XEN MECHANICAL AND HOSPITAL DIVISION JAMMU
XEN MECHANICAL AND HOSPITAL DIVISION JAMMU
SHIFTING OF OUTER UNIT AND ALLIED WORKS OF PACKAGE AC PLANT OF SPINAL WARD OF GMCH, JAMMU..
2025_PWDJK_279759_1
MHDJ/e-NIT 92 of 2025-26
Open Tender
Repair and Maintenance Services
Turn-key
10 days
GMCH JAMMU
as per e nit
2 documents required · 2 mandatory
₹200
XEN MECHANICAL AND HOSPITAL DIVISION JAMMU
₹4,000
15 Jul 2025
25 Jun 2025
3 Jul 2025
25 Jun 2025
2 Jul 2025
26 Jun 2025
25 Jun 2025 - 2 Jul 2025
Amount
Shifting of the outer units of Package AC plant and allied works installed at Spinal ward of GMCH Jammu so the work of repairs/maintaince can be carried out on it. The job includes fabrication of structural steel work of platform, in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of 2 layers of approved steel primer and after that a coat of enamel. The Platform should be made of M S Angle 50x50x6 mm and MS Flat 50x6 mm and the size should be 4’ X 8’ and having slanting supports of MS angle welded with the available Iron railing . Complete job includes cost of material, taxes, skilled labour charges, to and fro charges etc. Complete Job.
Shifting of 22 TR Package unit from its installed position to the newly fabricated MS platform. The job includes disconnecting all the electrical and mechanicl connections and dragging the unit manually by the help of skilled labour to its new position. Then checking of leakages in copper piping circuit by filling nitrogen gas in the system,performing the leakage test by applying soap water solution over condenser Coils, and observing for bubble formation and remaining the Nitrogen gas then repairing of condenser coils at leakage spots by way of copper brazing. The entire system is to be first tested at low pressure and then at high pressure to make sure that there are no more leaks in the system and then vacuumising the system with deep vacuumising, up to 30 microns & charging of (R-22)24 Kg approx in the package unit .The job also includes p/f of outdoor condenser motor with fan blade – 01No, drier core- 01 No contactor-02 No, relay -01No expansion valve -01No, V-Belts in place of damaged ones and also replacement of damaged internal wiring of panel and testing and commissioning of the package unit on full load. Complete job includes cost of material, taxes, skilled labour charges, to and fro charges etc. Complete Job.
Provision for SITC of scroll compressor of 11 TR capacity in place of damaged compressor. Complete job includes cost of material, taxes, skilled labour charges, to and fro charges etc. Complete Job
SARAN AIRCON PVT LTD (BID ID -2394925)
VEE AUTO TRADERS (BID ID -2395006)
M/S HARI OM ENTERPRISES (BID ID -2395333)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .