Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.1 LAccepted-AOC | 1 | Accepted-AOC Being L1, Considered for Award of Contract | |
| 2 | 2₹14.3 L+₹20,680.65 (1.46%)Rejected-Finance 240 4TH CROSS M S RAMAIAH NORTH CITY THANISANDRA MAIN ROAD NAGAVARA BANGALORE 560077 | BENGALURU URBAN | KARNATAKA | 560077 | 2 | Rejected-Finance Being L1 Rejected |
Tender Value
₹13.6 L
EMD Value
₹27,125
Closing Date
2 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada 520007 A.P
As per the NIT document
2020_ASI_597159_1
12/NIT/2020-21/Amaravati /Kadapa Sub circle
Open Tender
Civil Works
Item Rate
180 days
Pushpagiri, Kadapa district
As per the NIT document
6 documents required · 6 mandatory
₹0
₹27,125
Yes
4 Jan 2021
13 Nov 2020
3 Dec 2020
13 Nov 2020
2 Dec 2020
13 Nov 2020
90 days
Amount
Description of items
Item No.1: Careful removal of the roof concrete over broken beams area in front of Sivakesava & Uma maheswara sub shrines not causing any damage to the structure. Including cost, conveyance of materials, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.2: Careful Removal of broken beams and slabs in front of Sivakesava & Uma maheswara sub shrines with chain pulley block not causing any damage to the structure. Including cost, conveyance of materials, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.3: Careful Erection of new finished dressed Kadapa Stone Beams of Size 3.45x0.45x0.30 m for fixing to roof in front of Sivakesava & Uma maheswara sub shrines with chain pulley block not causing any damage to the structure. carefully Including cost, conveyance of materials, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.4: Careful Re-laying of Kadapa stone slabs of size 3.20x0.60x0.10m over replaced beams in front of Sivakesava & Uma maheswara sub shrines with chain pulley block not causing any damage to the structure. Including cost, conveyance of materials, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.5: Providing Plain Lime Concrete (1:2:4) (Lime: fine aggregate: Coarse aggregate) for Roof slab using hard broken brick aggregate 20mm size hard. Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.6: Water tightening over roof in lime mortar (1:2) in front of Sivakesava & Uma maheswara sub shrines. Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.8: Repairs to the existing drain lines by removing the flooring slabs over the drain for inspection and cleaning the garbage, sludge in the blocked drainage. Including cost, conveyance of materials, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.9: Relaying the stone slabs over the drainage after cleaning and pointing to the stone slabs over the drainage in LM (1:1:1) Including cost, conveyance of materials, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.10: Repairs and resetting the disturbed walls of kalyanakatta in alignment with available stones in LM (1:1:1) and pointing in LM (1:1:1). Including cost, conveyance of materials, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.11: Relaying of coping over walls kalyanakatta in Plain Lime Concrete (1:2:4) (Lime: fine aggregate: Coarse aggregate) using 20mm brick aggregates. Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.12: Raising the existing wall at river side in stone masonry in LM (1:1:1) using Kadapa stones of size 0.45x0.30x0.23m. Including cost, conveyance of materials, mixing, laying to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.13: Pointing to wall in LM (1:1:1) Including cost, conveyance of materials, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.15: Removal of the disturbed and loose portions of wall and reconstruction around the temple in LM (1:1:1) with 50% available stones and 50 % new Kadapa stones of size 0.45x0.30x0.23 m laying of coping over walls in Plain Lime Concrete (1:2:4) using hard broken brick aggregate 20mm size hard. Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.17: Pointing to safe wall in LM (1:1:1) Including cost, conveyance of materials, mixing, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.18: Providing stone flooring in front of mukha mandapa of Gadhadara temple using new kadapa stone slabs of size 0.90x0.60x0.075m over lime concrete (1:2:6) of 100mm thick in LM (1:1:1) and Pointing to stone flooring in LM (1:1:1). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.19: Repairs to roof of Gadhadara temple by removing dead lime plaster layer on roof and grouting in lime mortar (1:1) and water tightening over roof in lime mortar (1:2). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.20: Removal and resetting of the disturbed walls of choultry no 7 in alignment with available stones in LM (1:1:1) and pointing in LM (1:1:1). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.21: Pointing to the walls of choultry no.6 in lime mortar (1:1:1). Including cost, conveyance of materials, mixing, laying, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.22: Relaying of roof concrete in in Plain Lime Concrete (1:2:4) using hard broken brick aggregate 20mm size hard and water tightening over roof in lime mortar (1:2). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.23: Removal and relaying of the undulated stone flooring inside choultry on lime concrete (1:2:4) bed of 0.10m thick using hard broken brick aggregate 20mm size and Pointing to the stone flooring in LM (1:1:1). Including cost, conveyance of all materials, machine mixing, laying concrete to the required level, curing and overheads, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.24: Raising of walls with the Kadapa stones of size 0.45x0.30x0.23 m in LM (1:1:1). Including cost, conveyance of all materials, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.25: Removal and relaying of damaged roof over the choultry 5 using special bricks of size 0.25x0.15x0.04m layer fixing in LM (1:1:1) and lime concrete (1:2:4) roof of 0.10m thick using hard broken brick aggregate 20mm size and water tightening over roof in lime mortar (1:2). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.26: Cleaning inside the choultry filled with garbage, bats etc. and other unhygienic materials. Including cost, conveyance of all materials, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.27: Re-Laying of missing roof of Annasatram with 50% available and 50% new Kadapa slabs of size 1.80x0.90x0.10m. in lime mortar (1:1:1). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, fixing in position with chain pulley curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.28: Removal and relaying of damaged roof over Annasatram using special bricks of size 0.25x0.15x0.04m layer and lime concrete (1:2:4) roof of 0.10m thick using hard broken brick aggregate 20mm size hard and water tightening over roof in lime mortar (1:2). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, fixing in position with chain pulley curing and overheads, Scaffolding, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete.
Item No.30: Laying of stone flooring between Annasatram and Choultry 5 with 25% available and 75% new Kadapa stone slabs of size 1.20x0.60x0.075m over lime concrete of 100mm thick in LM (1:1:1) and Pointing to stone flooring in LM (1:1:1). Including cost, conveyance of materials, machine mixing, laying concrete to the required level, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete
Item No.31: Raising of safe wall at river side in stone masonry in LM (1:1:1) using Kadapa stones of size 0.45x0.30x0.23m. Including cost, conveyance of materials, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete..
Item No.32: Pointing to wall in LM (1:1:1). Including cost, conveyance of materials, curing and overheads, loading, unloading, transportation, labour, seigniorage charges, GST and other taxes etc. complete..
SRI SATHYA ENGINEERS AND CONTRACTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .