Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -4.86% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹4.3 L (3.53%)Admitted-Finance | -1.50% | ₹1.3 Cr+₹4.3 L (3.53%) | L2 | Admitted-Finance |
| 3 | L2₹1.3 Cr+₹4.3 L (3.53%)Admitted-Finance | -1.50% | ₹1.3 Cr+₹4.3 L (3.53%) | L2 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹3.1 L
Closing Date
15 Apr 2026, 5:00 pmClosed
GM(CIVIL)
MAIN ADMIN BUILDING SECTOR 6 NOIDA
D/O AND M/O VILLAGE (REPAIR AND COVERING OF MAIN DRAIN FROM SUJAN MOD TO PRIMARY SCHOOL TO TCS SIDE 45M WIDE ROAD IN VILLAGE JHATTA) NOIDA
2026_NOIDA_1132301_1
60/GM/SM-WC10/ET/2025-26
Open Tender
Civil Works
Fixed-rate
180 days
NOIDA
REFER TO TENDER DOCUMENT
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.1 L
4 May 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
15 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - |
| - | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | Cum | - | - |
| - | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | - | Cum | - | - |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | - | Cum | - | - |
| - | Dewatering pump 10 HP | - | per hour | 363.55 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | Sqm | 335.55 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access
platform | - | Sqm | 385.68 | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | Cum. | - | - |
| - | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required . In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | Kg | - | - |
| - | 12 mm cement plaster :1:4 (1 cement : 4 coarse sand) including supply all materials, labour and T & P etc. Complete as per direction of Engineer in Charge. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
60TD.pdf
Tender Documents • 2.59 MB
BOQ_2113206.xls
BOQ • 0.26 MB
C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .