| 1 | L1₹34.2 LAccepted-AOC | ₹34.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹37.9 L+₹3.7 L (10.8%)Rejected-Finance | ₹37.9 L+₹3.7 L (10.8%) | L2 | Rejected-Finance L2 |
| 3 | L3₹40.2 L+₹6.0 L (17.5%)Rejected-Finance | ₹40.2 L+₹6.0 L (17.5%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | K.T. DEVASIA L1 | sreejith m.p L3 | Nithinsankar.C.P L2 |
|---|---|---|---|---|---|---|
| 1.00CHAINAGE 0-110m | ||||||
| 1.00 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 930 | cum | 2,318.84 ₹21,56,521.2 Lowest | 2,700 ₹25,11,000 | 2,600 ₹24,18,000 |
| 1.00 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | 930 | cum | 765.45 ₹7,11,868.5 | 850 ₹7,90,500 | 750 ₹6,97,500 Lowest |
| 1.00 | OD22867/2024-2025:Packing the exposed face of the rubble mount with selected stones of size 40dm3 for
a thickness of 30cm as per the direction of departmental officers at site | 39.6 | cum | 422.24 ₹16,720.7 Lowest | 4,300 ₹1,70,280 | 4,000 ₹1,58,400 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 115.5 | cum | 4,021.68 ₹4,64,504.04 | 4,100 ₹4,73,550 | 3,900 ₹4,50,450 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 22.1 | sqm | 768.26 ₹16,978.55 | 850 ₹18,785 | 700 ₹15,470 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.5 | cum | 9,301.23 ₹51,156.77 | 9,500 ₹52,250 | 8,700 ₹47,850 Lowest |
Tender Value
₹31.7 L
EMD Value
₹50,000
Closing Date
15 May 2026, 6:00 pmClosed
ExecutiveEngineer, Irrigation Division, Kozhikode
Office of the Executive Engineer, Irrigation Division,Civil Station, Kozhikode- 673020
GENERAL-Mahe River Protection works- Protecting the left bank of Mahe river U/S side of Pakkoy bridge in ward No.17 in Narippatta Panchayat / Nadapuram LA-General Civil Work
2026_Irrig_849859_1
EEIK/ET-07/2026-27
Open Tender
Civil Works - Others
Item Rate
270 days
Naripatta Panchayath
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
27 Jul 2026
8 May 2026
18 May 2026
8 May 2026
15 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CHAINAGE 0-110m | |||||
| 1.001 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
| 1.002 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
| 1.003 | OD22867/2024-2025:Packing the exposed face of the rubble mount with selected stones of size 40dm3 for
a thickness of 30cm as per the direction of departmental officers at site | - | cum | - | - |
| 1.004 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1436027.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.06 MB
BOQ_1436027.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .