Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹35.9 LAccepted-AOC H NO 30 SECTOR 17 PANCHKULA 2022R6473 | PANCHKULA | PANCHKULA | HARYANA | 2022 | L 1 | Accepted-AOC 1st Lowest | |
| 2 | L 2₹42 L+₹6.1 L (17.0%)Rejected-AOC | L 2 | Rejected-AOC 2nd Lowest | |
| 3 | Not Admitted-Fee/PreQual/Technical H NO 2603 GH 4A JALVAYU VIHAR SECTOR 20 PANCHKULA 134116 | PANCHKULA | PANCHKULA | HARYANA | 134116 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
18 Oct 2021, 3:00 pmClosed
Executive Engineer HSVP Div no 1 Sec 8 Panchkula
Executive Engineer HSVP Div no 1 Sec 8 Panchkula
Running, Operation and Maintenance of 2ND Unit of 39 MLD STP of Sewage Treatment Plant in Sec 20 Panchkula including repair spare parts etc complete in all respect for period of 8 Months
2021_HBC_189347_1
HSVP/DIV-I/2021-2022/98
Open Tender
Civil Works
Works
242 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹74,000
Yes
3 Jun 2022
22 Sept 2021
19 Oct 2021
22 Sept 2021
18 Oct 2021
22 Sept 2021
Amount
N.S Item:- Operation, running and maintenance of 39 MLD STP at Sector 20, Panchkula Parts etc. complete in all respects to the entire satisfaction of Engineer-in-charge including cost of; i) Staff to be provided for operation & running of STP as per detail enclosed in the DNIT & as per satisfaction of the Engineer-in-charge. ii) Mtc. / running of machinery & civil works including repair & spares mentioned in the DNIT and as per satisfaction of the EIC. iii) Operation & mtc. of online monitoring devices such as flow meter, SCADA system and digital CCTV cameras installed at STP Sector 20 Panchkula complete in all respect. iv) The parameters of treated water should be maintained by the contractor as per latest prescribed parameters time to time given by HSPCB / CPCB v) The liability for online reading shown on the software of HSPCB / CPCB in the part on the contractor. It will be checked on daily routine by the contractor. Note : - All the works of maintenance / repair & spares works of STP campus sector 20 Panchkula which are not covered in the DNIT will be liability of the contractor.
Rehman Builders Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .