Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.2 L+₹73,377 (9.89%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | L3₹8.6 L+₹1.2 L (16.0%)Rejected-Finance | L3 | Rejected-Finance THIRD LOWEST | |
| 4 | L4₹9.4 L+₹2.0 L (26.9%)Rejected-Finance 3 333 F M P ARCS VENGACHUVADU VAZHAKKULAM P O CHAITHANYA BUILDING SA ROAD KADAVATHRA MUVATTUPUZHA ERNAKULAM 686670 | MUVATTUPUZHA | ERNAKULAM | KERALA | 686670 | L4 | Rejected-Finance HIGHEST |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
15 Nov 2022, 4:00 pmClosed
DIRECTOR CSIR-NIIST
N.CHANDRA SHEKAR ESD-ELECTRICAL SECTION EXECUTIVE ENGINEER
NIIST/65/ESD-E/NIT/AC/2022-23
2022_CSIR_134909_1
NIIST/65/ESD-E/NIT/AC/2022-23
Open Tender
Electrical Works
Item Rate
60 days
CSIR-NIIST, TVM
SEE NIT
10 documents required · 10 mandatory
₹0
₹18,000
26 Dec 2022
9 Nov 2022
16 Nov 2022
9 Nov 2022
15 Nov 2022
9 Nov 2022
9 Nov 2022 - 15 Nov 2022
Amount
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF SPLITS Ac's - CV RAMAN BLOCK
Supply ,Installation& Commissioning of at least 3 Star rated non inverted Hi Wall Mounted Split Air conditioners with R32 or R410a Refrigerants (the unit should have capable to take of at least 20 RMT horizontal Length of copper tubing )as per Engineer In charge Instruction. Make : Mitsubishi, Daikin, Hitachi
Supply & laying of insulated Copper tubes for the Above Air conditioners size as per a manufacturer standard as per Engineer In charge Instruction.
a) for 1.5TR
b) for 2 TR
Electrical Cabling of the Above air conditioners ( Between IDU & ODU) size of the cable : 4 core 2.5 sqmm cu flexible cable
4 core 4 sqmm cu flexible cable
1.inch Drain pipe line with Insulation
ODU Stands(Pedestal Type Stands (not ready made ) to accommodate condensing units - fabricated by GI Tubes & painted as per Engineer In charge Instructions
SUPPLY INSTALLATION TESTING AND COMMISSIONING of : Non-Inverted Ductable Split Air conditioners - IT Server Room
Supply ,Installation& Commissioning of non-inverted Ductable Split Air conditioners of 3 TR capacity with R410 gas.Make : Daikin/Mitsubishi/Hitachi Toshiba /Carrier/Bluestar
Supply & laying of insulated Copper tubes for the Above Air conditioners size as per manufacturer standard
Electrical Cabling of the Above air conditioners ( Between IDU & ODU) size of the cable : 4 core 4 sqmm cu flexible cable
Supply & fixing of Twin Ac control Timer for Integrating the above units with control box Including Wiring
Supply and fixing of Ac outdoor stand ODU Stands (not ready made to accommodate condensing units - fabricated by GI Tubes /Angle Iron & painted as per Engineer In charge Instructions)
Supply & laying of drain line piping of 1.25 inch PVC with insulation
SUPPLY AND FIXING POWER SOCKETS, SWITCH BOARDS,ENCLOUSERS
Supplying and fixing suitable size GI/PVC box with modular plate and cover in front on surface or in recess, including providing and fixing 6 pin5/6A & 15/16 A modular socket outlet and 15/16A modular switch, connections etc. as required.
Wiring for circuit/submain wiring alongwith earth wire with the following sizes of FLRS PVC insulated copper conductor , single core cable in surface / recessed medium class PVC conduit as required.2 X 2.5 sq.mm + 1 X 2.5 sq.mm earth wire
Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32 A 240 V "C" curve DP MCB complete with connections, testing and commissioning etc. as required.
Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single core cable insurface/recessedmedium class PVCconduitalongwith1No4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing asrequired.
SUPPLY OF FOLLOWING ITEMS
Supply OF Surround Bladeless Tower Fan with Knob Control : Air Volume (m3/hr) 650 Wattage 230V / 50 Hz Air Volume (CFM): 383 ,MODEL Symphony Surround – i Bladeless Tower Fan (OR) Any other suitable equivalent make
Supply OF Series 41 Manifolds With 2-1/2′′ Gauges, for Flutterless technology means surge protector and silicone dampened movement helps minimize needle pulsation for easier, more accurate readings. Model : YELLOW JACKET
BS Engineering
One Dial Facility Management Servicees
LINSTA SERVICES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .