| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 CrAccepted-Finance | ₹19.1 Cr | L1 | Accepted-Finance Approved by STC |
| 2 | L2₹18.4 CrRejected-Finance | ₹18.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹21.1 CrRejected-Finance | ₹21.1 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected by STC-TA |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected by STC-TA |
| Sl No | Description | Qty | Unit | Chicago Constructions International Pvt Ltd L3 | ARUN ENGINEERING PROJECTS PRIVATE LIMITED L2 | A AJI L1 |
|---|---|---|---|---|---|---|
| 1.001A-MAINTENANCE OF RAW WATER PUMP HOUSE | ||||||
| 1.00 | OD187955/2025-2026:Design and consultancy charges for raw water pumphouse at Karimpukayam ,including submission of design basis report, approved design document, diagram with levels , strength assessment report of existing structure, Volume calculations for earth work, provide sufficient copies of architectural drawings, structural drawings ,functional drawings ,soft copies and hard copies approved by a structural consultant. This shall be inclusive of soil investigation charges, consultancy services which includes site visit as and when required by engineer in charge | 1 | L.S | 1,17,000 ₹1,17,000 Lowest | 1,50,000 ₹1,50,000 | 1,20,796 ₹1,20,796 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 20.81 | cum | 275 ₹5,723.3 | 260 ₹5,411.12 Lowest | 267.94 ₹5,576.37 |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 12.49 | cum | 550 ₹6,867.85 | 500 ₹6,243.5 Lowest | 538.58 ₹6,725.25 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 45.93 | cum | 3,800 ₹1,74,537.8 | 3,500 ₹1,60,758.5 Lowest | 3,818.74 ₹1,75,398.55 |
| 1.00 | 100.52.S.1:Sub Data for providing Earth filled cement bags including cutting of the Earth, filling, conveying and placing in position. | 945 | each | 120 ₹1,13,400 | 125 ₹1,18,125 | 118.89 ₹1,12,351.05 Lowest |
| 1.01 | OD187957/2025-2026:Constructing ring bund of top width 2.00 m, bottom width 4.00 m and height 3.00 m by using
earth filled cement bag on both faces and filling clay for puddle and for dismantling after
completing work etc. complete | 20 | metre | 30,000 ₹6,00,000 | 10,000 ₹2,00,000 Lowest | 10,128.55 ₹2,02,571 |
| 1.01 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. | 240 | sqm | 950 ₹2,28,000 | 1,000 ₹2,40,000 | 930.71 ₹2,23,370.4 Lowest |
| 1.01 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 2,387.2 | Kwh | 50 ₹1,19,360 | 40 ₹95,488 Lowest | 40.92 ₹97,684.22 |
| 1.01 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.58 | cum | 2,600 ₹1,518.4 | 2,500 ₹1,460 Lowest | 2,617.61 ₹1,528.68 |
Tender Value
₹18.3 Cr
EMD Value
₹5 L
Closing Date
26 Feb 2026, 3:00 pmClosed
Superintending Engineer, PH Circle, Kottayam
Office of the Superintending Engineer, Public Heal
KIIFB-2017 18 KARIMPUKAYAM WATER SUPPLY PROJECT AUGUMENTATION OF ARWSStoKANJIRAPPALLY, ELIKKULAM, CHIRAKKADAVU PANCHAYATHS IN KOTTAYAM DISTRICT. PACKAGEI-ARWSSTO KANJIRAPPALLY, ELIKKULAM, CHIRAKKADAVU PANCHAYATHS IN KOTTAYAM DISTRICT P1-Pipelinework
2025_KWA_819351_1
RC/ WRD/KWA-CE(SR) /TR/1357/2022_26_1_1
Open Tender
Civil Works - Water Works
Item Rate
540 days
Kanjirappally
Please refer Tender documents.
8 documents required · 8 mandatory
₹16,540
₹5 L
Office of the Superintending Engineer, Public Heal
18 Aug 2026
5 Nov 2025
27 Feb 2026
5 Nov 2025
26 Feb 2026
5 Nov 2025
5 Nov 2025 - 10 Nov 2025
10 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11A-MAINTENANCE OF RAW WATER PUMP HOUSE | |||||
| 1.001 | OD187955/2025-2026:Design and consultancy charges for raw water pumphouse at Karimpukayam ,including submission of design basis report, approved design document, diagram with levels , strength assessment report of existing structure, Volume calculations for earth work, provide sufficient copies of architectural drawings, structural drawings ,functional drawings ,soft copies and hard copies approved by a structural consultant. This shall be inclusive of soil investigation charges, consultancy services which includes site visit as and when required by engineer in charge | - | L.S | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | - | cum | - | - |
| 1.004 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.005 | 100.52.S.1:Sub Data for providing Earth filled cement bags including cutting of the Earth, filling, conveying and placing in position. | - | each | - | - |
| 1.006 | OD187957/2025-2026:Constructing ring bund of top width 2.00 m, bottom width 4.00 m and height 3.00 m by using
earth filled cement bag on both faces and filling clay for puddle and for dismantling after
completing work etc. complete | - | metre | - | - |
| 1.007 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. | - | sqm | - | - |
| 1.008 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 1 | Kwh | - | - |
| 1.009 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_1373402.xls
BOQ • 0.68 MB
AnnexureII.pdf
Other Document • 1.41 MB
Q1Q8.xls
Other Document • 0.12 MB
GOsandForms.pdf
Additional Documents • 5.84 MB
NITCORRECTED.pdf
Tender Documents • 2.68 MB
DATEEXTENDEDCORRIGENDUM8.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].