| 1 | L1₹1.7 CrAdmitted-Finance CO RPORTARATE OFFICE UJJAYANTA MARKET BLOCK C ROOM NO 310 AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹31.7 L (18.2%)Admitted-Finance | ₹2.1 Cr+₹31.7 L (18.2%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹31.8 L (18.3%)Admitted-Finance 58 C MANTRI BARI ROAD WARD NO 32 AGARTALA AMC AGARTALA WEST TRIPURA | ₹2.1 Cr+₹31.8 L (18.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MINAMATI ENTERPRISE L2 | SBA CONSTRUCTION PVT LIMITED L3 | M/S CHITTARANJAN SAHA & OTHERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of flexible pavements and disposal of dismantled materials with all lifts and upto a lead of 100 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202..( I ) By Manual Means ( A ) | 8,748 | sqm | 788.58 ₹68,98,497.84 | 800 ₹69,98,400 | 381 ₹33,32,988 Lowest |
| 2.00 | WMM: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting withvibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406. | 437.4 | Cum | 5,299 ₹23,17,782.6 | 2,500 ₹10,93,500 Lowest | 12,000 ₹52,48,800 |
| 3.00 | Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6 kg/sqm using mechanical means as per MoRT&H Technical Specification Clause 502. | 8,748 | sqm | 41.27 ₹3,60,986.22 | 45 ₹3,93,660 | 10 ₹87,480 Lowest |
| 4.00 | Tack coat Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous / granular surface cleaned with Hydraulic broom as per MoRT&H Technical Specification Clause 503. | 8,748 | sqm | 13.58 ₹1,18,806.59 | 20 ₹1,74,960 | 10 ₹87,480 Lowest |
| 5.00 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects. | 437.4 | Cum | 14,735.56 ₹64,45,331.76 | 16,500 ₹72,17,100 | 12,000 ₹52,48,800 Lowest |
| 6.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects. B. Grading II With Viscosity Graded Bitumen of VG-30. | 262.44 | Cum | 16,938.91 ₹44,45,447.54 | 18,000 ₹47,23,920 | 13,000 ₹34,11,720 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
23 Aug 2025, 5:00 pmClosed
Executive Director (P)
3rd floor, UD bhavan near Ravindra bhavan, Agartala, Tripura
R R work on NH 208 from km 63.700 to km 75.700 Total Length 12.000 Km at various sections of Bamanchara to Srirampur at risk and cost of EPC Contractor in Tripura in FY 2025 26 on item rate basis work order basis
2025_NHIDC_871655_1
NHIDCL/RO-Agt/W/T/Bamanchara - Srirampur(Pkg-IV)/322-Part(1)
Open Tender
Civil Works - Roads
Item Rate
180 days
Tripura
Please refer tender documents
4 documents required · 4 mandatory
₹11,800
Executive Director (P)
₹5.2 L
Yes
NHIDCL, RO Agartala
16 Sept 2025
2 Aug 2025
25 Aug 2025
2 Aug 2025
23 Aug 2025
2 Aug 2025
9 Aug 2025
Amount
Dismantling of flexible pavements and disposal of dismantled materials with all lifts and upto a lead of 100 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202..( I ) By Manual Means ( A )
WMM: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting withvibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.
Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6 kg/sqm using mechanical means as per MoRT&H Technical Specification Clause 502.
Tack coat Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous / granular surface cleaned with Hydraulic broom as per MoRT&H Technical Specification Clause 503.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects. B. Grading II With Viscosity Graded Bitumen of VG-30.
M/S MINAMATI ENTERPRISE (BID ID -3271015)
SBA CONSTRUCTION PVT LIMITED (BID ID -3268820)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .