| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹15,310.51 (0.15%)Rejected-AOC | ₹1.0 Cr+₹15,310.51 (0.15%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 Cr+₹16,903.58 (0.16%)Rejected-AOC | ₹1.1 Cr+₹16,903.58 (0.16%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.1 Cr+₹21,648.56 (0.21%)Rejected-AOC | ₹1.1 Cr+₹21,648.56 (0.21%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | krishna nand L3 | Umesh Kharkwal L2 | Prakash Chandra Pandey L1 | GANGA PRASAD PUNETHA L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m | 877.04 | Sq M | 30 ₹26,311.2 Lowest | 34.15 ₹29,950.92 | 34.15 ₹29,950.92 | 34.15 ₹29,950.92 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 263.12 | Cu M | 255 ₹67,095.6 Lowest | 260.3 ₹68,490.14 | 260.3 ₹68,490.14 | 260.3 ₹68,490.14 |
| 3.00 | Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating Each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 126 | Cu M | 194 ₹24,444 Lowest | 196 ₹24,696 | 196 ₹24,696 | 196 ₹24,696 |
| 4.00 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. | 9.91 | Cu M | 308.2 ₹3,054.26 Lowest | 308.2 ₹3,054.26 Lowest | 308.2 ₹3,054.26 Lowest | 308.2 ₹3,054.26 Lowest |
| 5.00 | Supplying and filling in plinth with sand under Floors, including watering, ramming, consolidating and dressing complete. | 12.61 | Cu M | 2,123.75 ₹26,780.49 Lowest | 2,123.75 ₹26,780.49 Lowest | 2,123.75 ₹26,780.49 Lowest | 2,123.75 ₹26,780.49 Lowest |
| 6.00 | 3 Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos / Lindane E.C. 20% with 1% concentration | 126.09 | Sq M | 310.05 ₹39,094.2 Lowest | 310.05 ₹39,094.2 Lowest | 310.05 ₹39,094.2 Lowest | 310.05 ₹39,094.2 Lowest |
| 7.00 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 78.38 | Sq M | 749.3 ₹58,730.13 Lowest | 749.3 ₹58,730.13 Lowest | 749.3 ₹58,730.13 Lowest | 749.3 ₹58,730.13 Lowest |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : - 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mmnominal size) | 48.06 | Cu M | 6,812 ₹3,27,384.72 Lowest | 6,812 ₹3,27,384.72 Lowest | 6,812 ₹3,27,384.72 Lowest | 6,812 ₹3,27,384.72 Lowest |
| 9.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 11.22 | Cu M | 7,132.25 ₹80,023.85 Lowest | 7,132.25 ₹80,023.85 Lowest | 7,132.25 ₹80,023.85 Lowest | 7,132.25 ₹80,023.85 Lowest |
| 10.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level.Concrete of M25 grade with minimum cement content of 330 kg /cum | 35.25 | Cu M | 9,504.75 ₹3,35,042.44 Lowest | 9,504.75 ₹3,35,042.44 Lowest | 9,504.75 ₹3,35,042.44 Lowest | 9,504.75 ₹3,35,042.44 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
14 Oct 2025, 1:00 pmClosed
EO Nagar Palika Parishad Champawat
Nagar Palika Parishad Champawat
Development of Cremitaion Ground, Champawat, Uttarakhand
2025_NPPC_87635_1
334-24/09/2025
Open Tender
Civil Works
Item Rate
Champawat
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EO Nagar Palika Parishad
₹2.1 L
31 Jan 2026
27 Sept 2025
14 Oct 2025
27 Sept 2025
14 Oct 2025
27 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .