Tender Value
₹29.5 Cr
EMD Value
₹58.9 L
Closing Date
8 Oct 2026, 6:00 pm
Executive Engineer KDA, Kota
KDA, Kota
Construction of CC Road from Bhandari Hospital to Maradiya Basti and Balita, Ward 28, Kota
2026_UITKo_598378_1
21/2026-27 (3)
Open Tender
Civil Works
Percentage
540 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
online sso
₹58.9 L
Yes
8 Oct 2026
19 Sept 2026
9 Oct 2026
19 Sept 2026
8 Oct 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. | 3.6 | Hect. | 12,513 | ₹45,046.8 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 9,081 | Cum | 178 | ₹16,16,418 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
1: 3: 6 or richer mix. | 8,750 | Cum | 637 | ₹55,73,750 |
| 4 | Random rubble dry stone Kharanja under floor. | 3,045.25 | Cum | 932 | ₹28,38,173 |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 2,346.52 | Cum | 3,847 | ₹90,27,062.44 |
| 6 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 4,045.26 | Cum | 4,934 | ₹1,99,59,312.84 |
| 7 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix / Design Mix | 4,091.4 | Cum | 5,609 | ₹2,29,48,662.6 |
| 8 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 261 | Cum | 5,185 | ₹13,53,285 |
| 9 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 21,873.26 | Sqm | 157 | ₹34,34,101.82 |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :
Walls (any thickness) including attached pilasters, buttresses plinth and string course. | 34,976 | Sqm | 289 | ₹1,01,08,064 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1060815.xls
BOQ • 0.36 MB
SBD_21_03.pdf
Tender Documents • 32.00 MB
NIT_21_2_3_corrigendum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .