Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | - | Rejected-Technical EMD paid and Necessary documents not uploaded |
| Sl No | Description | Qty | Unit | KDM BUILDERS AND CONTRACTORS L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC at various places in the building including clearing the debries to far of place as directed by site Engineer incharge including cost of all labour charges , lead, lift, T&Ps etc., complete. | 11 | Cum | 4,410 ₹48,510 Lowest |
| 2.00 | Dismantling the existing Brick masonry, and disposing the debries 1 Km away from the site including cost of all labour charges , lead, lift, T&Ps etc., complete and as directed by the Engineer inchatge of the work . | 8 | Cum | 243 ₹1,944 Lowest |
| 3.00 | Dismantling the existing PCC and disposing the debries 1 Km away from the site including cost of all labour charges , lead, lift, T&Ps etc., complete and as directed by the Engineer incharge of the work | 4 | Cum | 360 ₹1,440 Lowest |
| 4.00 | Dismantling the existing Doors and Windows including removal of frames, hinges and fastenings disposing the wooden scrap materials 1 Km away from the site including cost of all labour charges , lead, lift, T&Ps etc., complete and as directed by the Engineer incharge of the work . | 4 | Sqm | 50 ₹200 Lowest |
| 5.00 | Removing the existing 0.47mm thick Pre Painted Galvanium Sheets, purlins and supporting posts as directed by the Engineer in charge including cost of all materials, welding, cutting, lead, lift, T&Ps etc., complete. | 16.8 | Sqm | 270 ₹4,536 Lowest |
| 6.00 | Supplying and filling the basement and foundation with M.sand watering and consolidation etc., including cost of materials, labour, lead, lift, T&P etc., and as directed by the Engineer incharge of the work. | 4 | Cum | 1,600 ₹6,400 Lowest |
| 7.00 | PCC 1:4:8 using 40mm HB stone for foundation, flooring, etc., in the following levels as instructed by the Engineer in charge including cost of all materials, labour, lead lift, T&P, etc., complete. | 4 | Cum | 4,500 ₹18,000 Lowest |
| 8.00 | Brick works in Cement mortar 1 : 5 using Second Class Ground Moulded Chamber Burnt Bricks 9" x 4 3/8" x 2 3/4" including cost of all materials, labour lead, lift, curing, T&Ps etc., complete and as directed by the Engineer incharge of the work. | 21 | Cum | 6,300 ₹1,32,300 Lowest |
| 9.00 | RCC M20 (1:1.5:3)using 12-20mm HBG stone with form work for lintel beam and sunshade etc., in the following levels as instructed by the Engineer incharge including cost of all materials, labour ,lead,lift etc complete but excluding cost of steel reinforcement. | 4 | Cum | 15,300 ₹61,200 Lowest |
| 10.00 | RCC M20 (1:1.5:3)using 12-20mm HBG stone with form work for Roof slab etc., in the following levels as instructed by the Engineer incharge including cost of all materials, labour ,lead,lift etc complete but excluding cost of steel reinforcement. | 11 | Cum | 12,600 ₹1,38,600 Lowest |
Tender Value
₹11.1 L
EMD Value
₹11,100
Closing Date
10 Jun 2025, 2:00 pmClosed
Superintending Engineer/ PEDC / Perambalur
O/o. Superintending Engineer/ PEDC / Perambalu
Improvement to the existing AEE O M Town Perambalur Office building for the accommodation of AEE O M Town and AEE O M Rural Perambalur offices by renovating the roof floor doors windows of the building and other allied works
2025_EB_562040_1
Civil-E-01/2025-26
Open Tender
Civil Works
Works
90 days
Perambalur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,100
7 Aug 2025
27 May 2025
11 Jun 2025
27 May 2025
10 Jun 2025
27 May 2025
Amount
Dismantling the existing damaged RCC at various places in the building including clearing the debries to far of place as directed by site Engineer incharge including cost of all labour charges , lead, lift, T&Ps etc., complete.
Dismantling the existing Brick masonry, and disposing the debries 1 Km away from the site including cost of all labour charges , lead, lift, T&Ps etc., complete and as directed by the Engineer inchatge of the work .
Dismantling the existing PCC and disposing the debries 1 Km away from the site including cost of all labour charges , lead, lift, T&Ps etc., complete and as directed by the Engineer incharge of the work
Dismantling the existing Doors and Windows including removal of frames, hinges and fastenings disposing the wooden scrap materials 1 Km away from the site including cost of all labour charges , lead, lift, T&Ps etc., complete and as directed by the Engineer incharge of the work .
Removing the existing 0.47mm thick Pre Painted Galvanium Sheets, purlins and supporting posts as directed by the Engineer in charge including cost of all materials, welding, cutting, lead, lift, T&Ps etc., complete.
Supplying and filling the basement and foundation with M.sand watering and consolidation etc., including cost of materials, labour, lead, lift, T&P etc., and as directed by the Engineer incharge of the work.
PCC 1:4:8 using 40mm HB stone for foundation, flooring, etc., in the following levels as instructed by the Engineer in charge including cost of all materials, labour, lead lift, T&P, etc., complete.
Brick works in Cement mortar 1 : 5 using Second Class Ground Moulded Chamber Burnt Bricks 9" x 4 3/8" x 2 3/4" including cost of all materials, labour lead, lift, curing, T&Ps etc., complete and as directed by the Engineer incharge of the work.
RCC M20 (1:1.5:3)using 12-20mm HBG stone with form work for lintel beam and sunshade etc., in the following levels as instructed by the Engineer incharge including cost of all materials, labour ,lead,lift etc complete but excluding cost of steel reinforcement.
RCC M20 (1:1.5:3)using 12-20mm HBG stone with form work for Roof slab etc., in the following levels as instructed by the Engineer incharge including cost of all materials, labour ,lead,lift etc complete but excluding cost of steel reinforcement.
Providing steel reinforcements for RCC works including cost of steel, binding wire and labour for cutting bending tying and placing in position, lead. Lift, T&Ps etc., complete and as directed by the Engineer incharge of the work.
Fabrication,supply & fixing of steel framed double leaves door using 50x50x6mm MS angle for door frame, 40x40x6mm MS angle for shutter frame,25x6mm MS Flat for stiffner, 16gauge MS sheet for panels,painting 2 coats with enamel paint over one coat of red oxide as directed by the Engineer in charge including cost of all materials,labour,lead,lift,etc., complete-
Providing PCC 1:2:4, using 6mm HBG stone chips over a roof slab to average thickness of 4cm and plastering with C.M 1:5 12mm thick including cost of all materials, lead, lift, curing and T&Ps etc complete and as directed by the Engineer incharge of the work.
Chipping the existing plastering, and disposing the debries 1 Km away from the site including cost of all labour charges , lead, lift, etc., complete and as directed by the Engineer inchatge of the work.
Providing flooring with polished cuddapah slab of 20 mm thick for steps as per standard specification and drawing including cost of all materials cutting, fixing, polishing and laying charges, lead,lift, T&Ps and curing etc complete and as directed by the Engineer incharge of the work.
Plastering with C.M 1:3, 10mm thick including cost of cement all materials labour, lead lift, curing,T&Ps etc., complete and as directed by the Engineer incharge of the work.
Plastering with C.M 1:5 12mm thick including cost of cement all materials labour, lead, lift, curing, T&Ps etc., complete and as directed by the Engineer incharge of the work.
Flooring with approved ceramic of non slippery type tiles over cement mortar 1:2, 12mm thick including pointing with white cement finishing the joints, flush pointing the surface cost of all materials labour lead lifts etc., complete.
Supplying and fixing of New Solid PVC Door Shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using 5mm thick solid PVC Sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter and including cost of all materials, labour, lead, lift, T&Ps etc., complete as directed by Board Engineer at site.
Providing dadooing the inside of toilet walls with glazed tiles 300*200 to a height of 2.10m over cm 1:2 10mm thick and joints shallbe finished with white cement including cost of all materials lead, lift, T&Ps etc., complete and as directed by the Engineer incharge of the work.
Supplying and fixing white ORIYA TYPE water closet with flushing cistern of approved quality with 'P' and 'S' Trap embedded the closet with trap to shape in position with brick jelly concrete 32:12:5 using 40mm hard broken brick jelly finishing the top to required shape etc., including cost of all materials, labour, lead, lift, etc., complete as per standard specification.
Supplying and fixing European Water Closet of best quality and approved make with “P” or “S” trap, double flapped seat and seat cover with brass hinges and 10 litre capacity PVC low level flushing tank with all internal fittings as instructed by the Enginer incharge including cost of all materials labour, lead, lift, T&Ps etc., complete as per standard specification and also giving necessary correction to the PVC pipe and painting the CI brackets with two coats pf approved paint over one coat of red oxide primer, dismantling the masonry and re-doing the dismantled masonry to original condition, etc., complete complying with standard specifications. (The EWC and flushing tank with all accessories should be got approved by the Executive Engineer before use on works)nt over one coat of red oxide primer, dismantling the masonry and re-doing the dismantled masonry to original condition, etc., complete complying with standard specifications. (The EWC and flushing tank with all accessories should be got approved by the Executive Engineer before use on works)
Supplying and fixing of wash hand basin of size 550mm x 400mm with all accessories such as cast iron brackets , 32mm dia C.P. waste coupling, rubber plug and chain, 32mm dia “ B “ class G.I. waste pipe, 15mm dia G.M. wheel valve , 15 mm dia nylon connection, 15 mm dia brass nipples, 15 mm C.P. pillar tap etc., including cost of all materials, labour lead, lift, etc., complete.
Supplying and fixing best quality of mirror of size 600x450mm mirror with SS soap tray, 600 mm SS towel rod, screws and fixing near the wash basin teak wood round block including cost of all materials, labour, lead, lift, T&Ps etc., complete and as directed by the Engineer incharge of the work.
Supplying and fixing of PVC pipe of 110 mm dia, 6 kg / cm2 with necessary, leads, lift, T&Ps etc complete and as directed by the Engineer incharge of the work.
Supplying and fixing in position of 25mm dia UPVC pipes (schedule-40) with ISI monogram with necessary clamps and adhesive solution, etc., including cost of materials,labour, lead, lift, T&Ps etc. Complete and as directed by the Engineer incharge of the work.
Supplying and fixing in position of 20mm dia UPVC pipes (schedule-40) with ISI monogram with necessary clamps and adhesive solution, etc., including cost of materials,labour, lead, lift,T&Ps etc. Complete and as directed by the Engineer incharge of the work.
Providing and fixing up of 25mm dia Gun metal wheel valve including fixing charges, materials, lead, lift, T&Ps etc., complete and as directed by the Engineer incharge.
Providing and fixing up of 20mm dia Gun metal wheel valve including fixing charges materials, lead, lift, T&Ps etc., complete and as directed by the Engineer incharge.
Providing and fixing of 12mm screw down bib cock water supply tap including cost of pipe and labour fixing charges lead, lift, T&P and as per standard specification etc. Complete and as directed by the Engineer incharge of the work.
White washing Two coats with white cement including cost of all materials, labour, lead, lift etc complete and as directed by the Engineer incharge of the work.
Painting the outside wall with two coats of best quality exterior emulsion of approved colour over a interior primer coat of all materials, etc., complete and as directed by the Engineer incharge of the work.
Painting the inside walls with two coats of best quality interior emulsion of approved colour over a interior primer coat of all materials, etc., complete and as directed by the Engineer incharge of the work.
Removal of existing damaged doors & windows and dismantling and cleaning of damaged roof slab by " AS IS WHERE IS " condition. This amount will be deducted in the CC I & Part bill for this work.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .