Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹9.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.0 LAdmitted-Fee/PreQual/Technical/Finance H NO 700 MAUSWADO VARPE PERNEM GOA | NORTH GOA | GOA | 403001 | ₹9.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SUHAS SHANTARAM MASHELKAR L2 | M/s Ravalnath Constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Surface dressing of ground including removing vegetation in equalities not exceeding 15 cm deep and disposal of rubbish lead upto 50 m and lift upto 1.5 m. : Ordinary soil. | 396 | Sqm | 30 ₹14,018.4 | 19.5 ₹9,111.96 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 79.2 | Cu.m | 2,321 ₹2,16,911.38 | 1,658.25 ₹1,54,973.41 Lowest |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 79.2 | Cu.m | 7,200 ₹6,72,883.2 Lowest | 7,850 ₹7,33,629.6 |
Tender Value
₹8.6 L
EMD Value
₹17,110
Closing Date
20 Aug 2026, 10:00 amClosed
o/o Executive Engineer WD VII WRD Dhargal Pernem
o/o Executive Engineer WD VII WRD Dhargal Pernem
Improvement to the bund on Korkankarwada tank at Korkankarwada in VP Arambol in Mandrem Constituency
2026_WRD_30955_1
WRD/WDVII/2026-27/TN-06(1)
Open Tender
Civil Works - Water Works
Item Rate
30 days
VP Arambol in Mandrem Constituency
As per tender documents
3 documents required · 3 mandatory
₹3,000
₹17,110
28 Aug 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of ground including removing vegetation in equalities not exceeding 15 cm deep and disposal of rubbish lead upto 50 m and lift upto 1.5 m. : Ordinary soil. | 396 | Sqm | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 79.2 | Cu.m | - | - |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 79.2 | Cu.m | - | - |
stage.html
html • 0.02 MB
finance_31355.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_31355.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].