Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.03Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹0.04+₹0.01 (33.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.17+₹1.14 (3800.0%)Admitted-Finance 334 3RD FLOOR SPAZE IT PARK TOWER B 2 SOHNA ROAD SECTOR 49 GURGAON HARYANA 122018 | GURUGRAM | HARYANA | 122018 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical As per Comparative Statement |
| Sl No | Description | Qty | Unit | 5 elements design cell L2 | INGENIOUS STUDIO PRIVATE LIMITED L3 | URBAN WORLD CONSULTING (OPC) PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00Appointment of Third-Party Quality Control agency for Nashik-Trimbakeshwar Simhastha Kumbh Mela 2027 | ||||||
| 1.01 | The Consultancy fee for theme-based beautification and renovation of existing ghats at Nashik -Trimbakeshwar for Simhastha Kumbha 2027 (Package 9) as per the scope of work mentioned in clauses 4, 5, 6, 7. | 1 | Percentage | 0.04 ₹0.04 | 1.17 ₹1.17 | 0.03 ₹0.03 Lowest |
Tender Value
Refer Docs
Closing Date
21 Aug 2026, 4:30 pmClosed
NASHIK TRIMBAK KUMBHMELA AUTHORITY, NASHIK
NASHIK TRIMBAK KUMBHMELA AUTHORITY, NASHIK
Selection of architects/ urban designers for theme-based beautification and renovation of existing ghats in Nashik and Trimbakeshwar for Simhastha Kumbh Mela 2027 for Package 9
2026_UDDMH_1323897_10
003/2026-27/NTKMA
Open Tender
Consultancy
Item Rate
NASHIK DIST
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Exempted
NASHIK TRIMBAK KUMBHMELA AUTHORITY, NASHIK ( ONLIN
12 Oct 2026
3 Aug 2026
24 Aug 2026
3 Aug 2026
21 Aug 2026
3 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appointment of Third-Party Quality Control agency for Nashik-Trimbakeshwar Simhastha Kumbh Mela 2027 | |||||
| 1.01 | The Consultancy fee for theme-based beautification and renovation of existing ghats at Nashik -Trimbakeshwar for Simhastha Kumbha 2027 (Package 9) as per the scope of work mentioned in clauses 4, 5, 6, 7. | - | Percentage | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
RFP_ForP9.pdf
Tender Documents • 2.62 MB
BOQ_2267931.xls
BOQ • 0.30 MB
ARCHITECTUREcorrigendum01.pdf
PDF • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .