Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-Finance BAHIRTAFA JADURBERIA ULUBERIA HOWRAH 711316 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹24.9 L+₹19,800.46 (0.80%)Rejected-Finance BAZAR PARA NEAR STADIUM P O ULUBERIA HOWRAH | ULUBERIA | HOWRAH | WEST BENGAL | L2 | Rejected-Finance Rejected | |
| 3 | L3₹25.1 L+₹31,185.73 (1.26%)Rejected-Finance VILL P O DONGARIA P S NODAKHALI DIST SOUTH 24 PGS PIN 743318 | DONGARIA | SOUTH 24 PARGANAS | WEST BENGAL | 743318 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹25.1 L+₹36,878.36 (1.49%)Rejected-Finance 584 543 EAST BURIKHALI BAURIA HOWRAH 711310 | BAURIA | HOWRAH | WEST BENGAL | 711310 | L4 | Rejected-Finance Rejected | |
| 5 | L5₹25.3 L+₹55,193.79 (2.23%)Rejected-Finance SUDARSHANPUR RAIGANJ UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | 733130 | L5 | Rejected-Finance Rejected |
Tender Value
₹24.8 L
EMD Value
₹49,501
Closing Date
2 Sept 2024, 3:00 pmClosed
Executive Engineer Alipore Division PHE Dte.
45, Ganesh Chandra Avenue, 5th Floor, Kolkata - 700013
Construction of boundary wall at Head Work Site for Ground Water Based at Jelepara Piped Water Supply Scheme, Block- Gosaba Under Canning Sub-Division of Alipore Division, PHE Dte.
2024_PHED_725911_18
WBPHED/EE/NIeT-31/AD/2024-2025
Open Tender
CIVIL WORKS
Percentage
30 days
Canning
Please refer Tender documents.
4 documents required · 4 mandatory
₹49,501
14 Nov 2024
1 Aug 2024
4 Sept 2024
3 Aug 2024
2 Sept 2024
3 Aug 2024
eProcurement System of Government of West Bengal Created By: SUDIP DANDAPAT Created Date/Time: 11-Nov-2024 03:28 PM Tender Title: NIeT-31/AD/24-25/18 Tender ID: 2024_PHED_725911_18
Tender Inviting Authority: EXECUTIVE ENGINEER, ALIPORE DIVISION, P.H.E. DTE.
Name of Work : Construction of boundary wall at Head Work Site for Ground Water Based at Jelepara Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.
Contract No: WBPHED/EE/NIeT- 31/AD/2024-2025 (SL. NO. - 18)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 VISHAL CONSTRUCTION CO. (GSTN-19AFNPK3557Q1Z1) BID ID -5490501 2475057.59 .80 2494858.46 Twenty Four Lakh Ninty Four Thousand Eight Hundred and Fifty Eight
2.00 NIRMAL UDYOG (GSTN-19ARGPM8863N1ZT) BID ID -5506424 2475057.59 1.26 2506243.73 Twenty Five Lakh Six Thousand Two Hundred and Fourty Three
3.00 REALIENCE CONSTRUCTION (GSTN-NA) BID ID -5504724 2475057.59 1.49 2511936.36 Twenty Five Lakh Eleven Thousand Nine Hundred and Thirty Six
4.00 M/S SOMNATH KUNDU (GSTN-NA) BID ID -5506440 2475057.59 2.23 2530251.79 Twenty Five Lakh Thirty Thousand Two Hundred and Fifty One
5.00 ADITYA HAZRA (GSTN-NA) BID ID -5497061 2475057.59 0.00 2475058.00 Twenty Four Lakh Seventy Five Thousand Fifty Eight
Lowest Amount Quoted BY: ADITYA HAZRA(2475058.00)
BOQ Summary Details Tender Title: NIeT-31/AD/24-25/18 Tender ID: 2024_PHED_725911_18
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ADITYA HAZRA (BID ID -5497061) 2475058.00 L1
2 VISHAL CONSTRUCTION CO. (BID ID -5490501) 2494858.46 L2
3 NIRMAL UDYOG (BID ID -5506424) 2506243.73 L3
4 REALIENCE CONSTRUCTION (BID ID -5504724) 2511936.36 L4
5 M/S SOMNATH KUNDU (BID ID -5506440) 2530251.79 L5
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .