -01 No
(b) 125 KVA DG Sets ,415 volts AC ,50Hz -01 No
(c) Operation of LT Panel Board as and when required.
(d) Operation of security lights switches as per time schedule given by the Engr-in charge-01 No Job
(e) AC Plant install with
(i) Water cooled scrill chiller unit based central AC plant with the capacity of Compressor 26 TR & 02 Nos (02 Nos running) and automatic purage system capacity control devices and SPDP: squirrel case induction motor.
(ii) Electric motor for compressor 05 HP x 04 Nos.
(iii) Water cooled shell & tube type condenser with safety valves drain vlves temperature and pressure gauges for inlet / outlet water 26 TR x 02 Nos.
(iv) Cooling coils & liquid lines and control valves.
(v) Blower unit complete.
(vi) Cooling tower with water pipe lines
(vii) Water pumping set capacity 3411 LPM also on head - 02 Nos
(viii) Ducts
. (ix) Heat exchanger liquid indicator filters cum dryer unit and expansion valve
.(x) Thermostat and gauges.
(xi) Heating system using strips heaters for dehumidification / winter heating comprising of 2 KW heaters 12 Nos
. (xii) Water tank PVC double layered of 2000 Ltrs - 01 No
(xiii) Electric control panel - 01 No & all other measuring and controlling instruments complete | 335 | Per Day | getez@27 | 335 |
| 6 | Item No. 06 | Taking down chowkhats or frames with shutter (without taking off shutter from the frame) exe 1.50 and not exc. 4.00 Sqm in each complete all as specified and directed. | 2 | Each | getez@27 | 335 |
| 7 | Item No. 07 | Taking down shutters of any description not exceeding 1.00 Sqm each complete all as directed. | 6 | Per Leaf | getez@27 | 335 |
| 8 | Item No. 08 | Taking down shutters of any description exceeding 2.00 Sqm each complete all as directed. | 2 | Per Leaf | getez@27 | 335 |
| 9 | Item No. 09 | Material and labour for 2nd class hard wood plain, solid, straight chowkhats & frames, wrought, paneled, rebated on the solid, rounded or chamfered put together with glue,pinned at joints complete all as specified and directed. | 1 | Cum | getez@27 | 335 |
| 10 | Item No. 10 | Supply and fix MS holdfast made up of FI 25 X 3mm conforming to Fe-410-0 or Fe-310-0 complete all as specified and directed. | 2 | Kg | getez@27 | 335 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3065295.pdf
GEM_BID
gemnit8615_2022-01-19-14-03-40_e80c1a9e38f75aa41eec7088f5c17e17.pdf
BOQ
boq_bombdump8615_2022-01-19-14-03-40_42d4dadcb66977759dfbef4f5fd16a08.csv
BOQ
OTHER
termsCondition.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .