Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70 CrAccepted-AOC | ₹70 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹76.0 CrRejected-Finance | ₹76.0 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹76.3 CrRejected-Finance | ₹76.3 Cr | L3 | Rejected-Finance Rejected |
| 4 | L4₹78.4 CrRejected-Finance | ₹78.4 Cr | L4 | Rejected-Finance Rejected |
| 5 | L5₹85.7 CrRejected-Finance | ₹85.7 Cr | L5 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
28 Mar 2023, 12:00 pmClosed
Chief Engineer Project Vartak
HQ Chief Engineer Project Vartak, Tezpur, Sonitpur - 784 001 (Assam)
DESIGN AND CONSTRUCTION/IMPROVEMENT OF BALIPARA - CHARDUAR - TAWANG ROAD FROM KM 173.240 TO KM 183.000 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH 13.495 KM) THROUGH EPC MODE
2023_BRO_577386_1
CE (P) VTK/NIB-26/2022 - 23
Open Tender
Civil Works - Roads
730 days
KM 173.240 to KM 183.000 on Road B - C - T
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,331
Chief Engineer Project Vartak
₹15 L
Yes
HQ Chief Engineer Project Vartak, Tezpur, Sonitpur
7 Dec 2023
27 Jan 2023
29 Mar 2023
27 Jan 2023
28 Mar 2023
27 Jan 2023
27 Jan 2023 - 1 Mar 2023
1 Mar 2023
Design and Construction/ Improvement of Balipara-Charduar-Tawang Road from Km 173.240 to Km 183.000 (Dirang By Pass) to NH Double Lane Specifications in the State of Arunachal Pradesh (Net Length 13.495 KM) through EPC mode
M/s Tenzing Construction
M/s AM Infrastructure Projects Pvt. Ltd.
TTC INFRA INDIA
M/s Rajshri Constructions
M/s Nabam Tullon LLP
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid