| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹27.2 L (23.6%)Admitted-Finance | ₹1.4 Cr+₹27.2 L (23.6%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹55.3 L (48.1%)Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | ₹1.7 Cr+₹55.3 L (48.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 11 RK INDUSTRY HOUSE 11 R K INDUSTRY WALBHAT ROAD WALBHOT ROAD GOREGAON EAST MUMBAI MAHARASHTRA 400063 | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | - | - | Rejected-Technical AS PER RFP |
| 5 | Rejected-Technical | - | - | Rejected-Technical AS PER RFP |
| Sl No | Description | Qty | Unit | H and H Precision Private Limited L1 | YEOMAN MARINE SERVICES PVT. LTD. L3 | Aero Marine Services L2 |
|---|---|---|---|---|---|---|
| 1.00 | Service - Degutting of the following-
(a) Operator Console in SCR (Wt - 260 kg)
(b) Signal Processing Cabinet in ATAS Control Post (Wt - 290 kg)
(c) Winch Control Panel in Quarter Deck (Wt - 520 kg) | 3 | NOS | 40,348 ₹1,21,044 Lowest | 54,000 ₹1,62,000 | 45,000 ₹1,35,000 |
| 2.00 | Service - Degutting of the following-
(a) Power Amplifier Cabinet in ATAS Control Post (Wt - 640 kg)
(b) Pulse Power Supply Unit in ATAS Control Post (Wt - 719 kg)
(c) Towed Body Unit in Quarter Deck (Wt - 1250 kg)
(d) Degutting of Winch 1 in Quarter Deck (Wt - 5000 kg)
(e) Degutting of Winch 2 in Quarter Deck (Wt - 1800 kg)
(f) Over Boarding Unit in Quarter Deck (Wt - 8500 kg) | 6 | NOS | 1,15,280 ₹6,91,680 Lowest | 1,65,000 ₹9,90,000 | 1,40,000 ₹8,40,000 |
| 3.00 | Service - Degutting of the following-
(a) Chute in Quarter Deck (Wt - 65 kg)
(b) Support in Quarter Deck (Wt - 25 kg)
(c) Remote Control Unit in Quarter Deck and Ops room (Wt - 10 kg)
(d) 4.1 T AC pack in Quarter Deck (Wt - 50 kg)
(e) 7.5 T Chiller Plant in ATAS Control Post (Wt - 75 kg)
(f) HCOS/ACOS and DBs in ATAS Control Post (Wt - 25 kg) Qty 03
(g) Operator Console in SCR
(h) SPC, PAC, PPS, Transformer and 7.5 T Chiller Plant in ATAS Control Post(Qty -05) | 14 | NOS | 28,820 ₹4,03,480 Lowest | 35,000 ₹4,90,000 | 32,000 ₹4,48,000 |
| 4.00 | Service - Degutting of foundations of Towed Body, Winch 1, Winch 2, OBU, WCP, Chute, Support, RCUs, Operator Panel and 4.1 T AC pack in Quarterdeck | 1 | JOB | 92,224 ₹92,224 Lowest | 1,05,000 ₹1,05,000 | 95,000 ₹95,000 |
| 5.00 | Service - Delagging of area to make access for shifting of equipment in Mess No 2, SCR, Ops Room, Bridge, Passwage ways 11 to 14, Post 38, ASP, Duty Crew Room, ATAS Control Post and Quarter Deck. Delagging of chilled water pipeline | 850 | M2 | 343 ₹2,91,550 Lowest | 500 ₹4,25,000 | 450 ₹3,82,500 |
| 6.00 | Service - Relagging of area post for shifting of equipment in Mess No 2, SCR, Ops Room, Bridge, Passwage ways 11 to 14, Post 38, ASP, Duty Crew Room, ATAS Control Post and Quarter Deck | 800 | M2 | 748 ₹5,98,400 Lowest | 900 ₹7,20,000 | 860 ₹6,88,000 |
| 7.00 | Service - Provision of lifting hooks, slings and lifting gears for shifting of 16 equipment form Ship to Jetty and unloading in Shop Floor. | 1 | JOB | 5,764 ₹5,764 Lowest | 7,500 ₹7,500 | 6,500 ₹6,500 |
| 8.00 | Service - Provision of transport for shifting of equipment and cables from Ship to Shop Floor | 1 | JOB | 28,820 ₹28,820 Lowest | 35,000 ₹35,000 | 30,000 ₹30,000 |
| 9.00 | Service - Provision of lifting hooks, slings, lifting gears and transport for shifting of 16 ATAS equipment from Shop Floor to WED/ Mankhurd. | 1 | JOB | 69,168 ₹69,168 Lowest | 80,000 ₹80,000 | 72,000 ₹72,000 |
| 10.00 | Service - Removal of panelling in area to make access for shifting of equipment and removal of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm) | 1 | JOB | 13,833 ₹13,833 Lowest | 18,000 ₹18,000 | 14,500 ₹14,500 |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
12 Oct 2020, 2:30 pmClosed
DGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
INSTALLATION OF REMOVAL OF ATAS SYSTEM ONBOARD INS MYSORE AND INSTALLATION ONBOARD INS DELHI
2020_NAVY_383179_1
DYT/WPM/20-21/106(A)/PL-IN /INS SHIPS-ATAS/168
Open Tender
Miscellaneous Services
Item Rate
240 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.9 L
Yes
NAVAL DOCKYARD MUMBAI
17 Oct 2020
3 Oct 2020
13 Oct 2020
3 Oct 2020
12 Oct 2020
6 Oct 2020
6 Oct 2020
Amount
Service - Degutting of the following- (a) Operator Console in SCR (Wt - 260 kg) (b) Signal Processing Cabinet in ATAS Control Post (Wt - 290 kg) (c) Winch Control Panel in Quarter Deck (Wt - 520 kg)
Service - Degutting of the following- (a) Power Amplifier Cabinet in ATAS Control Post (Wt - 640 kg) (b) Pulse Power Supply Unit in ATAS Control Post (Wt - 719 kg) (c) Towed Body Unit in Quarter Deck (Wt - 1250 kg) (d) Degutting of Winch 1 in Quarter Deck (Wt - 5000 kg) (e) Degutting of Winch 2 in Quarter Deck (Wt - 1800 kg) (f) Over Boarding Unit in Quarter Deck (Wt - 8500 kg)
Service - Degutting of the following- (a) Chute in Quarter Deck (Wt - 65 kg) (b) Support in Quarter Deck (Wt - 25 kg) (c) Remote Control Unit in Quarter Deck and Ops room (Wt - 10 kg) (d) 4.1 T AC pack in Quarter Deck (Wt - 50 kg) (e) 7.5 T Chiller Plant in ATAS Control Post (Wt - 75 kg) (f) HCOS/ACOS and DBs in ATAS Control Post (Wt - 25 kg) Qty 03 (g) Operator Console in SCR (h) SPC, PAC, PPS, Transformer and 7.5 T Chiller Plant in ATAS Control Post(Qty -05)
Service - Degutting of foundations of Towed Body, Winch 1, Winch 2, OBU, WCP, Chute, Support, RCUs, Operator Panel and 4.1 T AC pack in Quarterdeck
Service - Delagging of area to make access for shifting of equipment in Mess No 2, SCR, Ops Room, Bridge, Passwage ways 11 to 14, Post 38, ASP, Duty Crew Room, ATAS Control Post and Quarter Deck. Delagging of chilled water pipeline
Service - Relagging of area post for shifting of equipment in Mess No 2, SCR, Ops Room, Bridge, Passwage ways 11 to 14, Post 38, ASP, Duty Crew Room, ATAS Control Post and Quarter Deck
Service - Provision of lifting hooks, slings and lifting gears for shifting of 16 equipment form Ship to Jetty and unloading in Shop Floor.
Service - Provision of transport for shifting of equipment and cables from Ship to Shop Floor
Service - Provision of lifting hooks, slings, lifting gears and transport for shifting of 16 ATAS equipment from Shop Floor to WED/ Mankhurd.
Service - Removal of panelling in area to make access for shifting of equipment and removal of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm)
Service - Reinstallation of panelling in area post shifting of equipment and removal of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm)
Material - Manufacturing of panels for restoration of panelling post shifting of equipment and removal of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm)
Service - Breaking of Cable Glands for removal of ATAS Cables and sealing of glands post opening and removal of cables.(Location Quarterdeck, ATAS Control Post, Air Lock13, Passageway 23, Passageway 22, Passageway 21, Passageway 20, SSHD Lobby, Passageway 18, AC Tool Control Room, Air Lock8, Passageway 16A, Passageway 14/15, Passageway 13, Passageway 12, Ops Room, SCR, Admiral Cabin Lobby, Bridge, Passageway 17, AFT SWBD Room, FWD SWBD Room, Passageway 17, Lobby 15, Passageway 11, Post 01 Lobby and Bridge Lobby) Material if any - Glands/Sealing Compound for sealing of gland to be catered by vendor (material SS).
Services :Provisioning of all tools, equipment, slings, vehicles or any other item required for undertaking the above mentioned work
Service - Disconnection of electrical cables, ethernet cables and optical fiber cables of ATAS system. Removal of electrical, ethernet and fiber optic cables of ATAS System from ATAS Control Post, Quarter Deck, SCR and Passageways (Without damaging) including removal of cable hangers / cable trays of electrical and optical fiber cables of ATAS System
Service - Removal of air trunking as per modification.
Service - Removal/ Modification of pipelines/ Flexible hoses associated with the system of various diameter including blanking of lines if required.
Service - Installation of the following (a) Operator Console in SCR (Wt - 260 kg) (b) Signal Processing Cabinet in ATAS Control Post (Wt - 290 kg) (c) Power Amplifier Cabinet in ATAS Control Post (Wt - 640 kg) (d) Pulse Power Supply Unit in ATAS Control Post (Wt - 719 kg) (e) Transformer in ATAS Control Post (Wt - 88 kg)
Service - Installation of (a) Towed Body Unit in Quarter Deck (Wt - 1250 kg) (c) Winch 2 in Quarter Deck (Wt - 1800 kg) (d) Winch Control Panel in Quarter Deck (Wt - 520 kg)
Service - Installation of (a) Over Boarding Unit in Quarter Deck (Wt - 8500 kg) (b) Winch 1 in Quarter Deck (Wt - 5000 kg)
Service - Installation of (a) Chute in Quarter Deck (Wt - 65 kg) (b) Support in Quarter Deck (Wt - 25 kg) (c) Remote Control Unit in Quarter Deck and Ops room (Wt - 10 kg) (d) Operator Panel in Quarter Deck (Wt - 10 kg) (e) 4.1 T AC pack in Quarter Deck (Wt - 50 kg) (f) 7.5 T Chiller Plant in ATAS Control Post (Wt - 50 kg)
Service - Removal of panelling in area to make access for shifting of equipment and laying of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm)
Service - Reinstallation of panelling in area post shifting of equipment and laying of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm)
Material - Manufacturing of panels for restoration of panelling in area post shifting of equipment and laying of cables in Mess No 2 (4000mm x 2000mm) and SCR (4000mm x 2000mm)
Service - Delagging of area to make access for shifting of equipment and laying of cables in Mess No 2, SCR, Ops Room, Bridge, Passwage ways 11 to 14, Post 38, ASP, Duty Crew Room and Quarter Deck
Service - Relagging of area post shifting of equipment and cables in Mess No 2, SCR, Ops Room, Bridge, Passwage ways 11 to 14, Post 38, ASP, Duty Crew Room and Quarter Deck
Service - Transportation and shifting of all cables from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Operator Console in SCR (Wt - 260 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Signal Processing Cabinet in ATAS Control Post (Wt - 290 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Power Amplifier Cabinet in ATAS Control Post (Wt - 640 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Pulse Power Supply Unit in ATAS Control Post (Wt - 719 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Transformer in ATAS Control Post (Wt - 88 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Towed Body Unit in Quarter Deck (Wt - 1250 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Winch 1 in Quarter Deck (Wt - 5000 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Winch 2 in Quarter Deck (Wt - 1800 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Over Boarding Unit in Quarter Deck (Wt - 8500 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of Winch Control Panel in Quarter Deck (Wt - 520 kg) from Jetty / Shop Floor to Ship
Service - Transportation and shifting of following from Jetty / Shop Floor to Ship (a) Chute in Quarter Deck (Wt - 65 kg) from (b) Support in Quarter Deck (Wt - 25 kg) (c) Remote Control Unit in Quarter Deck and Ops room Wt - 10 kg) (d) 4.1 T AC pack in Quarter Deck (Wt - 50 kg) (e) 7.5 T Chiller Plant in ATAS Control Post (Wt - 75 kg) (f) ACOS/HCOS and DBs in ATAS Control Post (Wt - 25 kg) Qty 03
Service - Surface preparation, machining and strengthening of base in Quarter Deck, ASP and Reel compt.
Service - Surface prepration of new foundations for installation of Operator Console in SCR
Service - Surface prepration of new foundations for installation of SPC, PAC, PPS, Transformer and 7.5 T Chiller Plant in ATAS Control Post
Service - Surface prepration of new foundations for installation of OBU in the well including foundation pads as per drawings & specification in Quarterdeck
Service - Surface prepration of new foundations for installation of Towed Body, Winch 1, Winch 2, WCP, Chute, Support, RCUs, Operator Panel and 4.1 T AC pack in Quarterdeck
Service - Insitu boring of new foundations for installation of Operator Console in SCR
Service - Insitu boring of new foundations for installation of SPC, PAC, PPS, Transformer and 7.5 T Chiller Plant in ATAS Control Post
Service - Insitu boring of new foundations for installation of OBU in the well including foundation pads as per drawings & specification in Quarterdeck
Service - Insitu boring of new foundations for installation of Towed Body, Winch 1, Winch 2, WCP, Chute, Support, RCUs, Operator Panel and 4.1 T AC pack in Quarterdeck
Service - Removal and reinstallation of electrical cables in Mess No 2, SCR, Ops Room, Bridge, Passwage ways, Post 38, ASP, Duty Crew Room and Quarter Deck post installation of ATAS equipment
Service - Removal of in way electrical equipment like starter, control panel, junction box & light fittings etc in Mess No 2, SCR, Ops Room, Bridge, Passwage ways, Post 38, ASP, Duty Crew Room and Quarter Deck post installation of ATAS equipment
Service - Reinstallation of in way electrical equipment like starter, control panel, junction box & light fittings etc in Mess No 2, SCR, Ops Room, Bridge, Passwage ways, Post 38, ASP, Duty Crew Room and Quarter Deck post installation of ATAS equipment
Material - Manufacture of new foundations for reinstallation of inway electrical equipment like starter, control panel, junction box & light fittings etc in Mess No 2, SCR, Ops Room, Bridge, Passwage ways, Post 38, ASP, Duty Crew Room
Service - Laying of ATAS Cables through cable trays and cable hanger in Quarterdeck, ATAS Control Post, Air Lock13, Passageway 23, Passageway 22, Passageway 21, Passageway 20, SSHD Lobby, Passageway 18, AC Tool Control Room, Air Lock8, Passageway 16A, Passageway 14/15, Passageway 13, Passageway 12, Ops Room, SCR, Admiral Cabin Lobby, Bridge, Passageway 17, AFT SWBD Room, FWD SWBD Room, Passageway 17, Lobby 15, Passageway 11, Post 01 Lobby and Bridge Lobby All cable trays , cable hangers and installation to be catered by vendor. Cable Tray 500 Mtrs Cable Hangers 120 to be catered by vendor.
Services :Manufacturing and fitment of clamps for mounting of the channel trays and bulkhead mounted devices, as required
Service - Installation of bulkhead cable glands for laying of ATAS cables, The gland to be repacked post laying of cables and pressure tested
Service - Installation cable tallies, equipment tallies and bulkhead talles on all ATAS cables and equipment. 6x3x0.5cm - Aluminium (punched)
Service - Manufacturing of new foundation as per drawing for installation of 4.1 T AC Plant in Quarterdeck and 7.5 T Chiller plant in ATAS Control Post
Material - Manufacturing of new foundation as per drawing for installation of 4.1 T AC Plant in Quarterdeck and 7.5 T Chiller plant in ATAS Control Post
Service - Installation and surface preparation of foundations of 4.1 T AC Plant in Quarterdeck and 7.5 T Chiller plant in ATAS Control Post per drawings & specification.
Service - Insitu boring, reaming and drilling of new foundation holes for fitment of 4.1 T AC Plant in Quarterdeck and 7.5 T Chiller plant in ATAS Control Post per drawings & specification.
Service - Installation and surface preparation of foundations of Operator Consore in SCR per drawings & specification.
Service - Insitu boring, reaming and drilling of new foundation holes for fitment of Operatoo Consore in SCR per drawings & specification.
Service - Installation and surface preparation of foundations of Pulse Amplifier Cabinet, Pulse Power Supply, Signal Processing Cabinet and Transformer in ATAS Control Post per drawings & specification.
Service - Insitu boring, reaming and drilling of new foundation holes for fitment of Pulse Amplifier Cabinet, Pulse Power Supply, Signal Processing Cabinet and Transformer in ATAS Control Post per drawings & specification.
Service - Installation and surface preparation of foundations of Winch1, Winch2, Towed Body, OBU and Winch Control Unit including foundation pads as per drawings & specification in Quarterdeck.
Service -Insitu boring, reaming and drilling of new foundation holes for fitment of Winch1, Winch2, Towed Body, OBU and Winch Control Unit including foundation pads as per drawings & specification in Quarterdeck
Service - Manufacturing of new foundation as per drawing.for installation of Winch Control Unit in Quarterdeck and ACOS/HCOS & DBs in ATAS Control Post
Material - Manufacturing of new foundation as per drawing.for installation of Winch Control Unit in Quarterdeck and ACOS/HCOS & DBs in ATAS Control Post
Service - Installation of chilled water pipelines (Cu Ni) of 32 mm, 20 mm 18 mm dia and flexible hose of chilled water system including manufacturing and installation of end fittings for the pipelines and hoses. Cold lagging to be carried out. All material to be catered by vendor.
Service - Installation of fresh water pipelines (Cu Ni), including manufacturing and installation of end fittings for the pipelines and hoses.All material to be catered by vendor.
Service - Removal of HE (Heat exchanger) from present location in Reel compt.
Service - Removal of fan motor for HE in Reel compt.
Service - Re-fitment of HE and Fan motor at new location with overhead foundation in Reel compt.
Service - Removal of air trunking as per modification in ASP and Reel Compt
Service - Manufacture and re-installation of air trunking as per modification in ASP and Reel Compt. Material to be catered by vendor.
Service - Rerouting of chilled water line and air trucking and Connectorisation with HE. Reel compartment, Post 38 , Duty Crew room and quarter deck
Service - Installation of ventilation motor fan along with trunking in Reel compt
Service - Removal of in way equipment like, greasing guns, ducting, air pipes, tool rack, OXT(chemical line), fire box, prewetting system in Mess No 2, SCR, Ops Room, Bridge, Passwage ways, Post 38, ASP, Duty Crew Room
Service - Re-fitment of in way equipment like, greasing gun, ducting, air pipes, tool rack, OXT(chemical line), fire box, prewetting system in Mess No 2, SCR, Ops Room, Bridge, Passwage ways, Post 38, ASP, Duty Crew Room
Service - Modification of fireman line and cooling water line in ASP including Manufactruing of end fittings for connections of cooling water pipelines to HE
Service - Pneumatic system pipes to be modified in Quarter Deck, ASP and Reel compt
Service - Removal of RBR locker, repeater of Gyro and Log as per drawing
Material - Manufacturing of new foundation of RBR locker, repeater of Gyro and Log
Service - Surface preparation, machining & fitment of foundation of RBR locker, Gyro repeater & log repeater, (Dimension as per drawing
Service - Insitu boring of new foundation holes as per the specification/ drawing for fitment of RBR, Gyro and log repeater
Service - Reinstallation of RBR locker, repeater of Gyro and Log as per drawing
Service - Termination of all unused cables and grounding both ends
Service-Modification existing ventilation trunking system feeding the new cabinets at all locations
Aero Marine Services
YEOMAN MARINE SERVICES PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .