| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.3 L+₹2,231.42 (0.53%)Rejected-Finance 2107 SUB TREASURY KOOTTANAD THRITHALA BLOCK PANCHAYATH | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.3 L+₹2,699.95 (0.64%)Rejected-Finance PARAYIL VALAPPIL VEEDU KOOTANAD P O PALAKKAD 679533 | PALAKKAD | KERALA | 679533 | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.3 L+₹4,115.30 (0.97%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹4.3 L+₹7,827.13 (1.85%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹5 L
EMD Value
₹12,500
Closing Date
25 Jul 2020, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER LSGD SUBDIVISION THRITHALA BLOCK PANCHAYAT KOOTTANAD.P.O,PALAKKAD.DIST,679533.PIN
RENOVATION OF PERINGODE YOUTH LIBRARY
2020_LSGD_372387_1
03/AEE/LSGD/TLA/20-21(1)
Open Tender
Civil Works - Buildings
Item Rate
120 days
o/o the AEE, LSGD Sub DnThrithala Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
online
₹12,500
Yes
23 Aug 2020
18 Jul 2020
29 Jul 2020
18 Jul 2020
25 Jul 2020
18 Jul 2020
Amount
Compound Wall
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.7.2 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1 : Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
Mukundan
MOHAMMED ALI P.V
YASAR A P
ASKER ALI VTM
Bidder Name
Mukundan
T SURENDRAN
YASAR A P
ASKER ALI VTM
MOHAMMED ALI P.V
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_527357.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .