| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 Cr+₹21.4 L (19.3%)Accepted-Finance | ₹1.3 Cr+₹21.4 L (19.3%) | L2 | Accepted-Finance L2 |
| 3 | L3₹1.3 Cr+₹22.6 L (20.4%)Rejected-Finance | ₹1.3 Cr+₹22.6 L (20.4%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance NEREVEETTIL HOUSE THRIKKAKARA P O KOCHI 682 021 | ERNAKULAM | KERALA | 682021 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Sri N.J. Thomas was rejected due to non submission of GST. As per ITB clause 1.3.7 the bidder shall have valid GST Registration and should be submitted. |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance APRA A 20 DEVIKRIPA MARUTHOORKADAVU KALADY KARAMANA P O | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not signed Preliminary Agmt & not submitted Integrity Pact (As per Clause 4.3.4 & 4.3.5, Duly filled and signed copy of preliminary agreement & Integrity Pact as per item no.2 & 3 respectively on Part-VI of this bid document should be submitted) |
| Sl No | Description | Qty | Unit | M MUHAMMED KUNHI L3 | SUNREL CEMENTS PVT LTD L1 | abdul javad m L2 |
|---|---|---|---|---|---|---|
| 1.00APPENDIX A: Building Proper | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 85.36 | cum | 395.33 ₹33,745.37 | 328.4 ₹28,032.22 Lowest | 407.2 ₹34,758.59 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 19.24 | cum | 8,718.25 ₹1,67,730.41 | 7,242.7 ₹1,39,342.31 Lowest | 8,980.03 ₹1,72,766.8 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 79.98 | sqm | 424.39 ₹33,942.71 | 352.5 ₹28,192.95 Lowest | 437.13 ₹34,961.66 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 388.06 | sqm | 838.41 ₹3,25,354.22 | 696.5 ₹2,70,284.49 Lowest | 863.58 ₹3,35,121.72 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 320.54 | sqm | 1,108.4 ₹3,55,285.43 | 920.8 ₹2,95,152.31 Lowest | 1,141.68 ₹3,65,952.97 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 107.27 | sqm | 1,123.11 ₹1,20,473.76 | 933 ₹1,00,081.04 Lowest | 1,156.84 ₹1,24,091.91 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 412.37 | sqm | 1,056.4 ₹4,35,627.67 | 877.6 ₹3,61,895.91 Lowest | 1,088.12 ₹4,48,708.04 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 41.48 | sqm | 906.47 ₹37,595.84 | 753 ₹31,230.68 Lowest | 933.68 ₹38,724.38 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 187.23 | metre | 250.71 ₹46,940.43 | 208.2 ₹38,981.29 Lowest | 258.24 ₹48,350.28 |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
18 Jul 2026, 4:00 pmClosed
Superintending Engineer
O/o Superintending Engineer, PWD Buildings South circle
GENERAL Govt LP School Mattathilbhagam Cherthala Construction of School Building-General Civil Work
2026_PWD_859653_1
PWD/BLDG/TR/11462/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
Mattathilbhagam Cherthala-
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
31 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX A: Building Proper | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.4 | sqm | - | - |
| 1.005 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.6 | sqm | - | - |
| 1.006 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 0.2 | sqm | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.008 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | - | sqm | - | - |
| 1.009 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
form.pdf
Additional Documents • 0.26 MB
aff.pdf
Additional Documents • 0.26 MB
pre.pdf
Additional Documents • 0.27 MB
integrity.pdf
Other Document • 0.07 MB
BOQ_1453599.xls
BOQ • 0.33 MB
epayment.pdf
Other Document • 0.05 MB
bid.pdf
Tender Documents • 3.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .