| 1 | 1₹45.1 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹45.2 L+₹16,641 (0.37%)Rejected-Finance KRISHNAPURI NEAR ROADWAYS BUS STATION PITHORAGARH UTTARAKHAND | PITHORAGARH | PITHORAGARH | UTTARAKHAND | 262501 | 2 | Rejected-Finance L2 |
Tender Value
₹45 L
EMD Value
₹92,000
Closing Date
27 Jul 2019, 5:00 pmClosed
Office of EE UKPJN Pithoragarh
Office of EE UKPJN Pithoragarh
Dobans water supply scheme
2019_MDPEY_18642_2
Letter No. 1671 / Nivida / 96 Dated 26.06.2019
Open Tender
Civil Works - Water Works
Item Rate
540 days
Pithoragarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
Office of EE UKPJN Pithoragarh
₹92,000
Office of EE UKPJN Pithoragarh
14 Jan 2020
18 Jul 2019
30 Jul 2019
19 Jul 2019
27 Jul 2019
21 Jul 2019
20 Jul 2019
Amount
Excavation of pipe line trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and 15% will be in ordinary rock.
Soil mixed with Boulder
Ordinary Rock
Supply of all materials, labours & T&P etc and construct Intake Chamber works as per type design and drawings complete.
Supply of all materials, labours & T&P etc and construct French well works as per type design and drawings complete.
Providing, carting, laying & jointing of following sizes of Pipes including all fittings, specials, bending, cutting & threading as required for proper completion of work.G.I. pipes as per IS: 1239/ 1985 Part-I
15mm dia nominal bore
20mm dia nominal bore
25mm dia nominal bore
Supply of all materials, labour T&P etc complete to construct 05 KL CWR as per design and drawing includung all pipes & fittings complete.
Supply of all materials, labour T&P etc complete to construct 7.50 KL CWR as per design and drawing includung all pipes & fittings complete.
Supply & fixing of chlorinating arrangement of 25 litre capacity over CWR roof slab. Including supply of all materials & labours as per type design & drawing complete.
Supply of all materials, labours, T&P. etc.and construct Gate valve chamber as per type design complete.
Supply and fixing of the following fittings including cartage of materials, labours, T&P etc complete. Providing & fixing of Gate valves (Class-I) as per IS: 789/1997
20mm dia
25mm dia
Supply of all materials, labours, T&P etc and construct pillar type stand post as per type design complete.
Provision for Protection works including all materials, T&P, labour complete as per the direction of Engineer in charge R.R. 1:6 stone masonry.
Laid R.R. dry
Supply of labour, T&P etc for P:C:C: 1:4:8(1 cement:4 fine sand:8 graded stone aggregate 40 mm nominal size) required for proper completion of work as per instruction of Engineer in charge.
Supply of labour, T&P etc for P:C:C: 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) required for proper completion of work as per instruction of Engineer in charge.
soar valley construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .