Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹25.2 L
EMD Value
₹26,000
Closing Date
4 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUIVE ENGINEER, Capital Project Electrical Division, Gandhinagar
Annual Maintenance of various Type A.C. Machines, Water Cooler Water geayser & R.O. pant Installed in Non Residential Section-2, 3 & 4 (Sector-9 to 14) of Capital Project Electrical sub-div 23 Gandhinagar
367687
17/02 OF 2026/2027
Open
Electrical and Maintenance Works
Works
Gandhinagar
8 documents required · 8 mandatory
₹1,500
Executive Engineer, Capital Project Electrical Division, Gandhinagar.
₹26,000
20 Nov 2026
20 Nov 2026
20 Nov 2026
4 Dec 2026
20 Nov 2026
90 days
Name of Work Annual maintenance of Various type A.C machines , Watercooler ,water geayser & R.O Plant installed in Non
residential section 2,3 & 4 (Sector-9 to 14) of Capital Project Electrical Sub Div-23, Gandhinagar.
Fund Head : 2059 P.W M& R S.R
Sr. No. Item No. Particulars. Qty. Rate Amount
Signature of Contractor Deputy Executive Engineer Executive Engineer
C.P Electrical R & B Sub Division-23 C.P Electrical R & B Dn
Gandhinagar Gandhinagar.
I/We am/are willing to carry out the work at(No above rates allowed) ____________% below ___________________________________
__________________percent (Should be written in figures and words) below the tendered rates mentioned above.
Amount of my/our tender works out as under :
Put to Tender Rs. Put to Tender Rs.
(Please strike out whichever is not applicable)
1 I/We hereby declare that I/We have visited the site, fully exquisite myself/ourselves with the local situation regarding materials and other factors pertaining to the work before
submitting this tender.
2 I/we hereby declare that I/We carefully studied the conditions of specifications and other tender documents of this work and agree to execute the same accordingly.
3 A tender with any overwriting in percentage (should both in word and figures) rejected out right.
4 Insertions and/or corrections in the percentage quoted ( both in word and figures) resulting into increase in the value of the work shall be rejected outright unless it is
authenticated by the office opening the tender at the time of opening of tender.
5 Dismentaling the existing material taken by contractor as mention rates.
Signature of Contractor Deputy Executive Engineer Executive Engineer
C.P Electrical R & B Sub Division-23 C.P Electrical R & B Dn
Gandhinagar Gandhinagar.
Name of Work: Annual maintenance of Various type A.C machines , Watercooler & water geayser installed in Non residential section 2,3 & 4 (Sector-9 to 14) of
Capital Project Electrical Sub Div-23, Gandhinagar.
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
All inclusive comprehensive maintenance cost for the period of one
year for the Split type Air-conditioning Unit of following
1(A) 189 Nos. 1233.21 Hundred Thirty Ea.
Capacity.(B)1.5 ton Capacity. (A) Charges for breakdown
Three And Paise
Maintenance as per requirement throughout the year
Twenty One Only
(B) Charges for 1st Routine Maintenance of Dry Services between
B 189 Nos. date of commencement to 3rd Months from date of issue of work 144.43 Ea.
Forty Three Only
(C) Charges for 2nd Routine Maintenance of wet Services with water
C 189 Nos. or Chemical as per site requirement Services between 3rd months to 267.65 Ea.
Seven And Paise
6th Months from date of issue of work order.
Sixty Five Only
(D) Charges for 3rd Routine Maintenance of Dry Services between Hundred Forty
6th months to 9th Months from date of issue of work order. Four And Paise
Forty Three Only
(E) Charges for 4th Routine Maintenance of wet Services with water
E 189 Nos. or Chemical as per site requirement Services between 9th months 267.65 Ea.
Seven And Paise
to 12th Months from date of issue of work order.
Sixty Five Only
(C)2.0 ton Capacity. (1) Charges for breakdown Maintenance as per
2(A) 97 Nos. 1464.50 Hundred Sixty Ea.
requirement throughout the year
(2) Charges for 1st Routine Maintenance of Dry Services between
Hundred Seventy
B 97 Nos. date of commencement to 3rd Months from date of issue of work 171.70 Ea.
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
(3) Charges for 2nd Routine Maintenance of wet Services with water Hundred
C 97 Nos. or Chemical as per site requirement Services between 3rd months to 317.14 Seventeen And Ea.
6th Months from date of issue of work order. Paise Fourteen
(4) Charges for 3rd Routine Maintenance of Dry Services between Hundred Seventy
D 97 Nos. 171.70 Ea.
6th months to 9th Months from date of issue of work order. One And Paise
(5) Charges for 4th Routine Maintenance of wet Services with water Hundred
E 97 Nos. or Chemical as per site requirement Services between 9th months 317.14 Seventeen And Ea.
to 12th Months from date of issue of work order. Paise Fourteen
All inclusive comprehensive maintenance cost for the period of one
year for the Inverter Based Split type Air-conditioning Unit of
2(A) 5 Nos. 2282.60 Hundred Eighty Ea.
following Capacity(B)1.5 ton Capacity. (A) Charges for breakdown
Maintenance as per requirement throughout the year
(B) Charges for 1st Routine Maintenance of Dry Services between
B 5 Nos. date of commencement to 3rd Months from date of issue of work 267.65 Ea
Seven And Paise
Sixty Five Only
(C) Charges for 2nd Routine Maintenance of wet Services with water
C 5 Nos. or Chemical as per site requirement Services between 3rd months 494.90 Ea
to 6th Months from date of issue of work order.
(D) Charges for 3rd Routine Maintenance of Dry Services between Hundred Sixty
D 5 Nos. 267.65 Ea
6th months to 9th Months from date of issue of work order. Seven And Paise
Sixty Five Only
(E) Charges for 4th Routine Maintenance of wet Services with water
E 5 Nos. or Chemical as per site requirement Services between 9th months 494.90 Ea
to 12th Months from date of issue of work order.
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
(C) 1.7 to 2.0 ton capacity. (A) Charges for breakdown Maintenance
3(A) 8 Nos. 2829.01 Hundred Twenty Ea.
as per requirement throughout the year
(B) Charges for 1st Routine Maintenance of Dry Services between
B 8 Nos. date of commencement to 3rd Months from date of issue of work 330.27 Ea
And Paise Twenty
(C) Charges for 2nd Routine Maintenance of wet Services with water Rupees Six
C 8 Nos. or Chemical as per site requirement Services between 3rd months 612.06 Hundred Twelve Ea
to 6th Months from date of issue of work order. And Paise Six Only
(D) Charges for 3rd Routine Maintenance of Dry Services between Hundred Thirty
D 8 Nos. 330.27 Ea
6th months to 9th Months from date of issue of work order. And Paise Twenty
(E) Charges for 4th Routine Maintenance of wet Services with water Rupees Six
E 8 Nos. or Chemical as per site requirement Services between 9th months 612.06 Hundred Twelve Ea
to 12th Months from date of issue of work order. And Paise Six Only
All inclusive comprehensive maintenance cost for the period of one
year for the Cassette type split Air-conditioning Unit of following
3(A) 15 Nos. 2543.18 Hundred Forty Ea.
Capacity. (B) 1.5 ton capacity. (A) Charges for breakdown
Three And Paise
Maintenance as per requirement throughout the year
(B) Charges for 1st Routine Maintenance of Dry Services between
B 15 Nos. date of commencement to 3rd Months from date of issue of work 296.94 Ea
Ninety Four Only
(C) Charges for 2nd Routine Maintenance of wet Services with water
Hundred Fifty One
C 15 Nos. or Chemical as per site requirement Services between 3rd months 551.46 Ea
And Paise Forty
to 6th Months from date of issue of work order.
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
(D) Charges for 3rd Routine Maintenance of Dry Services between Hundred Ninety
D 15 Nos. 296.94 Ea
6th months to 9th Months from date of issue of work order. Six And Paise
Ninety Four Only
(E) Charges for 4th Routine Maintenance of wet Services with water
Hundred Fifty One
E 15 Nos. or Chemical as per site requirement Services between 9th months 551.46 Ea
And Paise Forty
to 12th Months from date of issue of work order.
All inclusive comprehensive maintenance cost for the period of one
year for the Cassette type split Air-conditioning Unit of following
4(A) 8 Nos. 3184.53 Hundred Eighty Ea.
Capacity. (C) 2.0 ton capacity. (A) Charges for breakdown
Maintenance as per requirement throughout the year
Fifty Three Only
(B) Charges for 1st Routine Maintenance of Dry Services between
Hundred Seventy
B 8 Nos. date of commencement to 3rd Months from date of issue of work 371.68 Ea
Sixty Eight Only
(C) Charges for 2nd Routine Maintenance of wet Services with water
C 8 Nos. or Chemical as per site requirement Services between 3rd months 690.84 Ea
And Paise Eighty
to 6th Months from date of issue of work order.
(D) Charges for 3rd Routine Maintenance of Dry Services between Hundred Seventy
D 8 Nos. 371.68 Ea
6th months to 9th Months from date of issue of work order. One And Paise
Sixty Eight Only
(E) Charges for 4th Routine Maintenance of wet Services with water
E 8 Nos. or Chemical as per site requirement Services between 9th months 690.84 Ea
And Paise Eighty
to 12th Months from date of issue of work order.
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
All inclusive comprehensive maintenance cost for the period of one
year for the Cassette type split Air-conditioning Unit of following
5(A) 21 Nos. 4859.11 Hundred Fifty Nine Ea.
Capacity. (C) 3.0 ton capacity.- 3 Phase. (A) Charges for breakdown
And Paise Eleven
Maintenance as per requirement throughout the year
(B) Charges for 1st Routine Maintenance of Dry Services between
B 21 Nos. date of commencement to 3rd Months from date of issue of work 567.62 Ea
Seven And Paise
(C) Charges for 2nd Routine Maintenance of wet Services with water
C 21 Nos. or Chemical as per site requirement Services between 3rd months 1053.43 Ea
Three And Paise
to 6th Months from date of issue of work order.
Forty Three Only
(D) Charges for 3rd Routine Maintenance of Dry Services between Hundred Sixty
D 21 Nos. 567.62 Ea
6th months to 9th Months from date of issue of work order. Seven And Paise
(E) Charges for 4th Routine Maintenance of wet Services with water
E 21 Nos. or Chemical as per site requirement Services between 9th months 1053.43 Ea
Three And Paise
to 12th Months from date of issue of work order.
Forty Three Only
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
All inclusive comprehensive maintenance cost for the period of one
year for the Cassette type split Air-conditioning Unit of following
Capacity. 4.0 ton capacity.- 3 Phase. Note(1) The All inclusive
comprehensive maintenance cost covers the yearly maintenance
cost of the electrical machineries with material & Labour cost including
preventive maintenance. The cost covers entire installation from
outlet of main switch to electrical machine..(2) All inclusive
comprehensive maintenance cost of Window type / Split type Air
6 8 Nos. 5726.25 Hundred Twenty Ea
conditioners & Water coolers covers the yearly maintenance &
preventive maintenance with all required painting materials & labours.
Twenty Five Only
including sheet metal work, refrigerant gas , compressor & all the
contains parts. The cost covers entire installation from outlet of main
switch to the Unit.This Rate includes all Charges for breakdown
maintenance as per requirement throughout the year & 2 Nos. Dry
Service and 2 Nos. wet or chemical service.(Note:Rate taken is 5% of
Capital cost as per S.O.R)
All inclusive comprehensive maintenance cost for the period of one Thousand Three
7 141 Nos. year for the water Cooler of following Capacity .(B) 120 / 150 Ltr 3339.06 Hundred Thirty Ea.
capacity . Nine And Paise
All inclusive comprehensive maintenance cost for the period of one Rupees Six
year for the water Heater( Geysers) inclusive inlet & outlet water Hundred Eleven
connections flexible piping of following Type & Capacity (A) 3 to 10 And Paise Five
Ltr Instant /Storage Type Only
All inclusive comprehensive maintenance cost for the period of one
year for the Reverse Osmosis water purification system up to 50 Ltr/
Hr capacity.Inclusive replacing and cleaning of membranes , change
9 79 Nos. 11111.01 Hundred Eleven Ea
of filter , uPVC pipe fitting and booster pump replacing one time in
twelve month and servicing of RO System of following capacity(
Services in Twelve months )(C) 50 Ltr Capacity
Rigid UPVC drain pipe of 10 Kg/cm2. rating with 9 mm thick.nitrile
10 40 Rmts 105.04 Hundred Five And Rmt.
rubber insulation.(D)25 mm dia.
Paise Four Only
Sr. Quantity Description of Item Rate Rs. Per Amount
Rate in Rate in words.
Supplying and erecting insulated pair of soft copper tubing open or Thousand One
11 40 Rmts concealed including power and control cable,necessary PVC drain 1158.47 Hundred Fifty Rmt.
pipes for Split AC machine up to 4 TR capacity Eight And Paise
Forty Seven Only
12 10 Nos. repairing of PCB of remote control of split ac machine 985.76 Ea
Seventy Six Only
Shifting of Split A.C. The Scope includes dismantling, shifting, re- Rupees One
installing & re-commissioning of the units including topping up of Thousand Nine
13 20 Nos. Refrigerant gas, minor civil work wiring existing piping M S Stand 1969.50 Hundred Sixty Ea
electrical cabling with PVC drown piping for 1.00, 1.5 & 2.0 TR Nine And Paise
capacity. Fifty Only
Rupees Twenty Five Lakh(s) Twenty One Thousand Two Hundred Ninety Six And Paise Seventy Three Only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
17 - 2026-27.pdf
amc condition.pdf
G S T LTR.pdf
GR.pdf
SBD Document.pdf
SCHEDULE A BA ND C.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .