Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.2 LAccepted-AOC | L1 | Accepted-AOC Overall accepted | |
| 2 | L2₹38.6 L+₹9.4 L (32.3%)Rejected-AOC POLICE LINE ROAD KUMOUR PITHORAGARH | L2 | Rejected-AOC Overall disqualified | |
| 3 | Rejected-Technical | - | Rejected-Technical The Bidder did not qualifies the TQR |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
17 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of SE, OandM Circle, PTCUL, Haldwani
Repairing of revetment wall at tower location No. 12 and tower location No. 73 of 132KV Almora-Ranikhet S/C line under OandM Division, PTCUL, Almora
2023_PTC13_56429_1
SE(OandM)/PTCUL/HLD/60/2022-23
Open Tender
Civil Works - Others
Item Rate
180 days
132KV Almora-Ranikhet line
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,360
EE, OandM Division, PTCUL, Almora
₹1.0 L
Office of SE, OandM Circle, PTCUL, Haldwani
3 Aug 2023
18 Mar 2023
18 Apr 2023
18 Mar 2023
17 Apr 2023
18 Mar 2023
3 Apr 2023
Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6coarse sand :12 graded stone aggregate 20 mm nominal size) upto plingth level with: cement mortor 1:6 (1 cement : 6 corse sand) cost of all other material i.e cement, sand, stone etc. labour and T&P, leveling etc.
Building of revetment wall with rough stones and random rubbels with 1:5 cement mortor including cost of all other material i.e cement, sand and dismanteled stone of damaged revetment wall etc. labour and T&P, leveling etc.
Providing and laying in posotion cement concrete of specific grade including the cost of centering and shuttering -All work upto plingth level :1:3:6 (1 cement :3coarse :6 graded stone aggregate 20 mm nominal size).
Providing weep hole with 75mm PVC pipe ( pressure 6 Kg/Sqmm) in proper slope.
Removal of damaged wall and garbage from tower foundations and through it outside the tower foundation.
Saun Engineering and Construction Co P Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .