Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC 8 2 5 RAVULA RESIDENCY SRINAGAR COLONY MAIN ROAD PUNJAGUTTA HYDERABAD TELANGANA 500082 INDIA | HYDERABAD | TELANGANA | 500082 | ₹1.3 Cr | L1 | Accepted-AOC Lowest Evaluated Bidder (L1) |
| 2 | L2₹2.3 Cr+₹1.1 Cr (83.2%)Rejected-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹2.3 Cr+₹1.1 Cr (83.2%) | L2 | Rejected-Finance More than L1 Quoted rate |
| 3 | L3₹4.6 Cr+₹3.3 Cr (264.7%)Rejected-Finance 403 5TH FLOOR M J TOWERS BANJARA HILS HYDERABAD HYDERABAD TELANGANA 500034 | HYDERABAD | TELANGANA | 500034 | ₹4.6 Cr+₹3.3 Cr (264.7%) | L3 | Rejected-Finance More than L1 Quoted rate |
| Sl No | Description | Qty | Unit | RITES LIMITED L2 | Capital Fortunes Pvt Ltd L3 | Aarvee Engineering Consultants Limited L1 |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of DPR for Extension of Bangalore Metro Rail Corridor from Madavar (BIEC) to Tumkuru for a length of 59.60 Km(approx.) as per Terms of Reference and Scope of work including Altenative Analysis Report, Geo-technical investigations, additional Topo Survey etc. | 59.6 | Km | 3,88,900 ₹2,31,78,440 | 7,74,000 ₹4,61,30,400 | 2,12,224 ₹1,26,48,550.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹4.5 L
Closing Date
20 Nov 2025, 6:55 pmClosed
General Manager (Contracts)
Bangalore Metro Rail Corporation Limited, Annex-1, Project and Planning 4th Floor, BMTC Complex, K H Road, Shantinagar, Bangalore-560027, Karnataka, India
Preparation of Detailed Project Report (DPR) for extension of Metro Rail Corridor from Madavara (BIEC) to Tumakuru for a length of 59.60 Km via Nelamangala, Dabaspete, Kyathasandra of the Bangalore Metro Rail Project.
2025_BMRCL_255701_1
BMRCL/DPR/CONS./2025/142
Limited
Consultancy
Item Rate
150 days
Bangalore
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4.5 L
18 Dec 2025
15 Nov 2025
21 Nov 2025
15 Nov 2025
20 Nov 2025
15 Nov 2025
Amount
Preparation of DPR for Extension of Bangalore Metro Rail Corridor from Madavar (BIEC) to Tumkuru for a length of 59.60 Km(approx.) as per Terms of Reference and Scope of work including Altenative Analysis Report, Geo-technical investigations, additional Topo Survey etc.
RITES LIMITED (BID ID -929037)
Capital Fortunes Pvt Ltd (BID ID -929494)
Bidder Name
RITES LIMITED
Capital Fortunes Pvt Ltd
Aarvee Engineering Consultants Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_294597.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
TumkurDPR1.pdf
Tender Documents • 1.53 MB
BOQ_294597.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .