Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.7 Laccepted-aoc | accepted-aoc |
Tender Value
₹5.9 L
EMD Value
₹14,700
Closing Date
2 Mar 2026, 3:00 pmClosed
SRI BRAMARAMBA MALLIKARJUNA SWAMY DEVASTHANAM, SRISAILAM, KURNOOL DIST
SRISAILAM
Providing Yagasala, Homa Gundam, Steps side retaining wall, scaffolding for Kalasa Prathistha in view of Sri Sri Sri Adisankaracharyulu Swamy & Sarada Ammavari Vigraha Prathistha on dated 08.03.2026
906092
E2/450238/2026
OPEN - NCB
Civil Works
NANDYAL, ANDHRA PRADESH
5 documents required · 5 mandatory
₹208
₹14,700
17 Mar 2026
25 Feb 2026
25 Feb 2026
Earth work excavation for foundations (Mechanical Means) of compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:2:4) using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site including all charges for machine mixing, hire charges of concrete mixer, laying concrete in position, curing etc., complete for finished item of work
Random Rubble stone masonry in CM (1:8) prop: (Cement: Sand) using hard other than granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)
Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement : Sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).
Plastering with cement mortar (1:5) mix, 20 mm thick dubara sponge finished including cost and conveyance of all materials like cement, sand, water etc, to site including seignorage charges, sales and other taxes on all materials and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar finishing curing, including cutting grooves as directed by Engineer – In –Charges etc, complete for finished item of work.
Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)
Cost and supply of casurina posts wieghting & stcoking of materials 5" to 6" center circumference 18" to 15" and 12" Length casurina posts including cost and conveyance of all materials and labour charges and loading, unloading charges etc, complete supply at site
Cost and Supply of Ruvvalu wieghting & Stocking of materials 3" Center circumference 14" length casurina posts including cost and conveyance of all materials and labour charges and loading, unloading charges etc, complete supply at site
Supply and stacking of palamyrah leaves including cost and conveyance of all materials and labour charges etc, complete
Supply and stacking of palamyrah coir ropes including cost and conveyance of all materials and labour charges etc, complete at site
Erection of pendals casurina posts for vertical and horizontals tying with palamyrah coir rope connecting with palamyrah leaves incluidng cost and conveyance of all materials and labor chargesetc, Only but excluding cost of materials etc, complete for labour charges only. Earth work excavation and filling finished item of work (for Constructing temporary yagasala)
Supply of New Tarpaline cloth material to site including all etc, complete for finished item of work (36'0" x 36'0")
Hire Charges for MS pipes Scaffolding- using MS pipes of 40 mm diameter and Special Type Clams(“Nandu “ Clamps) and after completion of work/festival the Scaffolding should be removed carefully . The rate is inclusive of hire charges, conveyance charges of all materials and labour charges for fixing and removal after completion of the work/festival etc., complete . The Scaffolding measurements shall be taken as ‘Length X Average height’( One side of the Scaffolding only)
Providing Thermo Mechanically Treated (TMT) (Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work.( APSS No.126).
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ - Vigraha Pratista at Paladara.xlsx
TENDER_DOCUMENT • 0.02 MB
Bid - Vigraha Pratista at Paladara.docx
TENDER_DOCUMENT • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .