| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | ₹5.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.8 LRejected-AOC | ₹5.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹6.5 LRejected-Finance | ₹6.5 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | N C SEBASTIAN L2 | P V VINOD KUMAR L1 | KCN CONSTRUCTION LLP L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of Compound wall | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | 8.47 ₹1,694 | 8.11 ₹1,622 | 9.43 ₹1,886 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 11.69 | cum | 328.25 ₹3,836.59 | 314.59 ₹3,676.93 | 365.59 ₹4,273.02 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.85 | cum | 7,238.92 ₹6,138.6 | 6,937.58 ₹5,883.07 | 8,062.25 ₹6,836.79 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 9.54 | cum | 7,632.84 ₹72,817.29 | 7,315.09 ₹69,785.96 | 8,500.97 ₹81,099.25 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 10.6 | sqm | 352.37 ₹3,735.12 | 337.7 ₹3,579.62 | 392.45 ₹4,159.97 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 21.2 | sqm | 766.16 ₹16,242.59 | 734.26 ₹15,566.31 | 853.29 ₹18,089.75 |
| 1.01 | OD453420/2025-2026:Laterite masonry with neatly dressed laterite stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials , labour charges etc.(MOD 50.6.7.1 of DAR) | 6.6 | cum | 6,351.16 ₹41,917.66 | 6,071.98 ₹40,075.07 | 7,073.52 ₹46,685.23 |
| 1.01 | OD452197/2025-2026:Laterite neatly dressed stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including cost of materials, labour charges etc. complete. (MOD 50.6.7.2 of DAR) | 13.36 | cum | 7,156.38 ₹95,616.39 | 6,928.47 ₹92,571.29 | 7,970.32 ₹1,06,491.45 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 136.67 | sqm | 337.41 ₹46,113.82 | 322.28 ₹44,046.01 | 375.79 ₹51,359.22 |
Tender Value
₹5.9 L
EMD Value
₹14,823
Closing Date
23 Feb 2026, 10:00 amClosed
Assistant Engineer
Alakode gramapanchayth
Alakode GP-Pro -No -235-2025-26-Construction Of Compound Wall To Alakode Veterinary Hospital
2026_LSGD_836021_18
8-E-TEN/ALKD/2025-2026
Open Tender
Civil Works - Others
270 days
Alakode
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,310
Yes
₹14,823
Yes
13 Apr 2026
13 Feb 2026
25 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Construction of Compound wall
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
OD453420/2025-2026:Laterite masonry with neatly dressed laterite stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials , labour charges etc.(MOD 50.6.7.1 of DAR)
OD452197/2025-2026:Laterite neatly dressed stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including cost of materials, labour charges etc. complete. (MOD 50.6.7.2 of DAR)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD454466/2025-2026: Providing and laying 60 mmm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine over and including 50 mm thick compacted bed of 6 mm broken stone ,filling the joints with fine sand etc. all complete as per the direction of engineers in charge.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407255.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_1407255.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid